The Centennial Trail is a 40+ mile regional separated path for users until it reaches Boulder Beach on Upriver Dr. The trail is designated to continue along Upriver Dr., but for approximately two miles users are forced to travel a 6-foot-wide bike lane with no physical separation from traffic and functions more like a road shoulder than a trail. Upriver Dr. is an Urban Minor Arterial, T-3 freight route, with a traffic volume of 11,783. This is a high-injury corridor identified through the Safe Streets for All Action Plan in coordination with SRTC.
Projects — TIB Project Information
TIB Project Information
Spokane County's Centennial Trail Infill
C-E-032(003)-1
C-E-032(003)-1
Centennial Trail Infill
Boulder Beach to MP 0.54
FY 2027 Complete Streets Program
Current Phase : Design
Total TIB Funding : $950,000
County: Spokane | Legislative District: 4 | Project Length: 0.15 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
| Lead Agency | SPOKANE COUNTY |
| Funding Year | 2027 |
| Program | CSP |
| Current Phase | Design |
| Legislative District | 4 |
| Congressional District | 5 |
| Federal Route Number | 3902 |
| Project Length | 0.15 mi. |
| ADT | 11,783 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Barry Greene |
| Contact Email | bgreene@spokanecounty.org |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 01/23/2026 |
| Bid Auth. Approval | 09/01/2027 | |
| Construction Approval | 10/01/2027 | |
| Project Closeout | 10/31/2028 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 109,195 | 150,000 |
| Right of Way | 0 | 0 |
| Total Design | 109,195 | 150,000 |
| Construction Engineering | 98,276 | 135,000 |
| Construction Contract | 742,529 | 1,020,000 |
| Other Construction | 0 | 0 |
| Total Construction | 840,805 | 1,155,000 |
| Total TIB Funding | 950,000 | 1,305,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| SPOKANE COUNTY | 50,000 | 3.8% |
| WSDOT Funding | 0 | 0.0% |
| Spokane County Stormwater Utility | 305,000 | 23.4% |
| Total Local Funding | 355,000 | 27.2% |
Project Description
Construct a 10-foot-wide separated shared-use path, a 7.5-foot stormwater swale for stormwater treatment and separation, and safety railing where necessary for a low stress pathway.
Existing Condition
Project Benefits
- Ped and bike safety, mobility and accessibility.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||