TIB Project Information

City of Raymond's 2026 Maintenance

2-W-971(005)-1

2-W-971(005)-1
2026 Maintenance

Multiple Locations

FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $71,193

County: Pacific   |   Legislative District: 19   |   Project Length: 0.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency RAYMOND
Funding Year 2027
Program SCPP
Current Phase Design
Legislative District 19
Congressional District 3
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work
Project Contact Eric Weiberg
Contact Email ericweiberg@cityofraymond.com
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 01/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 03/02/2026 02/06/2026
Bid Auth. Approval 04/17/2026
Construction Approval 06/01/2026
Project Closeout 08/28/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 71,193 74,940
Other Construction 0 0
Total Construction 71,193 74,940
     
Total TIB Funding 71,193 74,940

Local Funding Partners

Funding Amount Percent
RAYMOND 3,747 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 3,747 5.0%

Project Description

The City proposes crack sealing along several roads identified in the project maps t and asphalt pavement repair at some spot locations.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.