Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

King County's 16th Avenue SW Overlay

8-1-017(074)-1

8-1-017(074)-1
16th Avenue SW Overlay

SW 100th St to SW 107th St

FY 2026 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $949,964

County: King   |   Legislative District: 34   |   Project Length: 0.65   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 04/16/2026

Project Information

Lead Agency KING COUNTY
Funding Year 2026
Program UAP
Current Phase Construction
Legislative District 34
Congressional District 7
Federal Route Number 1147
Project Length 0.65 mi.
ADT 12,800
Functional Class Principal
Type of Work Resurfacing
Project Contact Julie Wilchins
Contact Email jwilchins@kingcounty.gov
TIB Engineer Greg Armstrong
Last Payment Date 04/16/2026
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2029  
DAHP Assessment Date   09/27/2022
Predesign Approval
Design Approval 01/07/2025 01/07/2025
Bid Auth. Approval 03/15/2025 02/05/2025
Construction Approval 05/06/2025 05/28/2025
Project Closeout 12/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 153,600 222,540
Construction Contract 1,284,000 1,011,546
Other Construction 0 0
Total Construction 1,437,600 1,234,086
     
Funding Surplus - 487,636  
Total TIB Funding 949,964 1,234,086

Local Funding Partners

Funding Amount Percent
KING COUNTY 284,122 23.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 284,122 23.0%

Project Description

This project will complete pavement repairs, and grind and overlay the roadway. First the roadway will be prepared by making repairs to select sections to a depth of 15 inches. Next the roadway will be milled to a depth of 3 inches for the full roadway width and paved back. The roadway would then receive temporary pavement markings. After the paving, HSIP-1147(014) will install all final pavement markings and tubular markers on curb-base and complete several curb ramp replacements to meet ADA standards. Following completion of the repaving and HSIP-1147(014) projects, the roadway will provide improved safety for vehicular travel lanes, bicycle and pedestrian infrastructure, ADA-compliant facilities, reduced speeds, improved crossings, and retention of parking to support local businesses. The facilities will further support multimodal travel by facilitating access to the new Bus Rapid Transit Rapid Ride H Line facilities on 15th Ave. SW. The repaved roadway will also extend the life of the roadway, preventing future costly repairs.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments