| ABERDEEN US 101 Safety Improvements US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17 |
ATP | 2025 | Construction | 438,330 | 2,200,818 | |
![]() |
AIRWAY HEIGHTS Garfield U.S. 2 Roundabout Garfield Rd Intersection |
UAP | 2026 | Design | 2,018,552 | 3,889,039 |
![]() |
ALGONA 2026 Overlay Multiple Locations |
SCPP | 2027 | Construction | 291,564 | 324,960 |
| ALGONA Algona Boulevard N Boundary Rd to S 5th St |
ATP | 2026 | Construction | 520,162 | 584,678 | |
![]() |
ALMIRA 2026 Chip and Scrub Seal Multiple Locations |
SCPP | 2027 | Construction | 590,524 | 592,156 |
| ANACORTES Commercial Avenue (SR 20 Spur) 13th St to 11th St |
UAP | 2021 | Construction | 687,769 | 2,941,364 | |
![]() |
ARLINGTON Island Crossing (SR 530) Roundabout Smokey Point Blvd |
UAP | 2027 | Design | 4,461,608 | 5,577,011 |
| AUBURN Auburn Way S Widening Hemlock St to Poplar St |
UAP | 2025 | Construction | 3,187,534 | 7,700,517 | |
| AUBURN 49th Street NE Auburn Wy N to D St NE |
CSP | 2026 | Construction | 504,000 | 807,829 | |
| BAINBRIDGE ISLAND NE Wyatt Way Eagle Harbor Dr NE |
ATP | 2025 | Construction | 350,928 | 3,896,124 | |
| BATTLE GROUND SE Grace Avenue - Phase II NE 1st St to SE Rasmussen Blvd |
UAP | 2023 | Design | 3,000,000 | 6,310,056 | |
| BELLEVUE 150th Avenue SE 28th St to SE 38th St |
UAP | 2024 | Construction | 3,990,000 | 13,381,395 | |
![]() |
BELLEVUE NE 2nd Street Bike Connection Bellevue Way NE to 108th Ave NE |
CSP | 2027 | Design | 1,628,418 | 2,049,823 |
![]() |
BELLEVUE Lakemont Boulevard RRFB SE 58th St |
ATP | 2027 | Construction | 161,722 | 236,275 |
![]() |
BELLINGHAM James Street Multimodal Safety Improvements Telegraph Rd to Gooding Ave |
CSP | 2026 | Construction | 950,000 | 3,966,235 |
![]() |
BENTON CITY SR 225 Sidewalks Dale Ave to Babs Ave |
ATP | 2027 | Design | 707,258 | 744,481 |
![]() |
BINGEN Alder and Cedar Sidewalks Multiple Locations |
CSP | 2027 | Design | 319,100 | 835,400 |
| BLACK DIAMOND Roberts Drive Reconstruction Morgan St to Ginder Creek Crossing |
UAP | 2026 | Design | 3,565,750 | 4,195,430 | |
![]() |
BLACK DIAMOND SR 169 Pedestrian Crossing Park Street |
ATP | 2027 | Design | 273,491 | 324,754 |
![]() |
BLAINE Blaine Multimodal Improvements Multiple Locations |
CSP | 2027 | Design | 475,000 | 630,000 |
![]() |
BLAINE Peace Portal Community Trail Hughes Avenue to Bell Road |
ATP | 2027 | Design | 560,000 | 745,000 |
![]() |
BOTHELL Bothell Way NE Multimodal Improvements Phase 1 Project Reder Way to NE 192nd St |
UAP | 2027 | Design | 3,000,000 | 36,136,000 |
![]() |
BOTHELL Bothell Way NE Multimodal Improvements Phase 2 Project County Line to 240th St SE |
UAP | 2027 | Design | 3,000,000 | 22,403,000 |
![]() |
BREMERTON Rocky Point Sidewalk Marine Drive to Crownhill Elementary |
ATP | 2027 | Construction | 64,722 | 80,903 |
![]() |
BREWSTER 2026 Street Maintenance Multiple Locations |
SCPP | 2027 | Construction | 15,152 | 15,950 |
![]() |
BREWSTER 7th Street Multimodal Improvements Main Ave to Bruce Ave |
CSP | 2027 | Construction | 1,305,280 | 1,399,324 |
![]() |
BRIER Vine Road Overlay Poplar Way to S C/L |
APP | 2027 | Construction | 697,450 | 845,329 |
![]() |
BUCODA Main Street Improvements 7th St to 5th St |
CSP | 2027 | Design | 880,627 | 1,201,460 |
| BURIEN SW 148th Street 4th Ave SW to 6th Ave SW |
UAP | 2024 | Construction | 3,888,535 | 5,786,010 | |
![]() |
BURIEN S 128th Street Occidental Ave S to SR 509 Off Ramp |
UAP | 2027 | Design | 1,500,000 | 3,570,000 |
![]() |
BURIEN S 152nd Street Project 4th Ave SW to Des Moines Memorial Drive S |
CSP | 2027 | Design | 800,000 | 4,410,000 |
![]() |
BURIEN RRFB Pedestrian Improvements Various Locations |
ATP | 2027 | Construction | 141,122 | 190,160 |
![]() |
BURLINGTON 2026 Overlay Multiple Locations |
APP | 2027 | Construction | 675,712 | 750,795 |
| CAMAS NE Third Ave Pedestrian and Bicycle Improvements NE Adams Street to NE Cedar Street |
CSP | 2026 | Construction | 264,161 | 335,202 | |
![]() |
CAMAS Camas Pedestrian Crossing Improvements Multiple Locations |
CSP | 2027 | Construction | 323,130 | 403,913 |
![]() |
CARNATION Royal Glen Scrub Seal Multiple Locations |
SCPP | 2027 | Construction | 154,208 | 171,342 |
| CASHMERE Sidewalk Improvements City of Cashmere |
ATP | 2026 | Construction | 526,722 | 566,944 | |
| CATHLAMET Butler Street Reconstruction Main St(SR 409) to Una Ave |
SCAP | 2026 | Construction | 255,566 | 256,566 | |
| CATHLAMET S 3rd Street Sidewalk Maple St to Alder St |
ATP | 2026 | Construction | 249,564 | 250,564 | |
![]() |
CHEHALIS Chehalis Downtown Rejuvenation N Market Blvd and N National Avenue |
UAP | 2027 | Design | 4,000,000 | 8,109,650 |
![]() |
CHEHALIS Interstate Avenue Sidewalk Parkland Avenue to south of Best Western |
ATP | 2027 | Construction | 242,987 | 304,598 |
| CHELAN Sanders Street Pedestrian Improvements E Okanogan Ave and E Wapato Ave |
SCAP | 2025 | Construction | 87,616 | 834,103 | |
![]() |
CHELAN Farnham St. and Webster Ave. Pedestrian Improvements US 97A SRMP 233.90 to 234.00 |
CSP | 2027 | Design | 317,260 | 352,514 |
| CHELAN Lakeside Trail W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave. |
ATP | 2025 | Construction | 500,000 | 4,159,180 | |
| CHELAN COUNTY Easy St and School St Intersection School Street Roundabout |
UAP | 2025 | Design | 800,000 | 2,431,217 | |
| CHENEY N 6th Street Roundabout Betz Road |
UAP | 2024 | Construction | 777,157 | 863,509 | |
![]() |
CHENEY Elm Street Overlay Phase 2 N 6th St to 2nd St |
UAP | 2026 | Construction | 649,688 | 724,644 |
| CLARK COUNTY NE 152nd Avenue Padden Pkwy to NE 99th St |
UAP | 2025 | Construction | 3,500,000 | 10,439,417 | |
![]() |
CLARK COUNTY NE 179th St and NE 29th Ave Intersection Improvement NE 29th Ave Intersection |
UAP | 2026 | Construction | 3,000,000 | 20,795,738 |
| CLARK COUNTY Truman School Sidewalk NE 40th Ave and NE 44th St |
ATP | 2024 | Design | 200,000 | 430,000 | |
![]() |
CLARK COUNTY Highway 99 Sidewalk NE 102nd St NE 104th St |
ATP | 2026 | Construction | 500,001 | 1,152,241 |
![]() |
CLE ELUM 2026 Seal Coat Multiple Locations |
SCPP | 2027 | Construction | 210,213 | 233,570 |
| CLE ELUM First Street - Phase 3 Oakes Ave to Peoh Ave |
SCAP | 2025 | Construction | 677,032 | 5,499,790 | |
| CLE ELUM Second Street Pathway - Phase 1 N Stafford Ave to N Pennsylvania Ave |
ATP | 2025 | Construction | 548,798 | 590,182 | |
| COLLEGE PLACE SW Mojonnier Road Improvements College Ave to Bluvue Ln |
UAP | 2025 | Bid Auth | 1,922,008 | 6,772,008 | |
| COLLEGE PLACE Rose Street Multiuse Path Illumination NE Ash Ave to NE Carey Ct |
CSP | 2026 | Construction | 652,712 | 969,937 | |
| COLVILLE 2025 Pavement Preservation - Red Town Multiple Locations |
SCPP | 2026 | Construction | 2,000,000 | 2,105,263 | |
| CONNELL W Fir Street Sidewalk Improvements SR 260 to Columbia Ave |
CSP | 2026 | Construction | 421,044 | 469,867 | |
![]() |
COULEE CITY 2nd Street Reconstruction Washington St to US 2 |
SCAP | 2027 | Design | 1,280,300 | 1,280,300 |
| COULEE CITY McEntee Street Improvements Walnut St to Chelan St |
SCAP | 2025 | Construction | 113,443 | 905,596 | |
![]() |
COULEE DAM Sidewalk and ADA Ramp Replacement Town Limits |
CSP | 2026 | Design | 970,730 | 970,730 |
| COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Construction | 440,710 | 445,710 | |
![]() |
COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Design | 108,985 | 108,985 |
| COVINGTON SE 256th Street 168th Ave SE to 173rd Ave SE |
UAP | 2026 | Design | 4,995,482 | 11,150,627 | |
![]() |
DAVENPORT 2026 Scrub Seal Multiple Locations |
SCPP | 2027 | Construction | 849,328 | 894,200 |
![]() |
DAYTON Main Street Multimodal Improvements Cottonwood St to Patit Rd |
CSP | 2027 | Design | 2,612,500 | 2,750,000 |
![]() |
DES MOINES 24th Avenue South S 223rd St to S 216th St |
UAP | 2027 | Application | 5,000,000 | 9,112,748 |
| DOUGLAS COUNTY 21st St NE N Baker Ave to N Devon Ave |
UAP | 2025 | Construction | 1,291,241 | 1,734,641 | |
![]() |
DOUGLAS COUNTY 5th St NE N Kentucky Ave to N Lyle Ave |
UAP | 2027 | Design | 1,985,665 | 2,336,077 |
![]() |
DUPONT 2025 Center Drive Overlay Phase 4A Powerline Rd to Palisade Blvd |
APP | 2027 | Construction | 578,499 | 755,317 |
![]() |
DUPONT 2025 Center Drive Overlay Phase 4B Palisade Blvd to Kincaid St |
APP | 2027 | Construction | 543,437 | 734,820 |
![]() |
DUVALL NE 150th Sidewalk Extension 275th Place NE to 278th Ave NE |
ATP | 2027 | Design | 672,000 | 840,000 |
| EAST WENATCHEE 5th Street NE Safety and Multimodal Improvements N Baker Ave to N Kentucky Ave |
UAP | 2025 | Construction | 1,469,280 | 5,050,436 | |
![]() |
EAST WENATCHEE N Kentucky Avenue Multimodal Improvements Grant Rd to 9th St NE |
CSP | 2027 | Design | 4,500,000 | 8,617,735 |
![]() |
EAST WENATCHEE East Wenatchee Pedestrian Safety Improvements Various |
CSP | 2027 | Construction | 575,473 | 677,027 |
| EATONVILLE Eatonville Hwy W Overlay Emerald Ridge Dr to Center St W |
SCPP | 2026 | Construction | 377,292 | 418,500 | |
| EATONVILLE 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 301,085 | 316,952 | |
![]() |
EATONVILLE 2027 Overlay Multiple Locations |
SCPP | 2027 | Design | 676,116 | 711,702 |
| EDMONDS 7th Avenue N Pedestrian Improvements Bell St to Caspers St(SR 524) |
CSP | 2026 | Construction | 273,718 | 454,135 | |
![]() |
EDMONDS Citywide Pedestrian Enhancements 96th Ave W to Five Corners 3rd Ave. S Giltner 76th Ave. W 236th St. SW |
CSP | 2027 | Design | 679,639 | 883,499 |
![]() |
ELLENSBURG 2026 Overlay Umptanum Rd to Mountain View Ave |
APP | 2027 | Construction | 452,773 | 612,458 |
![]() |
ELLENSBURG Umptanum Road - Anderson Road Roundabout Umptanum Rd Intersection |
UAP | 2027 | Design | 1,087,450 | 1,672,960 |
![]() |
ELMA 2026 Maintenance Multiple Locations |
SCPP | 2027 | Design | 144,875 | 152,500 |
| ELMA F Street Improvements Young St to Oakhurst St |
SCAP | 2026 | Construction | 584,340 | 615,095 | |
![]() |
ELMA W Main Street ADA 12th St to 14th St |
ATP | 2027 | Construction | 332,240 | 349,726 |
![]() |
ELMER CITY Speed Feedback Signs and Striping Multiple Locations |
ATP | 2027 | Design | 134,800 | 134,800 |
| ENDICOTT 2025 Scrub Seal Multiple Locations |
SCPP | 2026 | Construction | 179,950 | 179,950 | |
![]() |
EPHRATA 2026 Chip Seal Multiple Locations |
APP | 2027 | Construction | 595,684 | 661,871 |
![]() |
EVERETT RRFB Crossing Improvements Multiple Locations |
CSP | 2027 | Design | 874,358 | 1,092,947 |
| EVERSON S Harkness Street W Main St to Lincoln St |
SCAP | 2025 | Construction | 474,397 | 659,127 | |
| EVERSON SR 544 Sidewalk Portions of Meade Ave and Nolte Rd |
CSP | 2026 | Construction | 564,867 | 3,744,684 | |
| FEDERAL WAY S 288th Street 16th Ave S to 34th Ave S |
UAP | 2022 | Construction | 2,081,535 | 3,178,973 | |
| FEDERAL WAY Pacific Highway S (SR 99) S C/L to Weigh Station |
UAP | 2023 | Bid Auth | 2,500,000 | 3,770,000 | |
![]() |
FEDERAL WAY City Center Greenway 100 feet e/o Pacific Hwy S to S 312th St |
CSP | 2027 | Construction | 422,928 | 791,271 |
| FEDERAL WAY Citywide Pedestrian Crossings RRFB Crossings |
ATP | 2024 | Construction | 350,001 | 563,637 | |
| FERNDALE Ferndale Terrace Hendrickson Ave to Vista Dr |
UAP | 2025 | Construction | 2,855,316 | 5,501,743 | |
![]() |
FERNDALE Main Street Reconstruction Barrett Rd to Old Settler Dr |
UAP | 2027 | Design | 3,000,000 | 10,288,544 |
![]() |
FERNDALE Main Street Complete Streets Barrett Rd to Old Settler Dr |
CSP | 2027 | Design | 1,000,000 | 1,250,000 |
| FIFE 20th Street E Multimodal Improvements 5410 20th St E to 6400 block |
UAP | 2025 | Design | 8,683,852 | 11,028,083 | |
![]() |
FIFE Port of Tacoma Road Interchange Phase 2A 12th Street E to 20th St E |
UAP | 2026 | Construction | 5,000,000 | 65,158,598 |
![]() |
FIRCREST 2025 Regents West Overlay Alameda Ave and 67th Ave |
APP | 2027 | Construction | 698,607 | 1,194,548 |
| FORKS West E Street 5th Ave to S Forks Ave (SR 101) |
SCAP | 2025 | Construction | 551,447 | 580,471 | |
| GEORGE W Montmorency Multiuse Path Washington Way S to Windsor Ave |
ATP | 2026 | Construction | 195,385 | 202,175 | |
| GIG HARBOR 56th Street Roundabout 38th Ave |
UAP | 2026 | Construction | 1,491,747 | 2,606,244 | |
| GIG HARBOR 38th Avenue Improvements Phase 2 56th St to Hunt St |
CSP | 2026 | Construction | 528,663 | 3,360,979 | |
| GOLDENDALE Darland Drive Reconstruction Railroad Ave to Mill St |
SCAP | 2026 | Construction | 916,989 | 1,018,876 | |
| GRAND COULEE Spokane Way Improvements Alcan Rd to E Grand Coulee Ave (SR 174) |
SCAP | 2025 | Design | 126,876 | 1,015,000 | |
![]() |
GRANDVIEW 2026 Overlay Multiple Locations |
APP | 2027 | Design | 580,388 | 644,875 |
![]() |
GRANGER 2025 Overlay Yakima Valley Hwy East City Limits to West City Limits |
SCPP | 2027 | Construction | 176,961 | 191,275 |
![]() |
GRANITE FALLS 2026 Overlay Multiple Locations |
SCPP | 2027 | Construction | 446,305 | 499,670 |
![]() |
GRANITE FALLS 2026 Pedestrian Improvement Program Multiple Locations |
CSP | 2027 | Construction | 33,151 | 61,201 |
| HUNTS POINT Hunts Point Lane Overlay Hunts Point Lane |
SCPP | 2026 | Construction | 255,212 | 289,569 | |
![]() |
ILWACO 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,261,361 | 1,332,748 |
| INDEX 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 204,634 | 204,634 | |
![]() |
IONE First and Blackwell Sidewalk Improvements First Ave and Blackwell St R/W |
ATP | 2027 | Construction | 680,881 | 680,881 |
![]() |
KAHLOTUS 2025 Chip Seal Project Multiple Locations |
SCPP | 2027 | Design | 303,500 | 303,500 |
![]() |
KALAMA Taylor Road Geranium St to end of road |
SCPP | 2027 | Construction | 100,151 | 108,815 |
![]() |
KELSO Kelso Drive Overlay Haussler Rd to Coweeman River Bridge |
APP | 2027 | Construction | 276,663 | 344,286 |
| KENMORE 61st Avenue NE Pedestrian and Bicycle Improvements NE 190th St to 62nd Ave NE |
UAP | 2026 | Construction | 2,213,330 | 3,768,303 | |
![]() |
KENMORE 80th Avenue NE NE Bothell Way(SR 522) to NE 185th St |
UAP | 2027 | Construction | 2,112,612 | 3,755,144 |
![]() |
KENMORE Arrowhead Drive Sidewalk NE 151st St to 64th Ave NE |
ATP | 2027 | Construction | 735,043 | 2,363,716 |
![]() |
KENT SE 248th Street Roundabout 116th Ave SE |
UAP | 2027 | Design | 3,500,000 | 7,875,000 |
| KENT 132nd Avenue SE Pedestrian Improvement Phase 3 SE 276th St to SE 278th Pl |
CSP | 2026 | Construction | 374,609 | 806,944 | |
![]() |
KENT S Reith Road Sidewalk 250 ft e/o Military Rd S to 42nd Ave S |
CSP | 2027 | Design | 1,399,999 | 1,954,000 |
| KENT 83rd Avenue S Sidewalk S 224th St to 700ft s/o S 224th St |
ATP | 2026 | Construction | 656,980 | 1,048,698 | |
| KING COUNTY 68th Avenue S / S 124th Street Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St |
UAP | 2023 | Construction | 1,229,199 | 1,596,499 | |
| KING COUNTY 16th Avenue SW Overlay SW 100th St to SW 107th St |
UAP | 2026 | Construction | 949,964 | 1,234,086 | |
| KING COUNTY Renton Avenue S 76th Ave S to S 130th St |
ATP | 2026 | Construction | 160,000 | 302,244 | |
![]() |
KIRKLAND Central Way Bike and Pedestrian Improvements 3rd St to Peter Kirk Lane |
CSP | 2027 | Design | 1,500,001 | 2,627,841 |
| KIRKLAND Pedestrian Crossing at Lake Washington Institute of Technology 132nd Ave NE |
ATP | 2025 | Construction | 131,355 | 174,330 | |
| KITSAP COUNTY SE Lund Avenue Harris Rd SE Intersection |
UAP | 2023 | Construction | 2,984,738 | 3,777,581 | |
| KITSAP COUNTY Lund Avenue Roundabout Chase Rd Roundabout |
UAP | 2025 | Construction | 2,135,843 | 2,694,805 | |
| LA CENTER 4th Street Cedar Ave to Highland Rd |
SCAP | 2026 | Construction | 500,000 | 17,972,535 | |
| LA CENTER Pacific Highway Shared Use Path Larsen Dr to existing sidewalk |
ATP | 2026 | Bid Auth | 500,000 | 3,480,000 | |
| LACEY College Street NE Martin Way to 15th Ave NE |
UAP | 2022 | Construction | 3,080,000 | 5,819,212 | |
| LACEY Rainier Road Improvements 66th Ave SE to Yelm Hwy |
UAP | 2026 | Design | 3,030,000 | 5,050,000 | |
| LAKE FOREST PARK SR 104 40th Pl NE Roundabout |
UAP | 2021 | Construction | 2,945,378 | 7,874,557 | |
![]() |
LAKE STEVENS 91st Avenue SE MultiUse Path Phase II 12th Place SE to 20th Street SE |
CSP | 2027 | Construction | 577,604 | 2,554,724 |
| LAKEWOOD Custer Road W Bridgeport Way SW to 75th ST W |
UAP | 2025 | Construction | 2,044,110 | 2,580,137 | |
| LAKEWOOD Nyanza Road SW Gravelly Lake Dr S to Gravelly Lake Dr N |
UAP | 2026 | Construction | 1,382,790 | 4,449,925 | |
| LONG BEACH Ocean Beach Blvd Pioneer Rd W to 26th St NW |
SCAP | 2026 | Construction | 625,000 | 1,258,339 | |
![]() |
LONG BEACH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 |
![]() |
LONGVIEW Columbia Heights Road Improvements Fishers Lane to Cascada Drive |
UAP | 2027 | Bid Auth | 3,000,000 | 15,000,000 |
| LYNNWOOD Poplar Way Bridge 196th St SW to Alderwood Mall Blvd |
UAP | 2024 | Construction | 5,000,000 | 58,215,995 | |
| LYNNWOOD 44th Avenue W Underpass Pedestrian and Bicycle Improvement s/o 200th St SW to 204th St SW |
CSP | 2026 | Construction | 1,000,000 | 9,144,940 | |
![]() |
LYNNWOOD 2025 Curb Ramps Project 66th Ave W from Meadowdale Rd to 168th St SW and east along that through Olympic View Dr |
CSP | 2027 | Construction | 480,367 | 627,664 |
![]() |
MALDEN Roadway Restoration Multiple Locations |
SCAP | 2026 | Construction | 57,260 | 1,155,208 |
![]() |
MANSFIELD Walnut Street Overlay Cemetery Rd to 2nd Ave |
SCPP | 2027 | Construction | 239,382 | 244,140 |
| MAPLE VALLEY Maple Valley Highway (SR 169) SE 253rd Pl to SE 260th St |
UAP | 2024 | Construction | 2,261,668 | 15,295,345 | |
| MAPLE VALLEY SE Kent Kangley Road (SR 516) Sidewalk 800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE |
ATP | 2025 | Construction | 853,740 | 1,333,281 | |
| MARYSVILLE 156th Street NE Smokey Pt Blvd to Hayho Creek |
UAP | 2025 | Construction | 1,482,398 | 1,953,397 | |
![]() |
MARYSVILLE 88th Corridor Improvements Phase 1 State Avenue to 55th Avenue |
UAP | 2027 | Construction | 3,947,343 | 17,048,700 |
![]() |
MARYSVILLE Ebey Waterfront Trail NE 61st St from 53rd Ave NE to 47th Ave from NE 61st St NE to 1st St |
CSP | 2027 | Design | 490,543 | 1,504,980 |
![]() |
MCCLEARY 6th Street Sidewalk W Simpson Ave to W Pine St |
CSP | 2027 | Design | 423,172 | 445,444 |
| MEDICAL LAKE 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Construction | 160,337 | 168,776 | |
| MEDICAL LAKE 2025 Scrub Seal Multiple Locations |
SCPP | 2026 | Construction | 844,703 | 889,254 | |
![]() |
MEDICAL LAKE 2026 Lefevre Street Restriping Brooks Rd to Idaho St |
CSP | 2027 | Design | 767,700 | 853,000 |
| MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Construction | 639,400 | 695,000 | |
| MERCER ISLAND Island Crest Way Shared Use Path Phase 1 Island Park Elementary to SE 60th St |
ATP | 2026 | Design | 850,000 | 1,620,270 | |
| MILLWOOD Argonne Road Reconstruction - Phase 2 E Trent Ave to 150 ft s/o S Frederick Ave |
SCAP | 2025 | Construction | 1,573,000 | 1,688,000 | |
| MILLWOOD Argonne Road Reconstruction - Phase 1 150 ft s/o Frederick to N of Riverway |
SCAP | 2025 | Construction | 801,070 | 2,900,277 | |
| MILTON Porter Way Sidewalk Improvements 7th Ave to Juniper St |
ATP | 2026 | Design | 360,866 | 424,550 | |
| MONROE Freylands Blvd and Main Street Sidewalk Fryelands Bvld to Main St Roundabout |
ATP | 2026 | Construction | 228,270 | 297,247 | |
![]() |
MONROE 179th Ave Sidewalk 154th St to 15000 block |
ATP | 2027 | Design | 684,200 | 855,250 |
![]() |
MONTESANO 2026 Maintenance Multiple Locations |
SCPP | 2027 | Construction | 114,610 | 127,510 |
![]() |
MONTESANO 2026 Chip Seal Multiple Locations |
SCPP | 2027 | Construction | 288,468 | 321,040 |
![]() |
MONTESANO Spruce Avenue and Main Street Improvements Main Street and Spruce Avenue |
SCAP | 2027 | Construction | 520,215 | 1,387,240 |
![]() |
MOSES LAKE SR17 Yonezawa Roundabout Yonezawa Blvd Intersection |
UAP | 2026 | Design | 2,500,000 | 6,552,970 |
| MOSSYROCK City Wide ADA Retrofit City Wide |
CSP | 2026 | Design | 491,620 | 491,620 | |
| MOUNT VERNON Laventure Road Hoag Rd to Sigmar Ln |
UAP | 2025 | Construction | 853,184 | 1,208,709 | |
![]() |
MOUNTLAKE TERRACE Main Street Revitalization Phase II 232nd St SW and 236th St SW |
UAP | 2027 | Bid Auth | 5,000,000 | 11,886,000 |
![]() |
MOXEE 2026 Overlay N Rivard Rd to East City Limits |
SCPP | 2027 | Construction | 151,146 | 180,005 |
![]() |
MUKILTEO Harbour Pointe Boulevard Paving W/O SR 525 to Harbour Reach Drive |
UAP | 2027 | Construction | 1,270,555 | 1,936,255 |
![]() |
NEWPORT 2026 Fog Seal Multiple Locations |
SCPP | 2027 | Construction | 50,216 | 52,859 |
![]() |
NEWPORT 2026 Chip Seal Multiple Locations |
SCPP | 2027 | Construction | 250,000 | 263,158 |
![]() |
NEWPORT 2027 Chip Seal Citywide |
SCPP | 2028 | Design | 266,000 | 280,000 |
![]() |
NORMANDY PARK SW 192nd Street and Normandy Park Drive SW 1st Ave S to Marine View Drive SW |
APP | 2027 | Construction | 686,313 | 823,181 |
![]() |
NORMANDY PARK 4th Avenue SW Intersection SW Normandy Rd |
UAP | 2027 | Construction | 737,923 | 983,915 |
![]() |
NORTH BEND 2025 Overlay Multiple Locations |
APP | 2027 | Construction | 678,690 | 873,362 |
| NORTH BEND South Fork Road Extension SR 202 to North Bend Wy |
UAP | 2026 | Design | 1,951,028 | 3,251,713 | |
![]() |
NORTH BEND North Bend Way Roundabout NW 8th Street |
UAP | 2026 | Construction | 2,101,117 | 3,665,617 |
| NORTH BEND North Bend Way Tollgate Park Entrance to Ribary Creek Bridge |
CSP | 2026 | Design | 1,002,518 | 1,222,585 | |
![]() |
NORTH BEND 2026 Sidewalk Gap Projects Various locations |
ATP | 2027 | Construction | 780,384 | 1,028,160 |
![]() |
NORTH BONNEVILLE CityWide Pedestrian Improvements Multiple Locations |
CSP | 2027 | Design | 371,854 | 391,425 |
![]() |
OAK HARBOR SE Barrington Drive Overlay Hwy 20 Dr to SE 8th Ave |
APP | 2027 | Construction | 512,568 | 766,415 |
![]() |
OAK HARBOR LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 220,000 | 220,000 |
![]() |
OAKVILLE City Wide ADA Retrofit Multiple Locations |
CSP | 2026 | Construction | 421,033 | 421,033 |
| OLYMPIA Fones Road SE Pacific Ave SE to 18th Ave SE |
UAP | 2023 | Construction | 2,000,000 | 17,979,962 | |
| OMAK Central Ave Reconstruction Phase II Cedar St to Fir St |
SCAP | 2025 | Closeout | 932,374 | 981,446 | |
| OROVILLE 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 109,927 | 115,712 | |
![]() |
OROVILLE 2026 Scrub Seal Multiple Locations |
SCPP | 2027 | Construction | 340,404 | 358,320 |
| ORTING Kansas Street Reconstruction SR 162 to Coe Ln |
UAP | 2025 | Construction | 4,347,007 | 6,128,819 | |
| PACIFIC Ellingson Overlay West Valley Hwy to UPRR Crossing |
APP | 2025 | Construction | 1,982,415 | 2,264,243 | |
![]() |
PALOUSE 2026 Scrub and Chip Seal Multiple Locations |
SCPP | 2027 | Design | 1,283,999 | 1,283,999 |
![]() |
PASCO Road 44 Sidewalk Infill Road 44 Canal |
CSP | 2027 | Design | 1,309,760 | 1,637,200 |
| PE ELL 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Construction | 149,569 | 150,569 | |
| PIERCE COUNTY 122nd Avenue E 146th St Ct E to 136th St E |
UAP | 2025 | Construction | 4,493,015 | 16,675,862 | |
| PIERCE COUNTY 122nd Avenue E 153rd St Ct E to 146th St Ct E |
UAP | 2026 | Design | 4,999,999 | 13,151,000 | |
![]() |
PIERCE COUNTY 159th Street E SR 7 to 3rd Ave Ct E |
UAP | 2027 | Design | 1,500,000 | 4,287,000 |
![]() |
PIERCE COUNTY 104th Street E e/o 16th Ave E to Portland Ave E |
CSP | 2027 | Design | 750,000 | 970,480 |
| POMEROY Main Street Sidewalk S 17th St to 25th St |
CSP | 2026 | Design | 999,700 | 999,700 | |
![]() |
PORT ANGELES N Street Reconstruction 6th St to 15th St |
UAP | 2027 | Design | 2,188,652 | 2,735,816 |
| PORT ANGELES Peabody St ADA Improvements Lauridsen St to First St |
CSP | 2026 | Construction | 652,419 | 843,595 | |
| PORT ORCHARD Bethel Avenue Bethel Rd, Lincoln Ave SE, Mitchell Rd SE |
UAP | 2023 | Construction | 985,493 | 1,241,866 | |
![]() |
PORT ORCHARD LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 200,000 | 200,000 |
![]() |
PORT TOWNSEND 2026 Chip Seal Multiple Locations |
APP | 2027 | Construction | 195,994 | 306,491 |
![]() |
PORT TOWNSEND Lawrence Street Multimodal Improvements Harrison St to Walker St |
UAP | 2026 | Construction | 2,318,184 | 2,997,078 |
| POULSBO Noll Road - Segment 3A Mesford Rd to NE Kevos Pond Dr |
UAP | 2022 | Construction | 1,510,402 | 7,686,518 | |
| POULSBO Noll Road Phase 3B Lincoln Rd NE to Kevos Pond Dr |
UAP | 2024 | Construction | 1,049,598 | 4,138,894 | |
![]() |
POULSBO 3rd Avenue Improvements Front St to Moe St |
UAP | 2027 | Design | 1,750,000 | 5,307,000 |
![]() |
PRESCOTT 2026 Sidewalk Improvements Multiple Locations |
CSP | 2027 | Construction | 291,070 | 291,070 |
| PROSSER Alexander Court Improvements Highland Dr to Paterson Ave |
UAP | 2026 | Construction | 881,008 | 1,101,940 | |
![]() |
PULLMAN Lybecker Sidewalk Infill Stadium Way to Upper Drive |
CSP | 2027 | Construction | 197,860 | 234,777 |
| PUYALLUP 7th Street Sidewalk 9th St to 11th St |
ATP | 2024 | Construction | 185,742 | 451,581 | |
![]() |
QUINCY 13th Ave SW and Road 9 NW Reconstruction Phase 1 Rd 9 NW to 700ft n/o SR 28 |
UAP | 2027 | Design | 2,391,428 | 3,241,719 |
![]() |
RAINIER 2026 Seal Coat Multiple locations |
SCPP | 2027 | Construction | 432,407 | 460,164 |
![]() |
RAYMOND 2026 Maintenance Multiple Locations |
SCPP | 2027 | Design | 71,193 | 74,940 |
![]() |
RAYMOND Duryea Street Reconstruction Phase II 60ft e/o US 101 to 11th St |
SCAP | 2027 | Construction | 1,783,974 | 1,877,868 |
![]() |
REARDAN 2026 Street Maintenance Multiple Locations |
SCPP | 2027 | Construction | 18,143 | 18,143 |
| REDMOND Bel Red Road Buffered Bike Lanes NE 30th St to W Lake Sammamish Pkwy |
ATP | 2024 | Construction | 650,000 | 4,041,841 | |
| RENTON SW 43rd Street W C/L to SR 167 Ramps |
UAP | 2025 | Construction | 2,918,017 | 5,913,000 | |
| RENTON 116th Avenue SE Sidewalk SE 162nd St to SE 160th St |
CSP | 2026 | Construction | 213,434 | 1,109,059 | |
| RICHLAND Downtown Connectivity Improvements George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St |
UAP | 2024 | Design | 3,500,000 | 16,781,600 | |
| RICHLAND Duportail Street Roundabouts Keene Rd to Queensgate Dr |
UAP | 2026 | Design | 1,572,686 | 3,773,521 | |
| RICHLAND George Washington Way Sidewalk Comstock St to Bradley Blvd |
ATP | 2026 | Bid Auth | 850,000 | 1,062,500 | |
![]() |
RIDGEFIELD S. Royle Road Hillhurst Rd to Royle Ct |
UAP | 2027 | Design | 3,500,000 | 5,500,000 |
![]() |
RIVERSIDE 2026 Scrub Seal Multiple Locations |
SCPP | 2027 | Design | 1,047,250 | 1,047,250 |
![]() |
ROCK ISLAND Saunders Road Shared Use Path City of Rock Island Saunders Road |
CSP | 2026 | Design | 385,000 | 385,000 |
![]() |
ROCKFORD 2026 Scrub Seal Multiple Locations |
SCPP | 2027 | Construction | 120,916 | 120,916 |
![]() |
ROSALIA 2026 Scrub Seal Multiple Locations |
SCPP | 2027 | Construction | 119,684 | 119,684 |
| ROSLYN 2025 RRFB Intersection of 1st St and Pennsylvania Ave |
CSP | 2026 | Construction | 131,897 | 138,839 | |
![]() |
ROY SR 507 Crossing Project W Huggins Greig Rd |
ATP | 2027 | Construction | 103,368 | 108,808 |
![]() |
ROYAL CITY 2026 Crack Seal Multiple Locations |
SCPP | 2027 | Bid Auth | 98,000 | 98,000 |
| ROYAL CITY Apple Avenue Reconstruction Road 13 SW to Poplar St |
SCAP | 2026 | Construction | 1,006,353 | 1,059,319 | |
| SEATAC Airport Station Pedestrian Improvements S 176th St/32nd Ave S and S 180th St |
UAP | 2025 | Bid Auth | 4,000,000 | 27,417,979 | |
| SEATTLE East Marginal Way S S Atlantic to S Spokane St. |
UAP | 2020 | Construction | 3,000,000 | 19,393,875 | |
![]() |
SEATTLE 4th Avenue S and S Forest Street Signal Intersection |
UAP | 2027 | Bid Auth | 1,318,675 | 2,221,409 |
![]() |
SEATTLE 4th Avenue S and Walker Street Signal Intersection |
UAP | 2027 | Bid Auth | 1,472,174 | 2,505,032 |
![]() |
SEDRO WOOLLEY JonesJohn Liner RR Undercrossing Reed St to 100ft w/o Sapp Rd |
UAP | 2026 | Design | 2,149,055 | 2,543,300 |
![]() |
SEDRO WOOLLEY Cascade Trail West Extension Phase 2A Hodgin Rd to Holtcamp Rd |
ATP | 2027 | Design | 915,450 | 1,077,000 |
| SHELTON Olympic Highway North C S to Wallace Kneeland Blvd |
UAP | 2025 | Design | 3,688,752 | 4,098,614 | |
| SHORELINE 145th Street (SR 523) 3rd Ave NE to 5th Ave NE (I-5 Interchange) |
UAP | 2023 | Construction | 5,000,000 | 40,621,677 | |
| SHORELINE N 145th Street (SR 523) Phase 1 Corliss Ave N to 3rd Ave NE |
UAP | 2024 | Construction | 5,000,000 | 11,845,978 | |
| SHORELINE 145th Street Corridor Phases 2 and 3 Corliss Ave N to Interurban Trail |
UAP | 2026 | Design | 6,500,000 | 27,680,040 | |
| SHORELINE 8th Avenue NW Sidewalk Sunset School Park to Richmond Beach Rd NW |
ATP | 2025 | Construction | 330,000 | 2,483,693 | |
| SNOHOMISH 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 424,999 | 500,000 | |
| SNOHOMISH Avenue D Overlay Multiple Locations |
APP | 2025 | Design | 455,353 | 535,710 | |
| SNOHOMISH N Bickford Avenue Overlay 3000 Blk to N C/L |
APP | 2026 | Construction | 450,928 | 699,114 | |
| SNOHOMISH 13th Street Intersection Improvements Park Ave |
ATP | 2025 | Construction | 172,891 | 223,402 | |
![]() |
SNOHOMISH 2025 Bickford Sidewalk Gaps Multiple Locations |
ATP | 2027 | Design | 644,012 | 805,016 |
| SNOHOMISH COUNTY Alderwood Mall Parkway SR 525 to 168th St SW |
UAP | 2025 | Design | 4,500,000 | 16,155,483 | |
![]() |
SNOHOMISH COUNTY 2025 Crossing Improvements Various Locations |
CSP | 2027 | Construction | 174,882 | 218,602 |
![]() |
SNOHOMISH COUNTY 18th Avenue W 151st St SW to Jefferson Way |
ATP | 2027 | Construction | 189,814 | 239,767 |
| SOAP LAKE Daisy Street SR 17 Sidewalk Improvements Phase II Main Ave E to 3rd Ave SE |
SCAP | 2026 | Design | 76,425 | 566,100 | |
| SOUTH BEND 2025 RRFBs Central Ave to Reid St |
CSP | 2026 | Design | 507,080 | 533,767 | |
![]() |
SOUTH CLE ELUM 2026 Seal Coat Main Street to South Cle Elum Way |
SCPP | 2027 | Construction | 22,510 | 22,510 |
| SOUTH PRAIRIE Pioneer Way E (SR 162) Emery St |
SCAP | 2025 | Design | 785,622 | 785,622 | |
| SPOKANE Maple Street and Walnut Street 5th Ave to 1st Ave |
UAP | 2024 | Construction | 920,400 | 2,681,883 | |
| SPOKANE Riverside Ave. Monroe St to Wall St |
UAP | 2025 | Design | 887,000 | 1,774,000 | |
| SPOKANE PalouseFreya Roundabout 150 feet south west and east of intersection and 250 ft north of the intersection |
UAP | 2026 | Design | 1,563,600 | 5,716,800 | |
| SPOKANE Spokane School Walk Routes Various |
CSP | 2026 | Construction | 1,270,421 | 1,588,026 | |
| SPOKANE Driscoll Blvd Sidewalks Garland Ave to Wellesley Ave |
ATP | 2026 | Design | 831,500 | 1,663,000 | |
![]() |
SPOKANE Alberta Street Gordon Ave to Longfellow Ave |
ATP | 2027 | Design | 652,800 | 816,000 |
| SPOKANE COUNTY Hatch Road Reconstruction Phase 2 MP 1.10 to MP 1.63 |
UAP | 2025 | Construction | 1,707,846 | 2,134,808 | |
| SPOKANE COUNTY Crestline Street Sidewalks 57th Ave to 63rd Ave |
CSP | 2026 | Construction | 706,648 | 910,587 | |
![]() |
SPOKANE COUNTY Centennial Trail Infill Boulder Beach to MP 0.54 |
CSP | 2027 | Design | 950,000 | 1,305,000 |
![]() |
SPOKANE COUNTY Aero Road Sidewalk Infill Dior Vicinity to Noah Vicinity |
ATP | 2027 | Design | 368,000 | 798,000 |
![]() |
SPOKANE VALLEY Barker Road - 4th Avenue Roundabout 4th Avenue Vicinity |
UAP | 2027 | Design | 2,373,975 | 2,967,469 |
![]() |
SPOKANE VALLEY Barker Road Corridor Sprague Ave to 4th Ave |
UAP | 2027 | Design | 1,462,558 | 1,828,198 |
| SPRAGUE 4th Street Sidewalk SR 23 to E St |
ATP | 2024 | Construction | 303,487 | 303,487 | |
![]() |
SPRINGDALE Townwide Preservation Project Multiple Locations |
SCPP | 2027 | Construction | 156,134 | 171,135 |
![]() |
STANWOOD 272nd Street NW and 72nd Avenue Sidewalk 276th St NW to 272nd St NW and 72nd Ave NW and 78th Ave NW |
CSP | 2027 | Closeout | 404,445 | 484,064 |
![]() |
STEVENSON Lasher Street Improvements Multiple Locations |
CSP | 2027 | Design | 950,000 | 2,386,512 |
| SUMNER Stewart Road White River Bridge Butte Ave E to 140th Ave Ct E |
UAP | 2024 | Construction | 6,375,000 | 34,821,560 | |
| SUMNER Main St Crossings Alder Ave to 162nd Ave E |
CSP | 2026 | Design | 747,214 | 979,740 | |
| TACOMA Sheridan Avenue Phase 1 S 72nd St to S 64th St |
UAP | 2024 | Construction | 3,560,000 | 6,148,185 | |
| TACOMA E Roosevelt Avenue Improvements E 38th St to E Sherman St |
UAP | 2026 | Closeout | 1,961,650 | 2,452,064 | |
![]() |
TACOMA S 12th Street Improvements S Grant St to S Cedar St |
UAP | 2027 | Design | 3,720,999 | 6,207,060 |
| TACOMA S 56th Street Crossing Improvements A St |
CSP | 2026 | Bid Auth | 673,421 | 841,777 | |
![]() |
TACOMA S Park Avenue Greenway S 86th St to S 76th St |
CSP | 2027 | Design | 478,746 | 598,432 |
![]() |
TEKOA 2026 Seal Coat Multiple Locations |
SCPP | 2027 | Construction | 674,246 | 674,246 |
| THURSTON COUNTY Yelm Hwy and Spurgeon Crk Rd SE Intersection Improvements Spurgeon Crk Rd SE Intersection |
UAP | 2026 | Design | 3,470,000 | 4,450,000 | |
![]() |
TIETON 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Construction | 292,028 | 313,898 |
![]() |
TIETON North Tieton Road Multimodal Improvements Wisconsin Ave to Pear Drive |
CSP | 2027 | Design | 796,014 | 837,910 |
![]() |
TOLEDO Augustus Street and 4th Street Sidewalks S 5th S to S 3rd St and Cowlitz St |
ATP | 2027 | Design | 425,667 | 452,837 |
![]() |
TONASKET 2026 Chip Seal Multiple Locations |
SCPP | 2027 | Construction | 1,018,862 | 1,018,862 |
| TOPPENISH Jackson Street and Juniper Street Monroe Ave to Magnolia St |
UAP | 2023 | Construction | 1,152,412 | 1,400,786 | |
| TOPPENISH Downtown Intersection Improvements Intersection Improvements |
CSP | 2026 | Construction | 1,133,776 | 1,373,690 | |
| TUKWILA Southcenter Boulevard Signal 65th Avenue S |
UAP | 2025 | Construction | 848,903 | 1,328,075 | |
| TUKWILA S 124th St and 50th Pl S Vicinity of S 124th St and 50th Pl S intersection |
UAP | 2026 | Design | 900,404 | 1,151,487 | |
| TUMWATER Tumwater Boulevard NB I-5 On/Off Ramp Intersection |
UAP | 2024 | Design | 2,250,000 | 6,250,000 | |
![]() |
TWISP Glover Street Revitalization 5th Ave to Twisp Ave |
CSP | 2026 | Construction | 2,757,993 | 3,054,748 |
| VADER 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Construction | 246,100 | 246,100 | |
| VANCOUVER SE 1st Street SE 177th Ave to SE 192nd Ave |
UAP | 2021 | Construction | 1,892,899 | 11,369,281 | |
| VANCOUVER NE 137th Avenue NE 49th St to NE Fourth Plain Blvd |
UAP | 2024 | Construction | 3,250,000 | 28,658,398 | |
| VANCOUVER Main Street Pedestrian and Bicycle Improvements W 39th St to NE Hazel Dell Ave |
CSP | 2026 | Bid Auth | 500,000 | 2,480,675 | |
| VANCOUVER Hazel Dell Avenue Multiuse Path Discovery Trail to Burnt Bridge Creek Greenway |
ATP | 2024 | Design | 500,000 | 683,000 | |
| VANCOUVER SE McGillivray Blvd Chkalov Dr to 164th Ave |
ATP | 2026 | Construction | 700,000 | 7,111,023 | |
![]() |
WAITSBURG Main Street Overlay Preston Ave 3rd St to 1st St |
SCAP | 2027 | Design | 100,000 | 744,400 |
| WALLA WALLA Myra Road South Extension SR 125 to Taumarson Rd |
UAP | 2026 | Construction | 1,981,760 | 9,548,331 | |
![]() |
WALLA WALLA Poplar Street Reconstruction 5th Ave to 14th Ave |
UAP | 2027 | Design | 3,000,000 | 11,125,000 |
| WAPATO N Ahtanum Avenue Reconstruction W 1st St to End of Road |
SCAP | 2025 | Construction | 618,431 | 651,730 | |
| WARDEN 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,614,073 | 1,699,024 | |
| WARDEN 1st Street North Reconstruction N County Rd to Railroad tracks |
SCAP | 2025 | Construction | 908,922 | 956,760 | |
| WARDEN W First Street (SR 170) Pathway S County Rd to Railroad R/W |
ATP | 2024 | Construction | 57,375 | 583,570 | |
| WASHOUGAL Shepherd Road Pedestrian Connection Washougal River Rd to Lebrun Blvd |
UAP | 2026 | Design | 3,473,835 | 4,342,294 | |
![]() |
WASHTUCNA 2026 Crack Seal Multiple Locations |
SCPP | 2027 | Construction | 51,200 | 51,200 |
![]() |
WATERVILLE N Chelan Ave Reconstruction Poplar St to 3rd St |
SCAP | 2027 | Construction | 125,053 | 440,558 |
| WENATCHEE Red Apple Road Vista Pl to Miller St |
UAP | 2024 | Construction | 1,830,292 | 2,465,206 | |
| WENATCHEE 9th Street Corridor Improvements Miller St to BNSF Railroad Crossing |
UAP | 2025 | Design | 1,199,000 | 1,499,170 | |
| WENATCHEE Bridge Street Multimodal Corridor S Wenatchee Ave to S Columbia S |
CSP | 2026 | Design | 1,263,360 | 1,579,200 | |
![]() |
WENATCHEE Orchard Avenue Curb Ramps Miller St to Western Ave |
ATP | 2027 | Design | 410,080 | 512,600 |
| WEST RICHLAND Keene Road Overlay C/L to Bombing Range Rd |
APP | 2026 | Construction | 351,310 | 657,510 | |
![]() |
WEST RICHLAND 2026 Overlay Keene Rd to Blue Heron Blvd |
APP | 2027 | Design | 674,500 | 950,000 |
| WEST RICHLAND S Highlands Blvd and Keene Rd Intersection Improvements Keene Rd Intersection |
UAP | 2026 | Bid Auth | 782,000 | 920,000 | |
![]() |
WESTPORT 2026 Maintenance Multiple Locations |
SCPP | 2027 | Design | 153,058 | 170,065 |
![]() |
WILKESON 2026 Townwide Chip Seal Multiple Locations |
SCPP | 2027 | Construction | 201,786 | 201,786 |
![]() |
WILKESON Railroad Avenue Curb Ramps Church St to E C/L |
ATP | 2027 | Construction | 146,191 | 151,191 |
![]() |
WILSON CREEK Kathy Blvd Preservation 5th Street to North City Limits |
SCPP | 2028 | Design | 32,000 | 32,000 |
![]() |
WINLOCK ADA Update Multiple Locations |
CSP | 2027 | Design | 394,915 | 415,700 |
| WINTHROP Bridge Street Improvement Project Riverside Ave to Bluff St |
ATP | 2025 | Construction | 574,551 | 649,046 | |
| WOODINVILLE 131st Avenue NE (SR 202) Trestle Replacement NE 175th St to NE 177th Pl |
UAP | 2025 | Bid Auth | 5,000,000 | 16,287,938 | |
| WOODINVILLE 124th Ave NE Sidewalk NE 171st St to NE 165th St |
ATP | 2026 | Construction | 315,563 | 1,357,370 | |
![]() |
WOODLAND 2026 Overlay BNSF Railroad to Goering St |
APP | 2027 | Construction | 682,544 | 912,003 |
![]() |
WOODWAY 2026 Overlay Multiple Locations |
SCPP | 2027 | Construction | 581,521 | 715,695 |
![]() |
YACOLT 2026 Seal Coat Multiple Locations |
SCPP | 2027 | Construction | 210,741 | 221,832 |
| YACOLT Amboy Curb and ADA Retrofit Multiple Locations |
CSP | 2026 | Design | 288,373 | 303,551 | |
![]() |
YAKIMA Fair Avenue Multimodal Improvements E Nob Hill Blvd to Pacific Ave |
CSP | 2027 | Design | 1,200,000 | 1,500,000 |
![]() |
YAKIMA COUNTY W Powerhouse Road Improvements S Naches Rd to Naches Heights Rd |
UAP | 2027 | Design | 2,063,388 | 3,579,235 |
| YARROW POINT 2025 Overlay Multiple Locations |
SCPP | 2026 | Construction | 568,892 | 640,602 | |
![]() |
YELM Rhoton Road NW Reconstruction Railway Rd SE to Yelm Loop Rd (SR 510) |
UAP | 2027 | Design | 3,179,750 | 7,833,776 |
![]() |
ZILLAH 2026 Overlay W 1st Ave to end of road |
SCPP | 2027 | Construction | 239,130 | 274,200 |