ABERDEEN
US 101 Safety Improvements
US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17
ATP 2025 Construction 438,330 2,200,818
AIRWAY HEIGHTS
Garfield U.S. 2 Roundabout
Garfield Rd Intersection
UAP 2026 Design 2,018,552 3,889,039
ALGONA
2026 Overlay
Multiple Locations
SCPP 2027 Construction 291,564 324,960
ALGONA
Algona Boulevard N
Boundary Rd to S 5th St
ATP 2026 Construction 520,162 584,678
ALMIRA
2026 Chip and Scrub Seal
Multiple Locations
SCPP 2027 Construction 590,524 592,156
ANACORTES
Commercial Avenue (SR 20 Spur)
13th St to 11th St
UAP 2021 Construction 687,769 2,941,364
ARLINGTON
Island Crossing (SR 530) Roundabout
Smokey Point Blvd
UAP 2027 Design 4,461,608 5,577,011
AUBURN
Auburn Way S Widening
Hemlock St to Poplar St
UAP 2025 Construction 3,187,534 7,700,517
AUBURN
49th Street NE
Auburn Wy N to D St NE
CSP 2026 Construction 504,000 807,829
BAINBRIDGE ISLAND
NE Wyatt Way
Eagle Harbor Dr NE
ATP 2025 Construction 350,928 3,896,124
BATTLE GROUND
SE Grace Avenue - Phase II
NE 1st St to SE Rasmussen Blvd
UAP 2023 Design 3,000,000 6,310,056
BELLEVUE
150th Avenue
SE 28th St to SE 38th St
UAP 2024 Construction 3,990,000 13,381,395
BELLEVUE
NE 2nd Street Bike Connection
Bellevue Way NE to 108th Ave NE
CSP 2027 Design 1,628,418 2,049,823
BELLEVUE
Lakemont Boulevard RRFB
SE 58th St
ATP 2027 Construction 161,722 236,275
BELLINGHAM
James Street Multimodal Safety Improvements
Telegraph Rd to Gooding Ave
CSP 2026 Construction 950,000 3,966,235
BENTON CITY
SR 225 Sidewalks
Dale Ave to Babs Ave
ATP 2027 Design 707,258 744,481
BINGEN
Alder and Cedar Sidewalks
Multiple Locations
CSP 2027 Design 319,100 835,400
BLACK DIAMOND
Roberts Drive Reconstruction
Morgan St to Ginder Creek Crossing
UAP 2026 Design 3,565,750 4,195,430
BLACK DIAMOND
SR 169 Pedestrian Crossing
Park Street
ATP 2027 Design 273,491 324,754
BLAINE
Blaine Multimodal Improvements
Multiple Locations
CSP 2027 Design 475,000 630,000
BLAINE
Peace Portal Community Trail
Hughes Avenue to Bell Road
ATP 2027 Design 560,000 745,000
BOTHELL
Bothell Way NE Multimodal Improvements Phase 1 Project
Reder Way to NE 192nd St
UAP 2027 Design 3,000,000 36,136,000
BOTHELL
Bothell Way NE Multimodal Improvements Phase 2 Project
County Line to 240th St SE
UAP 2027 Design 3,000,000 22,403,000
BREMERTON
Rocky Point Sidewalk
Marine Drive to Crownhill Elementary
ATP 2027 Construction 64,722 80,903
BREWSTER
2026 Street Maintenance
Multiple Locations
SCPP 2027 Construction 15,152 15,950
BREWSTER
7th Street Multimodal Improvements
Main Ave to Bruce Ave
CSP 2027 Construction 1,305,280 1,399,324
BRIER
Vine Road Overlay
Poplar Way to S C/L
APP 2027 Construction 697,450 845,329
BUCODA
Main Street Improvements
7th St to 5th St
CSP 2027 Design 880,627 1,201,460
BURIEN
SW 148th Street
4th Ave SW to 6th Ave SW
UAP 2024 Construction 3,888,535 5,786,010
BURIEN
S 128th Street
Occidental Ave S to SR 509 Off Ramp
UAP 2027 Design 1,500,000 3,570,000
BURIEN
S 152nd Street Project
4th Ave SW to Des Moines Memorial Drive S
CSP 2027 Design 800,000 4,410,000
BURIEN
RRFB Pedestrian Improvements
Various Locations
ATP 2027 Construction 141,122 190,160
BURLINGTON
2026 Overlay
Multiple Locations
APP 2027 Construction 675,712 750,795
CAMAS
NE Third Ave Pedestrian and Bicycle Improvements
NE Adams Street to NE Cedar Street
CSP 2026 Construction 264,161 335,202
CAMAS
Camas Pedestrian Crossing Improvements
Multiple Locations
CSP 2027 Construction 323,130 403,913
CARNATION
Royal Glen Scrub Seal
Multiple Locations
SCPP 2027 Construction 154,208 171,342
CASHMERE
Sidewalk Improvements
City of Cashmere
ATP 2026 Construction 526,722 566,944
CATHLAMET
Butler Street Reconstruction
Main St(SR 409) to Una Ave
SCAP 2026 Construction 255,566 256,566
CATHLAMET
S 3rd Street Sidewalk
Maple St to Alder St
ATP 2026 Construction 249,564 250,564
CHEHALIS
Chehalis Downtown Rejuvenation
N Market Blvd and N National Avenue
UAP 2027 Design 4,000,000 8,109,650
CHEHALIS
Interstate Avenue Sidewalk
Parkland Avenue to south of Best Western
ATP 2027 Construction 242,987 304,598
CHELAN
Sanders Street Pedestrian Improvements
E Okanogan Ave and E Wapato Ave
SCAP 2025 Construction 87,616 834,103
CHELAN
Farnham St. and Webster Ave. Pedestrian Improvements
US 97A SRMP 233.90 to 234.00
CSP 2027 Design 317,260 352,514
CHELAN
Lakeside Trail
W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave.
ATP 2025 Construction 500,000 4,159,180
CHELAN COUNTY
Easy St and School St Intersection
School Street Roundabout
UAP 2025 Design 800,000 2,431,217
CHENEY
N 6th Street Roundabout
Betz Road
UAP 2024 Construction 777,157 863,509
CHENEY
Elm Street Overlay Phase 2
N 6th St to 2nd St
UAP 2026 Construction 649,688 724,644
CLARK COUNTY
NE 152nd Avenue
Padden Pkwy to NE 99th St
UAP 2025 Construction 3,500,000 10,439,417
CLARK COUNTY
NE 179th St and NE 29th Ave Intersection Improvement
NE 29th Ave Intersection
UAP 2026 Construction 3,000,000 20,795,738
CLARK COUNTY
Truman School Sidewalk
NE 40th Ave and NE 44th St
ATP 2024 Design 200,000 430,000
CLARK COUNTY
Highway 99 Sidewalk
NE 102nd St NE 104th St
ATP 2026 Construction 500,001 1,152,241
CLE ELUM
2026 Seal Coat
Multiple Locations
SCPP 2027 Construction 210,213 233,570
CLE ELUM
First Street - Phase 3
Oakes Ave to Peoh Ave
SCAP 2025 Construction 677,032 5,499,790
CLE ELUM
Second Street Pathway - Phase 1
N Stafford Ave to N Pennsylvania Ave
ATP 2025 Construction 548,798 590,182
COLLEGE PLACE
SW Mojonnier Road Improvements
College Ave to Bluvue Ln
UAP 2025 Bid Auth 1,922,008 6,772,008
COLLEGE PLACE
Rose Street Multiuse Path Illumination
NE Ash Ave to NE Carey Ct
CSP 2026 Construction 652,712 969,937
COLVILLE
2025 Pavement Preservation - Red Town
Multiple Locations
SCPP 2026 Construction 2,000,000 2,105,263
CONNELL
W Fir Street Sidewalk Improvements
SR 260 to Columbia Ave
CSP 2026 Construction 421,044 469,867
COULEE CITY
2nd Street Reconstruction
Washington St to US 2
SCAP 2027 Design 1,280,300 1,280,300
COULEE CITY
McEntee Street Improvements
Walnut St to Chelan St
SCAP 2025 Construction 113,443 905,596
COULEE DAM
Sidewalk and ADA Ramp Replacement
Town Limits
CSP 2026 Design 970,730 970,730
COULEE DAM
ADA Ramp Upgrades
Multiple Locations
ATP 2025 Construction 440,710 445,710
COULEE DAM
ADA Ramp Upgrades
Multiple Locations
ATP 2025 Design 108,985 108,985
COVINGTON
SE 256th Street
168th Ave SE to 173rd Ave SE
UAP 2026 Design 4,995,482 11,150,627
DAVENPORT
2026 Scrub Seal
Multiple Locations
SCPP 2027 Construction 849,328 894,200
DAYTON
Main Street Multimodal Improvements
Cottonwood St to Patit Rd
CSP 2027 Design 2,612,500 2,750,000
DES MOINES
24th Avenue South
S 223rd St to S 216th St
UAP 2027 Application 5,000,000 9,112,748
DOUGLAS COUNTY
21st St NE
N Baker Ave to N Devon Ave
UAP 2025 Construction 1,291,241 1,734,641
DOUGLAS COUNTY
5th St NE
N Kentucky Ave to N Lyle Ave
UAP 2027 Design 1,985,665 2,336,077
DUPONT
2025 Center Drive Overlay Phase 4A
Powerline Rd to Palisade Blvd
APP 2027 Construction 578,499 755,317
DUPONT
2025 Center Drive Overlay Phase 4B
Palisade Blvd to Kincaid St
APP 2027 Construction 543,437 734,820
DUVALL
NE 150th Sidewalk Extension
275th Place NE to 278th Ave NE
ATP 2027 Design 672,000 840,000
EAST WENATCHEE
5th Street NE Safety and Multimodal Improvements
N Baker Ave to N Kentucky Ave
UAP 2025 Construction 1,469,280 5,050,436
EAST WENATCHEE
N Kentucky Avenue Multimodal Improvements
Grant Rd to 9th St NE
CSP 2027 Design 4,500,000 8,617,735
EAST WENATCHEE
East Wenatchee Pedestrian Safety Improvements
Various
CSP 2027 Construction 575,473 677,027
EATONVILLE
Eatonville Hwy W Overlay
Emerald Ridge Dr to Center St W
SCPP 2026 Construction 377,292 418,500
EATONVILLE
2025 Chip Seal
Multiple Locations
SCPP 2026 Construction 301,085 316,952
EATONVILLE
2027 Overlay
Multiple Locations
SCPP 2027 Design 676,116 711,702
EDMONDS
7th Avenue N Pedestrian Improvements
Bell St to Caspers St(SR 524)
CSP 2026 Construction 273,718 454,135
EDMONDS
Citywide Pedestrian Enhancements
96th Ave W to Five Corners 3rd Ave. S Giltner 76th Ave. W 236th St. SW
CSP 2027 Design 679,639 883,499
ELLENSBURG
2026 Overlay
Umptanum Rd to Mountain View Ave
APP 2027 Construction 452,773 612,458
ELLENSBURG
Umptanum Road - Anderson Road Roundabout
Umptanum Rd Intersection
UAP 2027 Design 1,087,450 1,672,960
ELMA
2026 Maintenance
Multiple Locations
SCPP 2027 Design 144,875 152,500
ELMA
F Street Improvements
Young St to Oakhurst St
SCAP 2026 Construction 584,340 615,095
ELMA
W Main Street ADA
12th St to 14th St
ATP 2027 Construction 332,240 349,726
ELMER CITY
Speed Feedback Signs and Striping
Multiple Locations
ATP 2027 Design 134,800 134,800
ENDICOTT
2025 Scrub Seal
Multiple Locations
SCPP 2026 Construction 179,950 179,950
EPHRATA
2026 Chip Seal
Multiple Locations
APP 2027 Construction 595,684 661,871
EVERETT
RRFB Crossing Improvements
Multiple Locations
CSP 2027 Design 874,358 1,092,947
EVERSON
S Harkness Street
W Main St to Lincoln St
SCAP 2025 Construction 474,397 659,127
EVERSON
SR 544 Sidewalk
Portions of Meade Ave and Nolte Rd
CSP 2026 Construction 564,867 3,744,684
FEDERAL WAY
S 288th Street
16th Ave S to 34th Ave S
UAP 2022 Construction 2,081,535 3,178,973
FEDERAL WAY
Pacific Highway S (SR 99)
S C/L to Weigh Station
UAP 2023 Bid Auth 2,500,000 3,770,000
FEDERAL WAY
City Center Greenway
100 feet e/o Pacific Hwy S to S 312th St
CSP 2027 Construction 422,928 791,271
FEDERAL WAY
Citywide Pedestrian Crossings
RRFB Crossings
ATP 2024 Construction 350,001 563,637
FERNDALE
Ferndale Terrace
Hendrickson Ave to Vista Dr
UAP 2025 Construction 2,855,316 5,501,743
FERNDALE
Main Street Reconstruction
Barrett Rd to Old Settler Dr
UAP 2027 Design 3,000,000 10,288,544
FERNDALE
Main Street Complete Streets
Barrett Rd to Old Settler Dr
CSP 2027 Design 1,000,000 1,250,000
FIFE
20th Street E Multimodal Improvements
5410 20th St E to 6400 block
UAP 2025 Design 8,683,852 11,028,083
FIFE
Port of Tacoma Road Interchange Phase 2A
12th Street E to 20th St E
UAP 2026 Construction 5,000,000 65,158,598
FIRCREST
2025 Regents West Overlay
Alameda Ave and 67th Ave
APP 2027 Construction 698,607 1,194,548
FORKS
West E Street
5th Ave to S Forks Ave (SR 101)
SCAP 2025 Construction 551,447 580,471
GEORGE
W Montmorency Multiuse Path
Washington Way S to Windsor Ave
ATP 2026 Construction 195,385 202,175
GIG HARBOR
56th Street Roundabout
38th Ave
UAP 2026 Construction 1,491,747 2,606,244
GIG HARBOR
38th Avenue Improvements Phase 2
56th St to Hunt St
CSP 2026 Construction 528,663 3,360,979
GOLDENDALE
Darland Drive Reconstruction
Railroad Ave to Mill St
SCAP 2026 Construction 916,989 1,018,876
GRAND COULEE
Spokane Way Improvements
Alcan Rd to E Grand Coulee Ave (SR 174)
SCAP 2025 Design 126,876 1,015,000
GRANDVIEW
2026 Overlay
Multiple Locations
APP 2027 Design 580,388 644,875
GRANGER
2025 Overlay Yakima Valley Hwy
East City Limits to West City Limits
SCPP 2027 Construction 176,961 191,275
GRANITE FALLS
2026 Overlay
Multiple Locations
SCPP 2027 Construction 446,305 499,670
GRANITE FALLS
2026 Pedestrian Improvement Program
Multiple Locations
CSP 2027 Construction 33,151 61,201
HUNTS POINT
Hunts Point Lane Overlay
Hunts Point Lane
SCPP 2026 Construction 255,212 289,569
ILWACO
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Construction 1,261,361 1,332,748
INDEX
2025 Chip Seal
Multiple Locations
SCPP 2026 Construction 204,634 204,634
IONE
First and Blackwell Sidewalk Improvements
First Ave and Blackwell St R/W
ATP 2027 Construction 680,881 680,881
KAHLOTUS
2025 Chip Seal Project
Multiple Locations
SCPP 2027 Design 303,500 303,500
KALAMA
Taylor Road
Geranium St to end of road
SCPP 2027 Construction 100,151 108,815
KELSO
Kelso Drive Overlay
Haussler Rd to Coweeman River Bridge
APP 2027 Construction 276,663 344,286
KENMORE
61st Avenue NE Pedestrian and Bicycle Improvements
NE 190th St to 62nd Ave NE
UAP 2026 Construction 2,213,330 3,768,303
KENMORE
80th Avenue NE
NE Bothell Way(SR 522) to NE 185th St
UAP 2027 Construction 2,112,612 3,755,144
KENMORE
Arrowhead Drive Sidewalk
NE 151st St to 64th Ave NE
ATP 2027 Construction 735,043 2,363,716
KENT
SE 248th Street Roundabout
116th Ave SE
UAP 2027 Design 3,500,000 7,875,000
KENT
132nd Avenue SE Pedestrian Improvement Phase 3
SE 276th St to SE 278th Pl
CSP 2026 Construction 374,609 806,944
KENT
S Reith Road Sidewalk
250 ft e/o Military Rd S to 42nd Ave S
CSP 2027 Design 1,399,999 1,954,000
KENT
83rd Avenue S Sidewalk
S 224th St to 700ft s/o S 224th St
ATP 2026 Construction 656,980 1,048,698
KING COUNTY
68th Avenue S / S 124th Street
Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St
UAP 2023 Construction 1,229,199 1,596,499
KING COUNTY
16th Avenue SW Overlay
SW 100th St to SW 107th St
UAP 2026 Construction 949,964 1,234,086
KING COUNTY
Renton Avenue S
76th Ave S to S 130th St
ATP 2026 Construction 160,000 302,244
KIRKLAND
Central Way Bike and Pedestrian Improvements
3rd St to Peter Kirk Lane
CSP 2027 Design 1,500,001 2,627,841
KIRKLAND
Pedestrian Crossing at Lake Washington Institute of Technology
132nd Ave NE
ATP 2025 Construction 131,355 174,330
KITSAP COUNTY
SE Lund Avenue
Harris Rd SE Intersection
UAP 2023 Construction 2,984,738 3,777,581
KITSAP COUNTY
Lund Avenue Roundabout
Chase Rd Roundabout
UAP 2025 Construction 2,135,843 2,694,805
LA CENTER
4th Street
Cedar Ave to Highland Rd
SCAP 2026 Construction 500,000 17,972,535
LA CENTER
Pacific Highway Shared Use Path
Larsen Dr to existing sidewalk
ATP 2026 Bid Auth 500,000 3,480,000
LACEY
College Street NE
Martin Way to 15th Ave NE
UAP 2022 Construction 3,080,000 5,819,212
LACEY
Rainier Road Improvements
66th Ave SE to Yelm Hwy
UAP 2026 Design 3,030,000 5,050,000
LAKE FOREST PARK
SR 104
40th Pl NE Roundabout
UAP 2021 Construction 2,945,378 7,874,557
LAKE STEVENS
91st Avenue SE MultiUse Path Phase II
12th Place SE to 20th Street SE
CSP 2027 Construction 577,604 2,554,724
LAKEWOOD
Custer Road W
Bridgeport Way SW to 75th ST W
UAP 2025 Construction 2,044,110 2,580,137
LAKEWOOD
Nyanza Road SW
Gravelly Lake Dr S to Gravelly Lake Dr N
UAP 2026 Construction 1,382,790 4,449,925
LONG BEACH
Ocean Beach Blvd
Pioneer Rd W to 26th St NW
SCAP 2026 Construction 625,000 1,258,339
LONG BEACH
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 75,000 75,000
LONGVIEW
Columbia Heights Road Improvements
Fishers Lane to Cascada Drive
UAP 2027 Bid Auth 3,000,000 15,000,000
LYNNWOOD
Poplar Way Bridge
196th St SW to Alderwood Mall Blvd
UAP 2024 Construction 5,000,000 58,215,995
LYNNWOOD
44th Avenue W Underpass Pedestrian and Bicycle Improvement
s/o 200th St SW to 204th St SW
CSP 2026 Construction 1,000,000 9,144,940
LYNNWOOD
2025 Curb Ramps Project
66th Ave W from Meadowdale Rd to 168th St SW and east along that through Olympic View Dr
CSP 2027 Construction 480,367 627,664
MALDEN
Roadway Restoration
Multiple Locations
SCAP 2026 Construction 57,260 1,155,208
MANSFIELD
Walnut Street Overlay
Cemetery Rd to 2nd Ave
SCPP 2027 Construction 239,382 244,140
MAPLE VALLEY
Maple Valley Highway (SR 169)
SE 253rd Pl to SE 260th St
UAP 2024 Construction 2,261,668 15,295,345
MAPLE VALLEY
SE Kent Kangley Road (SR 516) Sidewalk
800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE
ATP 2025 Construction 853,740 1,333,281
MARYSVILLE
156th Street NE
Smokey Pt Blvd to Hayho Creek
UAP 2025 Construction 1,482,398 1,953,397
MARYSVILLE
88th Corridor Improvements Phase 1
State Avenue to 55th Avenue
UAP 2027 Construction 3,947,343 17,048,700
MARYSVILLE
Ebey Waterfront Trail
NE 61st St from 53rd Ave NE to 47th Ave from NE 61st St NE to 1st St
CSP 2027 Design 490,543 1,504,980
MCCLEARY
6th Street Sidewalk
W Simpson Ave to W Pine St
CSP 2027 Design 423,172 445,444
MEDICAL LAKE
2025 Street Maintenance
Multiple Locations
SCPP 2026 Construction 160,337 168,776
MEDICAL LAKE
2025 Scrub Seal
Multiple Locations
SCPP 2026 Construction 844,703 889,254
MEDICAL LAKE
2026 Lefevre Street Restriping
Brooks Rd to Idaho St
CSP 2027 Design 767,700 853,000
MEDICAL LAKE
Lefevre Street Restriping and Sidewalk
Idaho St to n/o James St
ATP 2024 Construction 639,400 695,000
MERCER ISLAND
Island Crest Way Shared Use Path Phase 1
Island Park Elementary to SE 60th St
ATP 2026 Design 850,000 1,620,270
MILLWOOD
Argonne Road Reconstruction - Phase 2
E Trent Ave to 150 ft s/o S Frederick Ave
SCAP 2025 Construction 1,573,000 1,688,000
MILLWOOD
Argonne Road Reconstruction - Phase 1
150 ft s/o Frederick to N of Riverway
SCAP 2025 Construction 801,070 2,900,277
MILTON
Porter Way Sidewalk Improvements
7th Ave to Juniper St
ATP 2026 Design 360,866 424,550
MONROE
Freylands Blvd and Main Street Sidewalk
Fryelands Bvld to Main St Roundabout
ATP 2026 Construction 228,270 297,247
MONROE
179th Ave Sidewalk
154th St to 15000 block
ATP 2027 Design 684,200 855,250
MONTESANO
2026 Maintenance
Multiple Locations
SCPP 2027 Construction 114,610 127,510
MONTESANO
2026 Chip Seal
Multiple Locations
SCPP 2027 Construction 288,468 321,040
MONTESANO
Spruce Avenue and Main Street Improvements
Main Street and Spruce Avenue
SCAP 2027 Construction 520,215 1,387,240
MOSES LAKE
SR17 Yonezawa Roundabout
Yonezawa Blvd Intersection
UAP 2026 Design 2,500,000 6,552,970
MOSSYROCK
City Wide ADA Retrofit
City Wide
CSP 2026 Design 491,620 491,620
MOUNT VERNON
Laventure Road
Hoag Rd to Sigmar Ln
UAP 2025 Construction 853,184 1,208,709
MOUNTLAKE TERRACE
Main Street Revitalization Phase II
232nd St SW and 236th St SW
UAP 2027 Bid Auth 5,000,000 11,886,000
MOXEE
2026 Overlay
N Rivard Rd to East City Limits
SCPP 2027 Construction 151,146 180,005
MUKILTEO
Harbour Pointe Boulevard Paving
W/O SR 525 to Harbour Reach Drive
UAP 2027 Construction 1,270,555 1,936,255
NEWPORT
2026 Fog Seal
Multiple Locations
SCPP 2027 Construction 50,216 52,859
NEWPORT
2026 Chip Seal
Multiple Locations
SCPP 2027 Construction 250,000 263,158
NEWPORT
2027 Chip Seal
Citywide
SCPP 2028 Design 266,000 280,000
NORMANDY PARK
SW 192nd Street and Normandy Park Drive SW
1st Ave S to Marine View Drive SW
APP 2027 Construction 686,313 823,181
NORMANDY PARK
4th Avenue SW Intersection
SW Normandy Rd
UAP 2027 Construction 737,923 983,915
NORTH BEND
2025 Overlay
Multiple Locations
APP 2027 Construction 678,690 873,362
NORTH BEND
South Fork Road Extension
SR 202 to North Bend Wy
UAP 2026 Design 1,951,028 3,251,713
NORTH BEND
North Bend Way Roundabout
NW 8th Street
UAP 2026 Construction 2,101,117 3,665,617
NORTH BEND
North Bend Way
Tollgate Park Entrance to Ribary Creek Bridge
CSP 2026 Design 1,002,518 1,222,585
NORTH BEND
2026 Sidewalk Gap Projects
Various locations
ATP 2027 Construction 780,384 1,028,160
NORTH BONNEVILLE
CityWide Pedestrian Improvements
Multiple Locations
CSP 2027 Design 371,854 391,425
OAK HARBOR
SE Barrington Drive Overlay
Hwy 20 Dr to SE 8th Ave
APP 2027 Construction 512,568 766,415
OAK HARBOR
LED Streetlight Conversion
PSE Owned
LED 2019 Construction 220,000 220,000
OAKVILLE
City Wide ADA Retrofit
Multiple Locations
CSP 2026 Construction 421,033 421,033
OLYMPIA
Fones Road SE
Pacific Ave SE to 18th Ave SE
UAP 2023 Construction 2,000,000 17,979,962
OMAK
Central Ave Reconstruction Phase II
Cedar St to Fir St
SCAP 2025 Closeout 932,374 981,446
OROVILLE
2025 Chip Seal
Multiple Locations
SCPP 2026 Construction 109,927 115,712
OROVILLE
2026 Scrub Seal
Multiple Locations
SCPP 2027 Construction 340,404 358,320
ORTING
Kansas Street Reconstruction
SR 162 to Coe Ln
UAP 2025 Construction 4,347,007 6,128,819
PACIFIC
Ellingson Overlay
West Valley Hwy to UPRR Crossing
APP 2025 Construction 1,982,415 2,264,243
PALOUSE
2026 Scrub and Chip Seal
Multiple Locations
SCPP 2027 Design 1,283,999 1,283,999
PASCO
Road 44 Sidewalk Infill
Road 44 Canal
CSP 2027 Design 1,309,760 1,637,200
PE ELL
2025 Otta Seal
Multiple Locations
SCPP 2026 Construction 149,569 150,569
PIERCE COUNTY
122nd Avenue E
146th St Ct E to 136th St E
UAP 2025 Construction 4,493,015 16,675,862
PIERCE COUNTY
122nd Avenue E
153rd St Ct E to 146th St Ct E
UAP 2026 Design 4,999,999 13,151,000
PIERCE COUNTY
159th Street E
SR 7 to 3rd Ave Ct E
UAP 2027 Design 1,500,000 4,287,000
PIERCE COUNTY
104th Street E
e/o 16th Ave E to Portland Ave E
CSP 2027 Design 750,000 970,480
POMEROY
Main Street Sidewalk
S 17th St to 25th St
CSP 2026 Design 999,700 999,700
PORT ANGELES
N Street Reconstruction
6th St to 15th St
UAP 2027 Design 2,188,652 2,735,816
PORT ANGELES
Peabody St ADA Improvements
Lauridsen St to First St
CSP 2026 Construction 652,419 843,595
PORT ORCHARD
Bethel Avenue
Bethel Rd, Lincoln Ave SE, Mitchell Rd SE
UAP 2023 Construction 985,493 1,241,866
PORT ORCHARD
LED Streetlight Conversion
PSE Owned
LED 2021 Construction 200,000 200,000
PORT TOWNSEND
2026 Chip Seal
Multiple Locations
APP 2027 Construction 195,994 306,491
PORT TOWNSEND
Lawrence Street Multimodal Improvements
Harrison St to Walker St
UAP 2026 Construction 2,318,184 2,997,078
POULSBO
Noll Road - Segment 3A
Mesford Rd to NE Kevos Pond Dr
UAP 2022 Construction 1,510,402 7,686,518
POULSBO
Noll Road Phase 3B
Lincoln Rd NE to Kevos Pond Dr
UAP 2024 Construction 1,049,598 4,138,894
POULSBO
3rd Avenue Improvements
Front St to Moe St
UAP 2027 Design 1,750,000 5,307,000
PRESCOTT
2026 Sidewalk Improvements
Multiple Locations
CSP 2027 Construction 291,070 291,070
PROSSER
Alexander Court Improvements
Highland Dr to Paterson Ave
UAP 2026 Construction 881,008 1,101,940
PULLMAN
Lybecker Sidewalk Infill
Stadium Way to Upper Drive
CSP 2027 Construction 197,860 234,777
PUYALLUP
7th Street Sidewalk
9th St to 11th St
ATP 2024 Construction 185,742 451,581
QUINCY
13th Ave SW and Road 9 NW Reconstruction Phase 1
Rd 9 NW to 700ft n/o SR 28
UAP 2027 Design 2,391,428 3,241,719
RAINIER
2026 Seal Coat
Multiple locations
SCPP 2027 Construction 432,407 460,164
RAYMOND
2026 Maintenance
Multiple Locations
SCPP 2027 Design 71,193 74,940
RAYMOND
Duryea Street Reconstruction Phase II
60ft e/o US 101 to 11th St
SCAP 2027 Construction 1,783,974 1,877,868
REARDAN
2026 Street Maintenance
Multiple Locations
SCPP 2027 Construction 18,143 18,143
REDMOND
Bel Red Road Buffered Bike Lanes
NE 30th St to W Lake Sammamish Pkwy
ATP 2024 Construction 650,000 4,041,841
RENTON
SW 43rd Street
W C/L to SR 167 Ramps
UAP 2025 Construction 2,918,017 5,913,000
RENTON
116th Avenue SE Sidewalk
SE 162nd St to SE 160th St
CSP 2026 Construction 213,434 1,109,059
RICHLAND
Downtown Connectivity Improvements
George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St
UAP 2024 Design 3,500,000 16,781,600
RICHLAND
Duportail Street Roundabouts
Keene Rd to Queensgate Dr
UAP 2026 Design 1,572,686 3,773,521
RICHLAND
George Washington Way Sidewalk
Comstock St to Bradley Blvd
ATP 2026 Bid Auth 850,000 1,062,500
RIDGEFIELD
S. Royle Road
Hillhurst Rd to Royle Ct
UAP 2027 Design 3,500,000 5,500,000
RIVERSIDE
2026 Scrub Seal
Multiple Locations
SCPP 2027 Design 1,047,250 1,047,250
ROCK ISLAND
Saunders Road Shared Use Path
City of Rock Island Saunders Road
CSP 2026 Design 385,000 385,000
ROCKFORD
2026 Scrub Seal
Multiple Locations
SCPP 2027 Construction 120,916 120,916
ROSALIA
2026 Scrub Seal
Multiple Locations
SCPP 2027 Construction 119,684 119,684
ROSLYN
2025 RRFB
Intersection of 1st St and Pennsylvania Ave
CSP 2026 Construction 131,897 138,839
ROY
SR 507 Crossing Project
W Huggins Greig Rd
ATP 2027 Construction 103,368 108,808
ROYAL CITY
2026 Crack Seal
Multiple Locations
SCPP 2027 Bid Auth 98,000 98,000
ROYAL CITY
Apple Avenue Reconstruction
Road 13 SW to Poplar St
SCAP 2026 Construction 1,006,353 1,059,319
SEATAC
Airport Station Pedestrian Improvements
S 176th St/32nd Ave S and S 180th St
UAP 2025 Bid Auth 4,000,000 27,417,979
SEATTLE
East Marginal Way S
S Atlantic to S Spokane St.
UAP 2020 Construction 3,000,000 19,393,875
SEATTLE
4th Avenue S and S Forest Street Signal
Intersection
UAP 2027 Bid Auth 1,318,675 2,221,409
SEATTLE
4th Avenue S and Walker Street Signal
Intersection
UAP 2027 Bid Auth 1,472,174 2,505,032
SEDRO WOOLLEY
JonesJohn Liner RR Undercrossing
Reed St to 100ft w/o Sapp Rd
UAP 2026 Design 2,149,055 2,543,300
SEDRO WOOLLEY
Cascade Trail West Extension Phase 2A
Hodgin Rd to Holtcamp Rd
ATP 2027 Design 915,450 1,077,000
SHELTON
Olympic Highway North
C S to Wallace Kneeland Blvd
UAP 2025 Design 3,688,752 4,098,614
SHORELINE
145th Street (SR 523)
3rd Ave NE to 5th Ave NE (I-5 Interchange)
UAP 2023 Construction 5,000,000 40,621,677
SHORELINE
N 145th Street (SR 523) Phase 1
Corliss Ave N to 3rd Ave NE
UAP 2024 Construction 5,000,000 11,845,978
SHORELINE
145th Street Corridor Phases 2 and 3
Corliss Ave N to Interurban Trail
UAP 2026 Design 6,500,000 27,680,040
SHORELINE
8th Avenue NW Sidewalk
Sunset School Park to Richmond Beach Rd NW
ATP 2025 Construction 330,000 2,483,693
SNOHOMISH
2022 Overlay Award
Multiple Locations
APP 2024 Design 424,999 500,000
SNOHOMISH
Avenue D Overlay
Multiple Locations
APP 2025 Design 455,353 535,710
SNOHOMISH
N Bickford Avenue Overlay
3000 Blk to N C/L
APP 2026 Construction 450,928 699,114
SNOHOMISH
13th Street Intersection Improvements
Park Ave
ATP 2025 Construction 172,891 223,402
SNOHOMISH
2025 Bickford Sidewalk Gaps
Multiple Locations
ATP 2027 Design 644,012 805,016
SNOHOMISH COUNTY
Alderwood Mall Parkway
SR 525 to 168th St SW
UAP 2025 Design 4,500,000 16,155,483
SNOHOMISH COUNTY
2025 Crossing Improvements
Various Locations
CSP 2027 Construction 174,882 218,602
SNOHOMISH COUNTY
18th Avenue W
151st St SW to Jefferson Way
ATP 2027 Construction 189,814 239,767
SOAP LAKE
Daisy Street SR 17 Sidewalk Improvements Phase II
Main Ave E to 3rd Ave SE
SCAP 2026 Design 76,425 566,100
SOUTH BEND
2025 RRFBs
Central Ave to Reid St
CSP 2026 Design 507,080 533,767
SOUTH CLE ELUM
2026 Seal Coat
Main Street to South Cle Elum Way
SCPP 2027 Construction 22,510 22,510
SOUTH PRAIRIE
Pioneer Way E (SR 162)
Emery St
SCAP 2025 Design 785,622 785,622
SPOKANE
Maple Street and Walnut Street
5th Ave to 1st Ave
UAP 2024 Construction 920,400 2,681,883
SPOKANE
Riverside Ave.
Monroe St to Wall St
UAP 2025 Design 887,000 1,774,000
SPOKANE
PalouseFreya Roundabout
150 feet south west and east of intersection and 250 ft north of the intersection
UAP 2026 Design 1,563,600 5,716,800
SPOKANE
Spokane School Walk Routes
Various
CSP 2026 Construction 1,270,421 1,588,026
SPOKANE
Driscoll Blvd Sidewalks
Garland Ave to Wellesley Ave
ATP 2026 Design 831,500 1,663,000
SPOKANE
Alberta Street
Gordon Ave to Longfellow Ave
ATP 2027 Design 652,800 816,000
SPOKANE COUNTY
Hatch Road Reconstruction Phase 2
MP 1.10 to MP 1.63
UAP 2025 Construction 1,707,846 2,134,808
SPOKANE COUNTY
Crestline Street Sidewalks
57th Ave to 63rd Ave
CSP 2026 Construction 706,648 910,587
SPOKANE COUNTY
Centennial Trail Infill
Boulder Beach to MP 0.54
CSP 2027 Design 950,000 1,305,000
SPOKANE COUNTY
Aero Road Sidewalk Infill
Dior Vicinity to Noah Vicinity
ATP 2027 Design 368,000 798,000
SPOKANE VALLEY
Barker Road - 4th Avenue Roundabout
4th Avenue Vicinity
UAP 2027 Design 2,373,975 2,967,469
SPOKANE VALLEY
Barker Road Corridor
Sprague Ave to 4th Ave
UAP 2027 Design 1,462,558 1,828,198
SPRAGUE
4th Street Sidewalk
SR 23 to E St
ATP 2024 Construction 303,487 303,487
SPRINGDALE
Townwide Preservation Project
Multiple Locations
SCPP 2027 Construction 156,134 171,135
STANWOOD
272nd Street NW and 72nd Avenue Sidewalk
276th St NW to 272nd St NW and 72nd Ave NW and 78th Ave NW
CSP 2027 Closeout 404,445 484,064
STEVENSON
Lasher Street Improvements
Multiple Locations
CSP 2027 Design 950,000 2,386,512
SUMNER
Stewart Road White River Bridge
Butte Ave E to 140th Ave Ct E
UAP 2024 Construction 6,375,000 34,821,560
SUMNER
Main St Crossings
Alder Ave to 162nd Ave E
CSP 2026 Design 747,214 979,740
TACOMA
Sheridan Avenue Phase 1
S 72nd St to S 64th St
UAP 2024 Construction 3,560,000 6,148,185
TACOMA
E Roosevelt Avenue Improvements
E 38th St to E Sherman St
UAP 2026 Closeout 1,961,650 2,452,064
TACOMA
S 12th Street Improvements
S Grant St to S Cedar St
UAP 2027 Design 3,720,999 6,207,060
TACOMA
S 56th Street Crossing Improvements
A St
CSP 2026 Bid Auth 673,421 841,777
TACOMA
S Park Avenue Greenway
S 86th St to S 76th St
CSP 2027 Design 478,746 598,432
TEKOA
2026 Seal Coat
Multiple Locations
SCPP 2027 Construction 674,246 674,246
THURSTON COUNTY
Yelm Hwy and Spurgeon Crk Rd SE Intersection Improvements
Spurgeon Crk Rd SE Intersection
UAP 2026 Design 3,470,000 4,450,000
TIETON
2025 Seal Coat
Multiple Locations
SCPP 2026 Construction 292,028 313,898
TIETON
North Tieton Road Multimodal Improvements
Wisconsin Ave to Pear Drive
CSP 2027 Design 796,014 837,910
TOLEDO
Augustus Street and 4th Street Sidewalks
S 5th S to S 3rd St and Cowlitz St
ATP 2027 Design 425,667 452,837
TONASKET
2026 Chip Seal
Multiple Locations
SCPP 2027 Construction 1,018,862 1,018,862
TOPPENISH
Jackson Street and Juniper Street
Monroe Ave to Magnolia St
UAP 2023 Construction 1,152,412 1,400,786
TOPPENISH
Downtown Intersection Improvements
Intersection Improvements
CSP 2026 Construction 1,133,776 1,373,690
TUKWILA
Southcenter Boulevard Signal
65th Avenue S
UAP 2025 Construction 848,903 1,328,075
TUKWILA
S 124th St and 50th Pl S
Vicinity of S 124th St and 50th Pl S intersection
UAP 2026 Design 900,404 1,151,487
TUMWATER
Tumwater Boulevard
NB I-5 On/Off Ramp Intersection
UAP 2024 Design 2,250,000 6,250,000
TWISP
Glover Street Revitalization
5th Ave to Twisp Ave
CSP 2026 Construction 2,757,993 3,054,748
VADER
2025 Seal Coat
Multiple Locations
SCPP 2026 Construction 246,100 246,100
VANCOUVER
SE 1st Street
SE 177th Ave to SE 192nd Ave
UAP 2021 Construction 1,892,899 11,369,281
VANCOUVER
NE 137th Avenue
NE 49th St to NE Fourth Plain Blvd
UAP 2024 Construction 3,250,000 28,658,398
VANCOUVER
Main Street Pedestrian and Bicycle Improvements
W 39th St to NE Hazel Dell Ave
CSP 2026 Bid Auth 500,000 2,480,675
VANCOUVER
Hazel Dell Avenue Multiuse Path
Discovery Trail to Burnt Bridge Creek Greenway
ATP 2024 Design 500,000 683,000
VANCOUVER
SE McGillivray Blvd
Chkalov Dr to 164th Ave
ATP 2026 Construction 700,000 7,111,023
WAITSBURG
Main Street Overlay
Preston Ave 3rd St to 1st St
SCAP 2027 Design 100,000 744,400
WALLA WALLA
Myra Road South Extension
SR 125 to Taumarson Rd
UAP 2026 Construction 1,981,760 9,548,331
WALLA WALLA
Poplar Street Reconstruction
5th Ave to 14th Ave
UAP 2027 Design 3,000,000 11,125,000
WAPATO
N Ahtanum Avenue Reconstruction
W 1st St to End of Road
SCAP 2025 Construction 618,431 651,730
WARDEN
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Construction 1,614,073 1,699,024
WARDEN
1st Street North Reconstruction
N County Rd to Railroad tracks
SCAP 2025 Construction 908,922 956,760
WARDEN
W First Street (SR 170) Pathway
S County Rd to Railroad R/W
ATP 2024 Construction 57,375 583,570
WASHOUGAL
Shepherd Road Pedestrian Connection
Washougal River Rd to Lebrun Blvd
UAP 2026 Design 3,473,835 4,342,294
WASHTUCNA
2026 Crack Seal
Multiple Locations
SCPP 2027 Construction 51,200 51,200
WATERVILLE
N Chelan Ave Reconstruction
Poplar St to 3rd St
SCAP 2027 Construction 125,053 440,558
WENATCHEE
Red Apple Road
Vista Pl to Miller St
UAP 2024 Construction 1,830,292 2,465,206
WENATCHEE
9th Street Corridor Improvements
Miller St to BNSF Railroad Crossing
UAP 2025 Design 1,199,000 1,499,170
WENATCHEE
Bridge Street Multimodal Corridor
S Wenatchee Ave to S Columbia S
CSP 2026 Design 1,263,360 1,579,200
WENATCHEE
Orchard Avenue Curb Ramps
Miller St to Western Ave
ATP 2027 Design 410,080 512,600
WEST RICHLAND
Keene Road Overlay
C/L to Bombing Range Rd
APP 2026 Construction 351,310 657,510
WEST RICHLAND
2026 Overlay
Keene Rd to Blue Heron Blvd
APP 2027 Design 674,500 950,000
WEST RICHLAND
S Highlands Blvd and Keene Rd Intersection Improvements
Keene Rd Intersection
UAP 2026 Bid Auth 782,000 920,000
WESTPORT
2026 Maintenance
Multiple Locations
SCPP 2027 Design 153,058 170,065
WILKESON
2026 Townwide Chip Seal
Multiple Locations
SCPP 2027 Construction 201,786 201,786
WILKESON
Railroad Avenue Curb Ramps
Church St to E C/L
ATP 2027 Construction 146,191 151,191
WILSON CREEK
Kathy Blvd Preservation
5th Street to North City Limits
SCPP 2028 Design 32,000 32,000
WINLOCK
ADA Update
Multiple Locations
CSP 2027 Design 394,915 415,700
WINTHROP
Bridge Street Improvement Project
Riverside Ave to Bluff St
ATP 2025 Construction 574,551 649,046
WOODINVILLE
131st Avenue NE (SR 202) Trestle Replacement
NE 175th St to NE 177th Pl
UAP 2025 Bid Auth 5,000,000 16,287,938
WOODINVILLE
124th Ave NE Sidewalk
NE 171st St to NE 165th St
ATP 2026 Construction 315,563 1,357,370
WOODLAND
2026 Overlay
BNSF Railroad to Goering St
APP 2027 Construction 682,544 912,003
WOODWAY
2026 Overlay
Multiple Locations
SCPP 2027 Construction 581,521 715,695
YACOLT
2026 Seal Coat
Multiple Locations
SCPP 2027 Construction 210,741 221,832
YACOLT
Amboy Curb and ADA Retrofit
Multiple Locations
CSP 2026 Design 288,373 303,551
YAKIMA
Fair Avenue Multimodal Improvements
E Nob Hill Blvd to Pacific Ave
CSP 2027 Design 1,200,000 1,500,000
YAKIMA COUNTY
W Powerhouse Road Improvements
S Naches Rd to Naches Heights Rd
UAP 2027 Design 2,063,388 3,579,235
YARROW POINT
2025 Overlay
Multiple Locations
SCPP 2026 Construction 568,892 640,602
YELM
Rhoton Road NW Reconstruction
Railway Rd SE to Yelm Loop Rd (SR 510)
UAP 2027 Design 3,179,750 7,833,776
ZILLAH
2026 Overlay
W 1st Ave to end of road
SCPP 2027 Construction 239,130 274,200