ABERDEEN Sumner Avenue (SR 101) Sidewalk Maple St to Williams St |
ATP | 2024 | Construction | 450,000 | 1,381,420 | |
ABERDEEN US 101 Safety Improvements US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17 |
ATP | 2025 | Design | 450,000 | 2,205,000 | |
![]() |
AIRWAY HEIGHTS 10th Avenue Extension 10th Ave terminus to Hayford Rd |
UAP | 2022 | Construction | 2,467,406 | 3,799,424 |
AIRWAY HEIGHTS 6th Avenue Craig Rd to Russell St |
UAP | 2025 | Construction | 552,335 | 4,551,920 | |
![]() |
AIRWAY HEIGHTS Garfield U.S. 2 Roundabout Garfield Rd Intersection |
UAP | 2026 | Design | 2,018,552 | 3,889,039 |
ALGONA Ellingson Road Overlay Pacific Ave to UPRR |
SCPP | 2025 | Construction | 704,176 | 786,918 | |
ALGONA Algona Boulevard N Boundary Rd to S 5th St |
ATP | 2026 | Design | 545,058 | 605,620 | |
ALMIRA School Vicinity Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 9,563 | 28,690 | |
ALMIRA Citywide Maintenance Multiple Locations |
SCPP | 2026 | Design | 240,500 | 240,500 | |
![]() |
ANACORTES Commercial Avenue (SR 20 Spur) 13th St to 11th St |
UAP | 2021 | Bid Auth | 950,000 | 3,525,442 |
ARLINGTON 211th Place SR 530 to 67th Ave NE |
UAP | 2024 | Construction | 2,645,000 | 4,755,968 | |
AUBURN Auburn Way S Widening Hemlock St to Poplar St |
UAP | 2025 | Construction | 3,187,534 | 7,700,517 | |
![]() |
AUBURN Regional Growth Center Improvements B St NE and 3rd St NE to Auburn Wy N and 4th St NE |
UAP | 2025 | Construction | 1,872,227 | 3,443,134 |
AUBURN 49th Street NE Auburn Wy N to D St NE |
CSP | 2026 | Bid Auth | 504,000 | 630,000 | |
BAINBRIDGE ISLAND Madison Ave Nonmotorized Improvements SR 305 to Winslow Way |
CSP | 2026 | Construction | 500,000 | 3,876,681 | |
BAINBRIDGE ISLAND NE Wyatt Way Eagle Harbor Dr NE |
ATP | 2025 | Design | 500,000 | 3,928,489 | |
BATTLE GROUND SE Grace Avenue - Phase II NE 1st St to SE Rasmussen Blvd |
UAP | 2023 | Design | 3,000,000 | 6,310,056 | |
![]() |
BELLEVUE 150th Avenue SE 28th St to SE 38th St |
UAP | 2024 | Construction | 3,990,000 | 13,381,395 |
![]() |
BELLEVUE 123rd Avenue SE pedestrian improvements SE 60th Street to Newcastle Way |
CSP | 2026 | Construction | 600,000 | 1,783,578 |
BELLINGHAM Meridian St W Illinois St Roundabout |
UAP | 2022 | Construction | 575,000 | 1,105,689 | |
BELLINGHAM 12th Street and Finnegan Way McKenzie St and 11th St |
UAP | 2024 | Construction | 400,000 | 1,696,658 | |
![]() |
BELLINGHAM James Street Multimodal Safety Improvements Telegraph Rd to Gooding Ave |
CSP | 2026 | Application | 950,000 | 3,219,000 |
![]() |
BENTON CITY 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 509,451 | 536,264 |
![]() |
BINGEN City of Bingen 2025 Overlay Multiple Locations |
SCPP | 2026 | Design | 278,827 | 293,502 |
BINGEN SR 14 and Alder RRFB and IlluminationSidewalk Improvements Intersection of SR 14 and Alder St |
CSP | 2026 | Design | 216,505 | 227,900 | |
BLACK DIAMOND Roberts Drive Reconstruction Morgan St to Ginder Creek Crossing |
UAP | 2026 | Design | 3,565,750 | 4,195,430 | |
BLAINE Boblett Street Yew Ave to Ludwick Ave |
UAP | 2022 | Construction | 1,161,862 | 3,614,644 | |
![]() |
BONNEY LAKE LED Streetlight Conversion Citywide |
LED | 2025 | Construction | 157,500 | 157,500 |
BREMERTON E 11th Street and Perry Avenue Pitt Avenue to E 17th Street |
UAP | 2020 | Construction | 4,341,916 | 7,287,140 | |
BREMERTON Washington Avenue / 11th Street Pacific Ave to Manette Bridge |
UAP | 2023 | Construction | 1,742,143 | 7,260,650 | |
BREMERTON Warren Ave Sidewalk Burwell St to 4th St |
ATP | 2026 | Construction | 43,320 | 57,000 | |
![]() |
BREWSTER 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Design | 11,091 | 11,675 |
BRIDGEPORT 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Construction | 80,000 | 80,000 | |
![]() |
BRIER RRFB Installation Multiple Locations |
ATP | 2026 | Bid Auth | 74,218 | 87,315 |
BUCKLEY W Mason Ave Overlay Hinkleman Ext Rd to S Naches St |
APP | 2026 | Design | 398,000 | 442,900 | |
![]() |
BURIEN SW 148th Street 4th Ave SW to 6th Ave SW |
UAP | 2024 | Construction | 3,888,535 | 5,786,010 |
BURLINGTON East-West Connector Burlington Blvd to Walnut Street |
UAP | 2019 | Construction | 2,688,618 | 5,626,051 | |
![]() |
BURLINGTON LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 150,000 | 150,000 |
![]() |
CAMAS NW 38th Avenue NW Parker St to Grass Valley Park |
UAP | 2025 | Construction | 1,692,384 | 7,386,337 |
![]() |
CAMAS NE Third Ave Pedestrian and Bicycle Improvements NE Adams Street to NE Cedar Street |
CSP | 2026 | Design | 356,778 | 445,973 |
![]() |
CARBONADO Elk Loop Overlay 9th St NW to 9th St NW |
SCPP | 2026 | Construction | 140,805 | 140,805 |
![]() |
CARNATION 2024 Seal Coat Multiple Locations |
SCPP | 2025 | Construction | 128,085 | 135,446 |
![]() |
CARNATION Milwaukee Avenue Overlay Entwistle St to NE 50th St |
SCPP | 2025 | Design | 467,444 | 492,046 |
CARNATION McKinley Street Eugene St to Blanche St |
SCAP | 2024 | Construction | 459,422 | 839,209 | |
CASHMERE Sidewalk Improvements City of Cashmere |
ATP | 2026 | Design | 650,256 | 684,480 | |
![]() |
CASTLE ROCK 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 133,459 | 142,984 |
![]() |
CASTLE ROCK 2025 ADA Improvements Multiple Locations |
CSP | 2026 | Design | 536,170 | 564,390 |
CATHLAMET 2025 Maintenance Project Multiple Locations |
SCPP | 2026 | Design | 166,000 | 166,000 | |
![]() |
CATHLAMET Butler Street Reconstruction Main St(SR 409) to Una Ave |
SCAP | 2026 | Design | 341,387 | 341,387 |
![]() |
CATHLAMET S 3rd Street Sidewalk Maple St to Alder St |
ATP | 2026 | Design | 224,887 | 224,887 |
![]() |
CHEHALIS NW Louisiana Ave Overlay NW Louisiana Avenue from Chamber of Commerce Way through the roundabout at the southern leg of NW Arkansas Way |
APP | 2026 | Design | 808,921 | 898,790 |
![]() |
CHEHALIS SW 13th St Sidewalk and ADA Curb Ramp Improvements SW William Ave to SW Interstate Ave |
ATP | 2026 | Design | 479,412 | 592,680 |
CHELAN Sanders Street Pedestrian Improvements E Okanogan Ave and E Wapato Ave |
SCAP | 2025 | Design | 99,999 | 819,759 | |
CHELAN Lakeside Trail W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave. |
ATP | 2025 | Bid Auth | 500,000 | 3,602,414 | |
CHELAN Resin Bonded Stone Surfacing Pilot Bradley and Johnson Intersection Vicinity |
ATP | 2025 | Construction | 163,800 | 182,000 | |
CHELAN COUNTY Easy St and School St Intersection School Street Roundabout |
UAP | 2025 | Design | 800,000 | 2,431,217 | |
CHENEY Elm Street Overlay 6th Street Vicinity to Washington Street |
APP | 2025 | Design | 1,884,892 | 2,094,324 | |
CHENEY N 6th Street Roundabout Betz Road |
UAP | 2024 | Design | 966,854 | 1,074,283 | |
![]() |
CHENEY Elm Street Overlay Phase 2 N 6th St to 2nd St |
UAP | 2026 | Design | 1,172,277 | 1,302,530 |
![]() |
CHEWELAH 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 54,587 | 57,460 |
![]() |
CHEWELAH 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 171,732 | 180,771 |
![]() |
CHEWELAH 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Design | 64,025 | 67,395 |
![]() |
CHEWELAH W Main Avenue SR 395 to Hunt St |
SCAP | 2024 | Construction | 1,285,309 | 1,436,879 |
![]() |
CLARK COUNTY NE 152nd Avenue Padden Pkwy to NE 99th St |
UAP | 2025 | Design | 3,500,000 | 8,967,367 |
![]() |
CLARK COUNTY NE 179th St and NE 29th Ave Intersection Improvement NE 29th Ave Intersection |
UAP | 2026 | Design | 3,000,000 | 18,442,626 |
![]() |
CLARK COUNTY NE 68th Street Sidewalk Highway 99 to NE St Johns Rd |
SP | 2023 | Construction | 400,000 | 5,680,037 |
CLARK COUNTY Truman School Sidewalk NE 40th Ave and NE 44th St |
ATP | 2024 | Design | 200,000 | 430,000 | |
![]() |
CLARK COUNTY Highway 99 Sidewalk NE 102nd St NE 104th St |
ATP | 2026 | Design | 500,001 | 1,221,000 |
CLE ELUM 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Design | 77,407 | 81,482 | |
![]() |
CLE ELUM Second Street Roundabout Second St (SR 903) and Stafford Ave |
SCAP | 2024 | Construction | 621,457 | 719,704 |
CLE ELUM First Street - Phase 3 Oakes Ave to Peoh Ave |
SCAP | 2025 | Construction | 677,032 | 5,499,790 | |
CLE ELUM Second Street Pathway - Phase 1 N Stafford Ave to N Pennsylvania Ave |
ATP | 2025 | Construction | 548,798 | 590,182 | |
COLLEGE PLACE NE Damson Avenue Cargill Ave to Rose St |
UAP | 2024 | Construction | 1,261,405 | 1,426,561 | |
COLLEGE PLACE SW Mojonnier Road Improvements College Ave to Bluvue Ln |
UAP | 2025 | Design | 1,922,008 | 6,772,008 | |
COLLEGE PLACE Rose Street Multiuse Path Illumination NE Ash Ave to NE Carey Ct |
CSP | 2026 | Design | 1,825,692 | 2,028,547 | |
COLLEGE PLACE SE 8th Street Sidewalk Birch Ave to Larch Ave |
ATP | 2025 | Design | 657,900 | 731,000 | |
![]() |
COLTON 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 252,037 | 252,037 |
COLTON 2025 RRFB Steptoe St to Gregor Str |
ATP | 2026 | Design | 46,200 | 46,200 | |
COLVILLE 2025 Pavement Preservation - Red Town Multiple Locations |
SCPP | 2026 | Design | 2,000,000 | 2,105,263 | |
CONCRETE Secondary Access SR 20 to Airport Way |
SCAP | 2023 | Design | 500,000 | 3,414,000 | |
CONNELL 2024 Chip Seal W Clark Street |
SCPP | 2025 | Closeout | 113,586 | 119,565 | |
![]() |
CONNELL 2025 Crack Seal Multiple Locations |
SCPP | 2026 | Design | 108,300 | 114,000 |
![]() |
CONNELL W Fir Street Sidewalk Improvements SR 260 to Columbia Ave |
CSP | 2026 | Design | 492,030 | 546,700 |
COULEE CITY 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Design | 563,916 | 563,916 | |
![]() |
COULEE CITY McEntee Street Improvements Walnut St to Chelan St |
SCAP | 2025 | Design | 124,201 | 920,000 |
![]() |
COULEE DAM Sidewalk and ADA Ramp Replacement Town Limits |
CSP | 2026 | Application | 970,730 | 970,730 |
COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Design | 372,421 | 372,421 | |
![]() |
COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Design | 108,985 | 108,985 |
![]() |
COUPEVILLE Front and N Main Street Sidewalks Multiple Locations |
ATP | 2024 | Construction | 170,060 | 484,711 |
COVINGTON Lakepointe Boulevard SR 18 to SE 258th St |
UAP | 2021 | Construction | 994,019 | 1,362,939 | |
![]() |
COVINGTON SE 256th Street 168th Ave SE to 173rd Ave SE |
UAP | 2026 | Design | 4,995,482 | 11,150,627 |
CUSICK 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Design | 122,939 | 122,939 | |
![]() |
DAYTON 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 1,178,464 | 1,240,488 |
![]() |
DEER PARK 2025 Chip and Scrub Seal Multiple Locations |
SCPP | 2026 | Design | 1,249,585 | 1,388,427 |
DES MOINES 24th Avenue S Kent-Des Moines Rd (SR 516) to S 223rd St |
UAP | 2021 | Construction | 4,212,947 | 7,493,224 | |
DOUGLAS COUNTY 21st St NE N Baker Ave to N Devon Ave |
UAP | 2025 | Design | 1,518,791 | 1,786,813 | |
DUVALL NE Big Rock Road Overlay 275th Ave NE to 279th Ln NE |
APP | 2026 | Bid Auth | 357,000 | 420,000 | |
DUVALL 3rd Avenue School Crossing Improvement NE 163rd St Intersection |
ATP | 2026 | Bid Auth | 42,500 | 50,000 | |
EAST WENATCHEE Valley Mall Parkway Overlay Multiple Locations |
APP | 2026 | Design | 665,767 | 783,255 | |
EAST WENATCHEE 19th Street NW Phase 1 SR 28 to Bella Rio Apartments |
UAP | 2024 | Construction | 2,000,000 | 5,299,012 | |
EAST WENATCHEE 5th Street NE Safety and Multimodal Improvements N Baker Ave to N Kentucky Ave |
UAP | 2025 | Design | 2,500,000 | 2,995,175 | |
EATONVILLE Eatonville Pavement Preservation Multiple Locations |
SCPP | 2025 | Construction | 49,212 | 51,802 | |
![]() |
EATONVILLE Eatonville Hwy W Overlay Emerald Ridge Dr to Center St W |
SCPP | 2026 | Design | 533,573 | 561,656 |
![]() |
EATONVILLE 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 159,652 | 168,080 |
![]() |
EDMONDS Main Street complete streets improvements 6th Avenue to 8th Avenue |
CSP | 2026 | Construction | 449,897 | 1,671,003 |
![]() |
EDMONDS 7th Avenue N Pedestrian Improvements Bell St to Caspers St(SR 524) |
CSP | 2026 | Design | 379,600 | 484,180 |
![]() |
ELMA F Street Improvements Young St to Oakhurst St |
SCAP | 2026 | Design | 787,074 | 828,500 |
![]() |
ENDICOTT 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 21,206 | 21,206 |
![]() |
ENDICOTT 2025 Scrub Seal Multiple Locations |
SCPP | 2026 | Design | 277,317 | 277,317 |
ENTIAT 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 475,345 | 500,362 | |
![]() |
ENUMCLAW Warner Avenue Overlay Berninger St to Blake St |
APP | 2026 | Construction | 116,720 | 137,317 |
EPHRATA Nat Washington Way Overlay A Street SE to 2nd Ave SE |
APP | 2024 | Design | 532,327 | 591,385 | |
EVERSON 2025 Maintenance Project Multiple Locations |
SCPP | 2026 | Design | 55,338 | 58,250 | |
EVERSON 2025 Otta Seal Approximately Meade Ave to Everson Rd and Washington St. to Shuksan Way |
SCPP | 2026 | Design | 1,448,196 | 1,524,418 | |
EVERSON S Harkness Street W Main St to Lincoln St |
SCAP | 2025 | Design | 683,671 | 719,654 | |
EVERSON SR 544 Sidewalk Portions of Meade Ave and Nolte Rd |
CSP | 2026 | Design | 564,867 | 3,069,938 | |
FARMINGTON 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Design | 200,000 | 200,000 | |
FEDERAL WAY S 288th Street 16th Ave S to 34th Ave S |
UAP | 2022 | Construction | 2,081,535 | 3,178,973 | |
FEDERAL WAY Pacific Highway S (SR 99) S C/L to Weigh Station |
UAP | 2023 | Design | 2,500,000 | 3,770,000 | |
FEDERAL WAY Citywide Pedestrian Crossings RRFB Crossings |
ATP | 2024 | Bid Auth | 350,001 | 503,211 | |
![]() |
FERNDALE Ferndale Terrace Hendrickson Ave to Vista Dr |
UAP | 2025 | Construction | 2,855,316 | 5,501,743 |
FIFE 20th Street E Multimodal Improvements 5410 20th St E to 6400 block |
UAP | 2025 | Design | 8,683,852 | 11,028,083 | |
![]() |
FIRCREST 2024 Overlay Multiple Locations |
APP | 2025 | Construction | 566,655 | 671,553 |
![]() |
FIRCREST Alameda Avenue W Sidewalk Cypress Pt to Emerson St |
CSP | 2026 | Design | 472,556 | 555,947 |
![]() |
FORKS 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 2,000,000 | 2,105,263 |
![]() |
FORKS West E Street 5th Ave to S Forks Ave (SR 101) |
SCAP | 2025 | Design | 549,613 | 578,540 |
GARFIELD 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 1,700,000 | 1,700,000 | |
GEORGE 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Design | 691,810 | 691,810 | |
![]() |
GEORGE W Montmorency Multiuse Path Washington Way S to Windsor Ave |
ATP | 2026 | Design | 250,000 | 250,000 |
GIG HARBOR Wollochet Drive Signal Wagner Way |
UAP | 2025 | Construction | 1,227,050 | 1,718,804 | |
GIG HARBOR 56th Street Roundabout 38th Ave |
UAP | 2026 | Design | 1,644,460 | 2,740,766 | |
GIG HARBOR 38th Avenue Improvements Phase 2 56th St to Hunt St |
CSP | 2026 | Design | 750,000 | 4,456,572 | |
![]() |
GIG HARBOR Burnham Drive Sidewalk Eagles Club Driveway to 96th St |
ATP | 2025 | Construction | 1,524,574 | 4,933,502 |
![]() |
GOLD BAR Orchard Avenue Overlay 5th St to 10th St |
SCPP | 2026 | Design | 197,100 | 212,470 |
GOLDENDALE 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,000,000 | 1,052,632 | |
GOLDENDALE Darland Drive Reconstruction Railroad Ave to Mill St |
SCAP | 2026 | Bid Auth | 963,753 | 1,070,836 | |
![]() |
GRAND COULEE Spokane Way Improvements Alcan Rd to E Grand Coulee Ave (SR 174) |
SCAP | 2025 | Design | 126,876 | 1,015,000 |
![]() |
GRANITE FALLS 2025 Crack Seal Multiple Locations |
SCPP | 2026 | Construction | 35,513 | 39,459 |
![]() |
GRANITE FALLS 2025 Overlay Multiple Locations |
SCPP | 2026 | Design | 512,100 | 569,100 |
HARRINGTON ADA Ramp Replacement East Side of City |
ATP | 2026 | Design | 394,800 | 394,800 | |
![]() |
HOQUIAM City of Hoquiam Safe Routes to School City of Hoquiam |
ATP | 2024 | Construction | 345,748 | 1,749,908 |
![]() |
HUNTS POINT Hunts Point Lane Overlay Hunts Point Lane |
SCPP | 2026 | Bid Auth | 312,862 | 347,625 |
![]() |
ILWACO 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 1,500,000 | 1,578,947 |
![]() |
INDEX 2025 Crack Seal Multiple Locations |
SCPP | 2026 | Design | 28,050 | 28,050 |
![]() |
INDEX 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 341,120 | 341,120 |
![]() |
IONE 2025 Street Maintenance City Wide Multiple Locations |
SCPP | 2026 | Design | 250,000 | 250,000 |
ISSAQUAH Front Street S 135 ft s/o and 200 ft n/o SE Bush St Intersection |
CSP | 2026 | Construction | 244,805 | 331,006 | |
KALAMA 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 165,300 | 174,000 | |
KALAMA China Garden Road S 10th St to Gwynne Rd |
SCAP | 2025 | Construction | 626,430 | 671,592 | |
![]() |
KALAMA Old Pacific Highway Sidewalk 450ft n/o Quartz Way to 750ft n/o Quartz Way |
ATP | 2026 | Bid Auth | 315,030 | 331,610 |
KELSO 2025 Overlay Multiple Locations |
APP | 2026 | Bid Auth | 484,648 | 570,175 | |
KENMORE 61st Avenue NE Pedestrian and Bicycle Improvements NE 190th St to 62nd Ave NE |
UAP | 2026 | Construction | 2,213,330 | 3,768,303 | |
KENNEWICK Pedestrian Safety Improvements Multiple Locations |
CSP | 2026 | Closeout | 192,456 | 240,570 | |
KENT Reith Road 140ft s/o S 253rd St to 200ft w/o SR 516 |
UAP | 2023 | Construction | 1,834,250 | 5,437,988 | |
KENT 76th Avenue S South Phase 2600ft s/o S 212th St to 3660 ft s/o S 212th St |
UAP | 2025 | Construction | 2,654,664 | 15,224,824 | |
![]() |
KENT 132nd Avenue SE Pedestrian Improvement Phase 3 SE 276th St to SE 278th Pl |
CSP | 2026 | Design | 490,000 | 613,000 |
KENT 83rd Avenue S Sidewalk S 224th St to 700ft s/o S 224th St |
ATP | 2026 | Design | 625,600 | 782,000 | |
KETTLE FALLS High School Sidewalk Corridor High School Enterance to approximately 400' E of Juniper |
CSP | 2026 | Construction | 173,491 | 285,638 | |
KING COUNTY 68th Avenue S / S 124th Street Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St |
UAP | 2023 | Design | 1,706,037 | 2,132,547 | |
![]() |
KING COUNTY 16th Avenue SW Overlay SW 100th St to SW 107th St |
UAP | 2026 | Bid Auth | 1,437,600 | 1,797,000 |
![]() |
KING COUNTY Renton Avenue S 76th Ave S to S 130th St |
ATP | 2026 | Design | 160,000 | 200,000 |
KIRKLAND 100th Avenue NE NE 138th Pl to NE 145th St |
UAP | 2021 | Construction | 3,300,000 | 21,430,791 | |
KIRKLAND 132nd Avenue NE NE 110th Pl to NE 97th St |
SP | 2023 | Construction | 125,001 | 1,150,225 | |
![]() |
KIRKLAND Pedestrian Crossing at Lake Washington Institute of Technology 132nd Ave NE |
ATP | 2025 | Construction | 131,355 | 174,330 |
KITSAP COUNTY SE Lund Avenue Harris Rd SE Intersection |
UAP | 2023 | Design | 3,664,358 | 4,585,448 | |
![]() |
KITSAP COUNTY Lund Avenue Roundabout Chase Rd Roundabout |
UAP | 2025 | Design | 2,668,198 | 3,335,249 |
![]() |
LA CENTER 4th Street Cedar Ave to Highland Rd |
SCAP | 2026 | Design | 500,000 | 11,884,800 |
LA CENTER Pacific Highway Shared Use Path Larsen Dr to existing sidewalk |
ATP | 2026 | Design | 500,000 | 3,480,000 | |
![]() |
LA CONNER Washington Road St Pedestrian Improvements Washington Ave. Road St |
CSP | 2026 | Construction | 215,550 | 233,240 |
LACEY College Street NE Martin Way to 15th Ave NE |
UAP | 2022 | Construction | 3,080,000 | 5,819,212 | |
LACEY Rainier Road Improvements 66th Ave SE to Yelm Hwy |
UAP | 2026 | Design | 3,030,000 | 5,050,000 | |
LAKE FOREST PARK SR 104 40th Pl NE Roundabout |
UAP | 2021 | Design | 2,561,198 | 3,240,000 | |
![]() |
LAKEWOOD S Tacoma Way Signal 92nd St S |
UAP | 2025 | Construction | 399,399 | 670,665 |
LAKEWOOD Custer Road W Bridgeport Way SW to 75th ST W |
UAP | 2025 | Design | 2,976,687 | 3,720,858 | |
LAKEWOOD Nyanza Road SW Gravelly Lake Dr S to Gravelly Lake Dr N |
UAP | 2026 | Design | 1,250,001 | 4,000,000 | |
LAKEWOOD 112th Street and Idlewild Road Sidewalk Interlaaken Drive to Idlewild Elementary |
CSP | 2026 | Bid Auth | 727,000 | 909,000 | |
![]() |
LAKEWOOD Steilacoom Boulevard SW Sidewalk 87th Ave SW to Weller Rd SW |
SP | 2023 | Construction | 442,680 | 5,661,272 |
LAKEWOOD Interlaaken Drive Sidewalk Washington Blvd to 112th St |
ATP | 2026 | Bid Auth | 500,000 | 1,915,000 | |
LEAVENWORTH 2024 Scrub Seal - Red Town InitiativeIncre Multiple Locations |
SCPP | 2024 | Construction | 1,170,921 | 1,301,023 | |
LEAVENWORTH 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 113,035 | 141,694 | |
![]() |
LEAVENWORTH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 |
LEAVENWORTH Curb Ramp Improvements Multiple Locations |
ATP | 2025 | Construction | 299,992 | 351,921 | |
LONG BEACH Ocean Beach Blvd Pioneer Rd W to 26th St NW |
SCAP | 2026 | Design | 500,000 | 871,999 | |
![]() |
LONG BEACH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 |
![]() |
LONG BEACH 2nd Street NE Sidewalk Washington Ave S to 600ft e/o Washington Ave S |
ATP | 2025 | Construction | 241,813 | 257,540 |
LONGVIEW 46th Avenue SR 4 to Olympia Way |
UAP | 2021 | Construction | 3,331,544 | 5,919,825 | |
![]() |
LONGVIEW Olympia Way and Nichols Blvd Multiple Locations |
UAP | 2025 | Construction | 1,747,877 | 2,352,651 |
![]() |
LONGVIEW Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 |
![]() |
LONGVIEW 18th Avenue ADA Ramps Louisiana Street to Olympia Way |
CSP | 2026 | Construction | 117,224 | 151,345 |
![]() |
LYNDEN 1st and Main St Overlay Main St. approx. 2nd St. to 1st St. and 1st St. approx. Grover St. to RR tracks |
APP | 2026 | Design | 374,239 | 523,674 |
![]() |
LYNDEN W Main Berthusen Roundabout Berthusen Rd Intersection |
UAP | 2026 | Application | 1,200,001 | 5,058,863 |
![]() |
LYNDEN Schoolyard Park Complete Streets BC Ave to 8th St |
CSP | 2026 | Application | 500,000 | 752,114 |
LYNNWOOD Poplar Way Bridge 196th St SW to Alderwood Mall Blvd |
UAP | 2024 | Design | 5,000,000 | 42,085,000 | |
LYNNWOOD 44th Avenue W Underpass Pedestrian and Bicycle Improvement s/o 200th St SW to 204th St SW |
CSP | 2026 | Design | 1,000,000 | 7,608,000 | |
MABTON Main Street Reconstruction Project Washington St to SR 22 |
SCAP | 2022 | Construction | 295,963 | 2,381,514 | |
MALDEN 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 477,470 | 477,470 | |
![]() |
MALDEN Roadway Restoration Multiple Locations |
SCAP | 2026 | Application | 93,311 | 1,866,223 |
![]() |
MAPLE VALLEY Maple Valley Highway (SR 169) SE 253rd Pl to SE 260th St |
UAP | 2024 | Construction | 2,261,668 | 15,295,345 |
![]() |
MAPLE VALLEY SE Kent Kangley Road (SR 516) Sidewalk 800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE |
ATP | 2025 | Design | 742,383 | 927,980 |
MARCUS 2025 Fog Seal Multiple Locations |
SCPP | 2026 | Design | 231,220 | 231,220 | |
MARYSVILLE 156th Street NE Smokey Pt Blvd to Hayho Creek |
UAP | 2025 | Design | 1,440,000 | 1,800,000 | |
MARYSVILLE 53rd Ave NE Shared Used Path 61st St NE to SR 528 |
ATP | 2024 | Construction | 320,000 | 2,036,464 | |
![]() |
MATTAWA 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Bid Auth | 1,300,000 | 1,300,000 |
![]() |
MCCLEARY 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Bid Auth | 462,586 | 486,932 |
![]() |
MCCLEARY W Maple Street Sidewalk S 6th St to S Main St |
ATP | 2025 | Bid Auth | 495,843 | 521,940 |
![]() |
MEDICAL LAKE 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Design | 160,337 | 168,776 |
![]() |
MEDICAL LAKE 2025 Scrub Seal Multiple Locations |
SCPP | 2026 | Design | 1,294,679 | 1,362,961 |
MEDICAL LAKE Lefevre Street (SR 902) Ped/Bike Improvements Hancock Street North to Brooks Road |
CSP | 2026 | Construction | 1,824,728 | 2,242,491 | |
![]() |
MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Construction | 447,120 | 483,941 |
![]() |
MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Design | 250,240 | 272,000 |
MERCER ISLAND Island Crest Way Shared Use Path Phase 1 Island Park Elementary to SE 60th St |
ATP | 2026 | Design | 850,000 | 1,620,270 | |
![]() |
MESA 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 359,766 | 359,766 |
![]() |
METALINE FALLS 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Design | 192,500 | 192,500 |
![]() |
METALINE FALLS ATP Minimum Speed Feedback Signs City limits both sides of SR 31 |
ATP | 2026 | Application | 230,000 | 230,000 |
MILLWOOD 2025 Empire Ave Pavement Preservation Argonne to Butler |
SCPP | 2026 | Design | 80,000 | 84,211 | |
MILLWOOD Argonne Road Reconstruction - Phase 2 E Trent Ave to 150 ft s/o S Frederick Ave |
SCAP | 2025 | Design | 1,409,230 | 1,483,400 | |
MILLWOOD Argonne Road Reconstruction - Phase 1 150 ft s/o Frederick to N of Riverway |
SCAP | 2025 | Construction | 801,070 | 2,900,277 | |
MILTON Pacific Highway S (SR 99) Porter Way Intersection |
UAP | 2021 | Construction | 3,380,530 | 3,980,616 | |
![]() |
MILTON Porter Way Sidewalk Improvements 7th Ave to Juniper St |
ATP | 2026 | Design | 360,866 | 424,550 |
MONROE RRFB Crossings Multiple Locations |
ATP | 2026 | Construction | 70,090 | 87,613 | |
MONROE Freylands Blvd and Main Street Sidewalk Fryelands Bvld to Main St Roundabout |
ATP | 2026 | Design | 269,000 | 338,500 | |
MONTESANO 2025 Maintenance Project Multiple Locations |
SCPP | 2026 | Construction | 96,425 | 101,500 | |
MONTESANO 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Bid Auth | 280,000 | 300,000 | |
![]() |
MONTESANO Lake Sylvia Road Sidewalk McBryde Ave to Nevills Lane |
SCAP | 2026 | Construction | 45,509 | 669,000 |
MONTESANO McBryde Sidewalk CSP Satsop St to Adams St |
CSP | 2026 | Construction | 217,761 | 240,000 | |
MORTON 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Construction | 783,930 | 825,190 | |
![]() |
MOSES LAKE 2025 Chip Seal Multiple Locations |
APP | 2026 | Design | 1,045,618 | 1,307,023 |
![]() |
MOSES LAKE SR17 Yonezawa Roundabout Yonezawa Blvd Intersection |
UAP | 2026 | Design | 2,500,000 | 6,552,970 |
![]() |
MOSES LAKE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 105,000 | 105,000 |
MOSSYROCK City Wide ADA Retrofit City Wide |
CSP | 2026 | Design | 491,620 | 491,620 | |
![]() |
MOUNT VERNON Laventure Road Hoag Rd to Sigmar Ln |
UAP | 2025 | Design | 1,208,800 | 1,536,000 |
MOUNTLAKE TERRACE 66th Avenue W 220th St SW to N City Limits |
UAP | 2021 | Construction | 2,503,000 | 3,433,637 | |
MOXEE Iler Street Resurfacing Park Street to Rainer Avenue |
SCPP | 2026 | Construction | 337,060 | 397,404 | |
MOXEE 2025 Crack Seal Multiple Locations |
SCPP | 2026 | Construction | 160,177 | 177,974 | |
NAPAVINE Rush Road Stella Rd to Newaukum Valley Rd |
SCAP | 2026 | Design | 405,100 | 3,001,000 | |
NEWCASTLE SE May Creek Park Drive NonMotorized Improvements Phase 2 SE 84th Pl to 129th Ave SE |
ATP | 2026 | Design | 500,000 | 2,183,170 | |
![]() |
NEWPORT 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 238,628 | 251,188 |
![]() |
NORMANDY PARK Marine View Drive OverlayTh SW 197th St to Edgecliff Dr SW |
APP | 2026 | Bid Auth | 358,699 | 422,055 |
NORTH BEND South Fork Road Extension SR 202 to North Bend Wy |
UAP | 2026 | Design | 4,244,612 | 7,074,353 | |
![]() |
NORTH BEND North Bend Way Tollgate Park Entrance to Ribary Creek Bridge |
CSP | 2026 | Design | 1,002,518 | 1,222,585 |
NORTH BEND SR202 Sidewalk Gap North Bend Way to RR Tracks |
ATP | 2025 | Construction | 125,455 | 158,843 | |
NORTHPORT 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Design | 280,500 | 280,500 | |
![]() |
OAK HARBOR SW Swantown Ave Overlay SW Heller St to SW Fort Nugent Ave |
APP | 2026 | Design | 348,136 | 435,170 |
OAK HARBOR NE 7th Avenue e/o Oak Harbor St to Harvest Dr |
UAP | 2024 | Construction | 702,174 | 3,001,533 | |
![]() |
OAK HARBOR LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 220,000 | 220,000 |
![]() |
OAKESDALE 2025 Seal Coat Multiple Locations |
SCPP | 2027 | Design | 1,000,000 | 1,000,000 |
![]() |
OAKESDALE ADA Ramp Replacement Entire Town |
CSP | 2026 | Design | 400,000 | 400,000 |
![]() |
OAKVILLE School Street and W Pine Street SR 12 to Ash St and SR 12 to School St |
SCAP | 2024 | Bid Auth | 638,743 | 638,743 |
![]() |
OAKVILLE City Wide ADA Retrofit Multiple Locations |
CSP | 2026 | Design | 372,620 | 372,620 |
![]() |
ODESSA 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 1,004,932 | 1,004,932 |
OKANOGAN 3rd Avenue Improvements Irene St to Greta St |
SCAP | 2025 | Bid Auth | 1,235,000 | 1,300,000 | |
OLYMPIA Fones Road SE Pacific Ave SE to 18th Ave SE |
UAP | 2023 | Construction | 2,000,000 | 17,979,962 | |
![]() |
OLYMPIA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 |
OMAK Jonathan Avenue Pine St to Quince St |
SCAP | 2025 | Bid Auth | 792,300 | 834,000 | |
OMAK Central Ave Reconstruction Phase II Cedar St to Fir St |
SCAP | 2025 | Design | 940,405 | 989,900 | |
OROVILLE 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 209,409 | 220,430 | |
![]() |
OROVILLE Ironwood Street 12th Ave to 17th Ave |
SCAP | 2024 | Construction | 1,114,251 | 1,182,896 |
![]() |
ORTING Kansas Street Reconstruction SR 162 to Coe Ln |
UAP | 2025 | Design | 4,420,363 | 4,911,515 |
![]() |
ORTING LED Streetlight Conversion Citywide |
LED | 2025 | Construction | 49,000 | 49,000 |
![]() |
PACIFIC Ellingson Overlay West Valley Hwy to UPRR Crossing |
APP | 2025 | Design | 1,607,270 | 1,786,103 |
PACIFIC Interurban Trail Crossing Improvements Ellingson Rd |
ATP | 2025 | Design | 79,240 | 88,044 | |
PASCO Lewis Street 2nd Ave to Oregon Ave (SR 397) |
UAP | 2021 | Construction | 7,000,000 | 25,690,769 | |
PASCO Court Street Roundabout Rd 68 Roundabout |
UAP | 2025 | Construction | 1,415,000 | 2,950,731 | |
PATEROS 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 343,064 | 343,064 | |
PATEROS Commercial Avenue Multimodal Improvements Lakeshore Drive to S Dawson Street |
CSP | 2026 | Construction | 1,013,425 | 1,231,242 | |
PATEROS Downtown ADA Improvements Multiple Locations |
ATP | 2024 | Construction | 544,650 | 544,650 | |
PATEROS Resin Bonded Stone Surfacing Pilot Intersection Vicinity |
ATP | 2025 | Construction | 136,000 | 136,000 | |
PE ELL 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Design | 171,128 | 171,128 | |
PIERCE COUNTY 122nd Avenue E 146th St Ct E to 136th St E |
UAP | 2025 | Design | 5,000,000 | 18,501,901 | |
![]() |
PIERCE COUNTY 122nd Avenue E 153rd St Ct E to 146th St Ct E |
UAP | 2026 | Design | 4,999,999 | 13,151,000 |
PIERCE COUNTY 2025 RRFB School Crossing Gem Height Dr @ 94th Ave E and 182nd St E and Ainsworth Ave S @ Garfield St |
ATP | 2025 | Construction | 712,816 | 1,444,898 | |
POMEROY Main Street Sidewalk S 17th St to 25th St |
CSP | 2026 | Design | 999,700 | 999,700 | |
![]() |
PORT ANGELES Marine Drive Overlay Hill Street to Mill Bridge |
APP | 2026 | Design | 531,248 | 708,330 |
PORT ANGELES 8th Street Lincoln St to A St |
UAP | 2024 | Construction | 1,674,761 | 2,194,761 | |
PORT ANGELES Peabody St ADA Improvements Lauridsen St to First St |
CSP | 2026 | Design | 590,439 | 694,634 | |
PORT ORCHARD Bethel Avenue Bethel Rd, Lincoln Ave SE, Mitchell Rd SE |
UAP | 2023 | Construction | 985,493 | 1,241,866 | |
![]() |
PORT ORCHARD Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 650,000 | 650,000 |
![]() |
PORT ORCHARD LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 200,000 | 200,000 |
PORT TOWNSEND Tyler Street Overlay Jefferson St to Lawrence St |
APP | 2024 | Construction | 303,077 | 604,172 | |
![]() |
PORT TOWNSEND 2025 Chip Seal Multiple Locations |
APP | 2026 | Design | 264,617 | 414,618 |
![]() |
PORT TOWNSEND Lawrence Street Multimodal Improvements Harrison St to Walker St |
UAP | 2026 | Design | 2,992,000 | 4,131,000 |
![]() |
PORT TOWNSEND Washington Street and Walker Street Improvements Washington St and Gaines St to Walker St and Jefferson St |
ATP | 2025 | Design | 198,600 | 234,000 |
POULSBO Noll Road - Segment 3A Mesford Rd to NE Kevos Pond Dr |
UAP | 2022 | Construction | 1,510,402 | 7,686,518 | |
POULSBO Noll Road Phase 3B Lincoln Rd NE to Kevos Pond Dr |
UAP | 2024 | Construction | 1,049,598 | 4,138,894 | |
![]() |
POULSBO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 |
![]() |
POULSBO LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 175,000 | 175,000 |
PROSSER Alexander Court Improvements Highland Dr to Paterson Ave |
UAP | 2026 | Design | 909,391 | 1,113,700 | |
PULLMAN Orchard Drive Overlay From Orchard and Stadium Way northeast along Orchard to Valley then west along Valley to Cove Way |
APP | 2026 | Construction | 314,084 | 397,295 | |
PUYALLUP 7th Street Sidewalk 9th St to 11th St |
ATP | 2024 | Design | 350,000 | 579,000 | |
REDMOND Redmond Way (SR 202) and NE 76th Street Bear Ck to E Lake Samm Pkwy; SR 202 to Fred Meyer |
UAP | 2021 | Closeout | 1,588,500 | 3,416,181 | |
REDMOND Bel Red Road Buffered Bike Lanes NE 30th St to W Lake Sammamish Pkwy |
ATP | 2024 | Design | 650,000 | 3,062,000 | |
RENTON Rainier Avenue S/N S 3rd St (SR 900) to NW 3rd Pl |
UAP | 2023 | Construction | 5,355,150 | 26,454,839 | |
![]() |
RENTON SW 43rd Street W C/L to SR 167 Ramps |
UAP | 2025 | Bid Auth | 2,975,154 | 5,979,841 |
![]() |
RENTON 116th Avenue SE Sidewalk SE 162nd St to SE 160th St |
CSP | 2026 | Design | 303,890 | 1,445,758 |
RENTON S 7th Street Improvements Oakesdale Ave S to Burnett Ave S |
ATP | 2025 | Construction | 229,495 | 2,193,252 | |
RICHLAND Downtown Connectivity Improvements George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St |
UAP | 2024 | Design | 3,500,000 | 16,781,600 | |
RICHLAND Duportail Street Roundabouts Keene Rd to Queensgate Dr |
UAP | 2026 | Design | 1,572,686 | 3,773,521 | |
RICHLAND George Washington Way Sidewalk Comstock St to Bradley Blvd |
ATP | 2026 | Design | 850,000 | 1,062,500 | |
RIDGEFIELD S Royle Road S 15th St to S 5th Way |
UAP | 2023 | Construction | 2,930,531 | 5,687,249 | |
![]() |
RIDGEFIELD Hillhurst Pedestrian Improvements Multiple Locations |
CSP | 2026 | Construction | 260,000 | 348,300 |
RITZVILLE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 42,312 | 44,539 | |
RITZVILLE 1st Avenue Improvements Division St to Palouse St |
SCAP | 2025 | Construction | 375,432 | 418,525 | |
RITZVILLE 2025 RRFB Various Locations |
CSP | 2026 | Design | 207,421 | 218,337 | |
ROCK ISLAND Douglas Street Improvements Rock Island Rd to 3rd St SW |
SCAP | 2025 | Design | 106,850 | 898,350 | |
![]() |
ROCK ISLAND Saunders Road Shared Use Path City of Rock Island Saunders Road |
CSP | 2026 | Application | 385,000 | 385,000 |
ROCKFORD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 67,600 | 67,600 | |
ROCKFORD 2024 Pavement Preservation Multiple Locations |
SCPP | 2025 | Design | 160,450 | 160,450 | |
ROSALIA 2024 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 117,600 | 117,600 | |
ROSALIA 2025 Overlay Multiple Locations |
SCPP | 2026 | Design | 167,315 | 167,315 | |
![]() |
ROSLYN 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Design | 700,000 | 736,842 |
ROSLYN 2025 RRFB Intersection of 1st St and Pennsylvania Ave |
CSP | 2026 | Design | 76,000 | 80,000 | |
![]() |
ROY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 206,767 | 206,767 |
ROYAL CITY Apple Avenue Reconstruction Road 13 SW to Poplar St |
SCAP | 2026 | Design | 1,071,220 | 1,127,600 | |
![]() |
RUSTON 2024 Overlay 52nd to Park Ave |
SCPP | 2025 | Bid Auth | 352,222 | 370,760 |
RUSTON Park Street End of Road to Bennett St |
SCAP | 2023 | Construction | 879,049 | 1,288,116 | |
SEATAC Airport Station Pedestrian Improvements S 176th St/32nd Ave S and S 180th St |
UAP | 2025 | Design | 4,000,000 | 27,417,979 | |
SEATTLE East Marginal Way S S Atlantic to S Spokane St. |
UAP | 2020 | Construction | 3,000,000 | 19,393,875 | |
SEATTLE 4th Avenue S Walkway S Royal Brougham Way to I 90 Off-Ramp |
SP | 2023 | Construction | 247,000 | 639,570 | |
![]() |
SEDRO WOOLLEY 2025 Overlay Multiple Locations |
APP | 2026 | Bid Auth | 737,915 | 868,136 |
SEDRO WOOLLEY Township Street (SR 9) John Liner Rd / McGarigle Rd Intersection |
UAP | 2023 | Bid Auth | 3,404,134 | 4,255,167 | |
![]() |
SEDRO WOOLLEY JonesJohn Liner RR Undercrossing Reed St to 100ft w/o Sapp Rd |
UAP | 2026 | Design | 2,149,055 | 2,543,300 |
SEDRO WOOLLEY Cascade Trail West Extension Phase 2A Holtcamp Rd to Hodgin St |
ATP | 2024 | Design | 326,000 | 860,000 | |
SELAH 3rd Street Overlay Multiple Locations |
APP | 2026 | Bid Auth | 520,020 | 577,800 | |
SELAH E Goodlander Road Signal Landcaster Rd Signal |
UAP | 2025 | Construction | 538,020 | 622,800 | |
![]() |
SEQUIM Curb Ramp Replacement Project CSP City of Sequim |
CSP | 2026 | Bid Auth | 704,000 | 854,000 |
SHELTON Olympic Highway North C S to Wallace Kneeland Blvd |
UAP | 2025 | Design | 3,688,752 | 4,098,614 | |
SHORELINE 145th Street (SR 523) 3rd Ave NE to 5th Ave NE (I-5 Interchange) |
UAP | 2023 | Construction | 5,000,000 | 40,621,677 | |
SHORELINE N 145th Street (SR 523) Phase 1 Corliss Ave N to 3rd Ave NE |
UAP | 2024 | Construction | 5,000,000 | 11,845,978 | |
SHORELINE 145th Street Corridor Phases 2 and 3 Corliss Ave N to Interurban Trail |
UAP | 2026 | Design | 6,500,000 | 27,680,040 | |
SHORELINE 8th Avenue NW Sidewalk Sunset School Park to Richmond Beach Rd NW |
ATP | 2025 | Design | 330,000 | 1,870,942 | |
SNOHOMISH 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 424,999 | 500,000 | |
SNOHOMISH Avenue D Overlay Multiple Locations |
APP | 2025 | Design | 455,353 | 535,710 | |
![]() |
SNOHOMISH N Bickford Avenue Overlay 3000 Blk to N C/L |
APP | 2026 | Design | 963,135 | 1,347,900 |
SNOHOMISH 13th Street Intersection Improvements Park Ave |
ATP | 2025 | Design | 177,539 | 208,870 | |
![]() |
SNOHOMISH 2025 RRFB Multiple Locations |
ATP | 2026 | Construction | 85,403 | 100,474 |
SNOHOMISH COUNTY 35th Avenue W 156th St SW to 148th St SW |
UAP | 2023 | Construction | 3,062,777 | 4,000,864 | |
SNOHOMISH COUNTY Larch Way Roundabout Locust Wy and Logan Rd |
UAP | 2024 | Construction | 2,875,000 | 4,205,001 | |
SNOHOMISH COUNTY Alderwood Mall Parkway SR 525 to 168th St SW |
UAP | 2025 | Design | 4,500,000 | 16,155,483 | |
![]() |
SNOHOMISH COUNTY 204th Street SW ADA Upgrades Various Locations |
CSP | 2026 | Bid Auth | 408,106 | 569,410 |
SNOHOMISH COUNTY Puget Park Drive RRFBs Various |
ATP | 2025 | Construction | 242,371 | 372,878 | |
![]() |
SNOQUALMIE 384th Ave SE Sidewalk Newton Ave to SE Kimball Creek Dr |
ATP | 2024 | Construction | 518,909 | 3,599,774 |
SOAP LAKE 2024 Scrub Seal - Red Town Initative Multiple Locations |
SCPP | 2024 | Construction | 1,190,400 | 1,190,400 | |
![]() |
SOAP LAKE Canna Street and 1st Avenue NE Main Ave E to SR 17 |
SCAP | 2023 | Construction | 1,002,500 | 1,039,580 |
SOAP LAKE Main Avenue W Cherry St S to Ginkgo St S |
SCAP | 2024 | Construction | 839,783 | 839,783 | |
SOAP LAKE Daisy Street SR 17 Sidewalk Improvements Phase II Main Ave E to 3rd Ave SE |
SCAP | 2026 | Design | 76,425 | 566,100 | |
![]() |
SOUTH BEND 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 2,000,000 | 2,105,263 |
![]() |
SOUTH BEND First Street A St to C St |
SCAP | 2025 | Construction | 578,240 | 624,274 |
SOUTH BEND 2025 RRFBs Central Ave to Reid St |
CSP | 2026 | Design | 507,080 | 533,767 | |
![]() |
SOUTH PRAIRIE 2024 Otta Seal Multiple Locations |
SCPP | 2024 | Construction | 299,204 | 299,204 |
SOUTH PRAIRIE Pioneer Way E (SR 162) Emery St |
SCAP | 2025 | Design | 785,622 | 785,622 | |
SPOKANE Thor / Freya Couplet Hartson Ave to 150ft n/o Sprague Ave |
UAP | 2022 | Construction | 267,333 | 3,462,911 | |
SPOKANE Maple Street and Walnut Street 5th Ave to 1st Ave |
UAP | 2024 | Construction | 920,400 | 2,681,883 | |
SPOKANE Riverside Ave. Monroe St to Wall St |
UAP | 2025 | Design | 887,000 | 1,774,000 | |
SPOKANE PalouseFreya Roundabout 150 feet south west and east of intersection and 250 ft north of the intersection |
UAP | 2026 | Design | 1,563,600 | 5,716,800 | |
![]() |
SPOKANE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 |
SPOKANE Traffic Calming - Cycle 10 Multiple Locations |
CSP | 2026 | Construction | 500,000 | 2,909,768 | |
SPOKANE Traffic Calming - Cycle 11 Multiple Locations |
CSP | 2026 | Construction | 413,837 | 1,085,924 | |
![]() |
SPOKANE Spokane School Walk Routes Various |
CSP | 2026 | Design | 1,636,595 | 2,045,744 |
SPOKANE Haven Street Sidewalk Rockwell Ave to Heroy Ave |
SP | 2023 | Construction | 177,348 | 283,276 | |
SPOKANE Driscoll Blvd Sidewalks Garland Ave to Wellesley Ave |
ATP | 2026 | Design | 831,500 | 1,663,000 | |
SPOKANE COUNTY Hatch Road Phase 1 MP 0.60 to MP 1.10 |
UAP | 2024 | Construction | 1,511,795 | 2,019,726 | |
SPOKANE COUNTY Hatch Road Reconstruction Phase 2 MP 1.10 to MP 1.63 |
UAP | 2025 | Design | 2,434,400 | 3,043,000 | |
SPOKANE COUNTY ADA and Ped Safety Freya and Glenrose Streets |
CSP | 2026 | Construction | 334,446 | 386,193 | |
SPOKANE COUNTY Crestline Street Sidewalks 57th Ave to 63rd Ave |
CSP | 2026 | Design | 807,040 | 1,014,000 | |
SPOKANE COUNTY Rowan Ave. ADA Ramp Replacement Starr Rd to Idaho Rd |
ATP | 2025 | Construction | 336,437 | 446,456 | |
SPOKANE VALLEY Sprague Ave. Pedestrian Crossings Chronicle Rd and McKinnon Rd |
ATP | 2025 | Construction | 370,012 | 574,188 | |
SPRAGUE 4th Street Sidewalk SR 23 to E St |
ATP | 2024 | Design | 490,900 | 490,900 | |
![]() |
STANWOOD 80th Avenue NW Overlay 279th Pl NW to 284th St NW |
APP | 2026 | Construction | 133,627 | 160,739 |
![]() |
STANWOOD Twin City Mile Mainstreet Improvements 84th Ave NW to 88th Ave NW |
CSP | 2026 | Bid Auth | 817,483 | 961,745 |
STEVENSON 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 168,297 | 177,155 | |
![]() |
STEVENSON 2025 Overlay Seymour Street |
SCPP | 2026 | Design | 128,398 | 135,156 |
STEVENSON 1st Street Columbia St to Guardrail |
SCAP | 2025 | Construction | 225,175 | 1,013,958 | |
![]() |
SULTAN Sultan Basin Road Overlay 137th Pl SE to SR 2 |
APP | 2026 | Bid Auth | 655,086 | 727,875 |
![]() |
SUMAS 2025 Maintenance Project Multiple Locations |
SCPP | 2026 | Construction | 38,000 | 40,000 |
![]() |
SUMNER Stewart Road White River Bridge Butte Ave E to 140th Ave Ct E |
UAP | 2024 | Construction | 6,375,000 | 34,821,560 |
SUMNER Main St Crossings Alder Ave to 162nd Ave E |
CSP | 2026 | Design | 747,214 | 979,740 | |
![]() |
SUNNYSIDE Yakima Valley Highway Overlay 1st St to 6th St |
APP | 2025 | Construction | 336,252 | 437,715 |
SUNNYSIDE ADA Ramp Replacement Multiple Locations |
CSP | 2026 | Bid Auth | 437,138 | 514,280 | |
TACOMA E 64th Street McKinley Ave E to Portland Ave |
UAP | 2023 | Construction | 3,026,443 | 6,255,753 | |
![]() |
TACOMA Sheridan Avenue Phase 1 S 72nd St to S 64th St |
UAP | 2024 | Construction | 3,560,000 | 6,148,185 |
![]() |
TACOMA E Roosevelt Avenue Improvements E 38th St to E Sherman St |
UAP | 2026 | Bid Auth | 2,213,118 | 2,766,398 |
![]() |
TACOMA S 56th Street Crossing Improvements A St |
CSP | 2026 | Design | 673,421 | 841,777 |
![]() |
TENINO Old Hwy 99 Overlay Huston to WWTP |
SCPP | 2026 | Bid Auth | 506,104 | 532,740 |
![]() |
THURSTON COUNTY Marvin Road SE 22nd Ave to Union Mills Rd |
UAP | 2024 | Construction | 3,750,000 | 5,643,310 |
THURSTON COUNTY Yelm Hwy and Spurgeon Crk Rd SE Intersection Improvements Spurgeon Crk Rd SE Intersection |
UAP | 2026 | Design | 3,470,000 | 4,450,000 | |
![]() |
THURSTON COUNTY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 |
![]() |
TIETON 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Design | 500,000 | 526,316 |
![]() |
TONASKET Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 50,000 | 50,000 |
TONASKET Perfect Passage 1st Street to 4th Street |
CSP | 2026 | Construction | 1,017,153 | 6,298,435 | |
TOPPENISH Jackson Street and Juniper Street Monroe Ave to Magnolia St |
UAP | 2023 | Design | 1,386,360 | 1,540,400 | |
TOPPENISH Downtown Intersection Improvements Intersection Improvements |
CSP | 2026 | Design | 1,529,554 | 1,699,505 | |
![]() |
TUKWILA Southcenter Boulevard Signal 65th Avenue S |
UAP | 2025 | Bid Auth | 782,090 | 1,182,090 |
![]() |
TUKWILA S 124th St and 50th Pl S Vicinity of S 124th St and 50th Pl S intersection |
UAP | 2026 | Design | 900,404 | 1,151,487 |
TUMWATER Capitol Boulevard South, Trosper Road SE Ruby St to Market, Linda St to I-5 |
UAP | 2019 | Construction | 9,829,120 | 18,424,998 | |
TUMWATER Tumwater Boulevard NB I-5 On/Off Ramp Intersection |
UAP | 2024 | Design | 2,250,000 | 6,250,000 | |
![]() |
TUMWATER Linwood Avenue Sidewalk Susitna Ln to 2nd Ave |
SP | 2023 | Construction | 371,250 | 1,741,572 |
![]() |
TWISP Glover Street Revitalization 5th Ave to Twisp Ave |
CSP | 2026 | Design | 2,604,219 | 2,853,743 |
![]() |
TWISP North End SR 20 PedestrianBike Path Twisp River Br to Days Ln |
ATP | 2025 | Construction | 592,470 | 1,614,487 |
![]() |
UNIVERSITY PLACE Grandview Avenue Roundabout 36th St |
UAP | 2025 | Construction | 764,152 | 1,043,932 |
![]() |
VADER 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Design | 131,606 | 131,606 |
VANCOUVER SE 1st Street SE 177th Ave to SE 192nd Ave |
UAP | 2021 | Construction | 1,892,899 | 11,369,281 | |
VANCOUVER W Fourth Plain Boulevard Franklin St Intersection |
UAP | 2023 | Construction | 540,176 | 904,167 | |
VANCOUVER NE 137th Avenue NE 49th St to NE Fourth Plain Blvd |
UAP | 2024 | Construction | 3,250,000 | 28,658,398 | |
![]() |
VANCOUVER Main Street Pedestrian and Bicycle Improvements W 39th St to NE Hazel Dell Ave |
CSP | 2026 | Design | 500,000 | 2,480,675 |
![]() |
VANCOUVER Hazel Dell Avenue Multiuse Path Discovery Trail to Burnt Bridge Creek Greenway |
ATP | 2024 | Design | 500,000 | 683,000 |
![]() |
VANCOUVER SE McGillivray Blvd Chkalov Dr to 164th Ave |
ATP | 2026 | Design | 700,000 | 2,088,975 |
![]() |
WALLA WALLA E Chestnut Street Roundabout Approximately 200ft north south east and west |
UAP | 2025 | Construction | 1,110,000 | 2,318,427 |
![]() |
WALLA WALLA Myra Road South Extension SR 125 to Taumarson Rd |
UAP | 2026 | Construction | 1,981,760 | 9,548,331 |
WAPATO 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Closeout | 620,229 | 652,873 | |
WAPATO N Ahtanum Avenue Reconstruction W 1st St to End of Road |
SCAP | 2025 | Design | 807,975 | 850,500 | |
WAPATO S Naches Avenue FDR 4th St to 6th St |
SCAP | 2026 | Application | 535,990 | 564,200 | |
WARDEN 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Bid Auth | 2,000,000 | 2,105,263 | |
WARDEN 1st Street North Reconstruction N County Rd to Railroad tracks |
SCAP | 2025 | Bid Auth | 1,772,700 | 1,866,000 | |
WARDEN W First Street (SR 170) Pathway S County Rd to Railroad R/W |
ATP | 2024 | Design | 57,375 | 425,000 | |
WASHOUGAL 2024 Main Street Overlay Multiple Locations |
APP | 2025 | Construction | 722,690 | 967,582 | |
WASHOUGAL Shepherd Road Pedestrian Connection Washougal River Rd to Lebrun Blvd |
UAP | 2026 | Design | 3,473,835 | 4,342,294 | |
WASHOUGAL Evergreen Way Sidewalk 42nd St to Schmid Park |
ATP | 2025 | Construction | 392,345 | 461,582 | |
WENATCHEE Springwater Avenue Woodward Dr to Western Ave |
UAP | 2021 | Construction | 2,185,000 | 3,788,965 | |
WENATCHEE McKittrick Street Pine St to Pershing St (City Limits) |
UAP | 2023 | Construction | 1,913,123 | 2,449,465 | |
WENATCHEE Red Apple Road Vista Pl to Miller St |
UAP | 2024 | Design | 1,919,228 | 2,399,035 | |
WENATCHEE 9th Street Corridor Improvements Miller St to BNSF Railroad Crossing |
UAP | 2025 | Design | 1,199,000 | 1,499,170 | |
![]() |
WENATCHEE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 |
WENATCHEE Bridge Street Multimodal Corridor S Wenatchee Ave to S Columbia S |
CSP | 2026 | Design | 1,263,360 | 1,579,200 | |
![]() |
WEST RICHLAND Keene Road Overlay C/L to Bombing Range Rd |
APP | 2026 | Design | 400,000 | 748,638 |
WEST RICHLAND S Highlands Blvd and Keene Rd Intersection Improvements Keene Rd Intersection |
UAP | 2026 | Design | 782,000 | 920,000 | |
WESTPORT N Forrest Street Ocean Ave to 400 ft n/o Sprague Ave |
SCAP | 2024 | Construction | 750,756 | 790,270 | |
![]() |
WHITE SALMON Dock Grade Road Chip Seal SR14 to SR141 |
SCPP | 2026 | Design | 146,430 | 154,137 |
![]() |
WILBUR 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 31,476 | 31,476 |
WILBUR 2024 Overlay Multiple Locations |
SCPP | 2025 | Design | 716,277 | 716,277 | |
![]() |
WINLOCK NW Arden Avenue NW Fir St to W Walnut St |
SCAP | 2025 | Design | 814,076 | 856,923 |
WINTHROP 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 481,817 | 507,175 | |
WINTHROP Bridge Street Improvement Project Riverside Ave to Bluff St |
ATP | 2025 | Design | 528,675 | 556,500 | |
WOODINVILLE 131st Avenue NE (SR 202) Trestle Replacement NE 175th St to NE 177th Pl |
UAP | 2025 | Design | 5,000,000 | 16,287,938 | |
![]() |
WOODINVILLE 124th Ave NE Sidewalk NE 171st St to NE 165th St |
ATP | 2026 | Design | 750,000 | 2,453,700 |
WOODLAND 2024 S Pekin Overlay Davidson Ave to n/o Marty Lp |
APP | 2025 | Construction | 651,569 | 723,955 | |
![]() |
WOODLAND Pacific Avenue Sidewalk Hoffman St to Dale St |
ATP | 2026 | Design | 200,000 | 249,300 |
![]() |
YACOLT W Hoag Street Parcel Ave to Railroad Ave |
SCAP | 2025 | Bid Auth | 360,240 | 379,200 |
YACOLT Amboy Curb and ADA Retrofit Multiple Locations |
CSP | 2026 | Design | 288,373 | 303,551 | |
YAKIMA N 1st Street MLK Blvd to J St |
UAP | 2023 | Construction | 1,500,000 | 11,378,665 | |
![]() |
YAKIMA 34th Avenue Roundabouts Fruitvale Boulevard to 34th Avenue |
UAP | 2025 | Construction | 1,768,780 | 3,534,874 |
![]() |
YAKIMA Nob Hill Boulevard Improvements S 4th Ave to S 15th Ave |
UAP | 2025 | Construction | 957,599 | 1,255,649 |
YAKIMA S 72nd Avenue Roundabout W Washington Ave Intersection |
UAP | 2026 | Construction | 1,045,166 | 1,903,619 | |
YAKIMA Pedestrian improvements Intersection at 5th Avenue and D Street |
CSP | 2026 | Construction | 198,300 | 631,900 | |
![]() |
YARROW POINT 2025 Overlay Multiple Locations |
SCPP | 2026 | Bid Auth | 540,000 | 600,000 |
ZILLAH 1st Avenue Pedestrian Improvements 1st Ave Bulbouts |
CSP | 2026 | Design | 700,000 | 777,777 |