The City of Raymond plans to perform maintenance on roadways that have been improved over the past several years. This work is intended to preserve and extend the life of existing pavement infrastructure. Planned maintenance activities include crack sealing, pothole repair, and other localized pavement restoration. These efforts will help maintain roadways while also protecting the City's prior investments in roadway improvements and reducing the need for more costly future repairs.
Projects — TIB Project Information
TIB Project Information
City of Raymond's 2026 Maintenance
2-W-971(005)-1
2-W-971(005)-1
2026 Maintenance
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $71,193
County: Pacific | Legislative District: 19 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | RAYMOND |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Design |
| Legislative District | 19 |
| Congressional District | 3 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | |
| Project Contact | Eric Weiberg |
| Contact Email | ericweiberg@cityofraymond.com |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 03/02/2026 | 02/06/2026 |
| Bid Auth. Approval | 04/17/2026 | |
| Construction Approval | 06/01/2026 | |
| Project Closeout | 08/28/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 71,193 | 74,940 |
| Other Construction | 0 | 0 |
| Total Construction | 71,193 | 74,940 |
| Total TIB Funding | 71,193 | 74,940 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| RAYMOND | 3,747 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 3,747 | 5.0% |
Project Description
The City proposes crack sealing along several roads identified in the project maps t and asphalt pavement repair at some spot locations.
Existing Condition
Project Benefits
- Pavement repair and crack sealing
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||