7th Street is a vital north-south corridor in Brewster, serving all three schools, park facilities, boat launch, RV park, and the local Boys and Girls Club. It also supports heavy seasonal traffic during peak fishing and agricultural periods and is a primary industrial access route into the wastewater treatment facility and concrete plant. The diversity of uses necessitates improvements in multi-modal infrastructure. To ensure safety, especially for students and recreational users, walking or biking, improvements are needed, including new bike lanes along the entire corridor, new sidewalk connections with strategic street crossings, and rectangular rapid flashing beacons (RRFB). These upgrades will protect families and school children from elementary through high school who travel this busy route daily. With an average PCI of 62, this segment is well-suited for accompanying chip sealing and targeted extensive rehabilitation to extend pavement life and avoid extensive reconstruction.
Projects — TIB Project Information
TIB Project Information
City of Brewster's 7th Street Multimodal Improvements
C-E-876(001)-1
C-E-876(001)-1
7th Street Multimodal Improvements
Main Ave to Bruce Ave
FY 2027 Complete Streets Program
Current Phase : Bid Authorization
Total TIB Funding : $1,268,612
County: Okanogan | Legislative District: 7 | Project Length: 0.60 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
| Lead Agency | BREWSTER |
| Funding Year | 2027 |
| Program | CSP |
| Current Phase | Bid Authorization |
| Legislative District | 7 |
| Congressional District | 4 |
| Federal Route Number | 24BR |
| Project Length | 0.60 mi. |
| ADT | 0 |
| Functional Class | Collector |
| Type of Work | Safety |
| Project Contact | Bryan Jensen |
| Contact Email | bjensen@jub.com |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | 03/20/2026 | |
| Predesign Approval | ||
| Design Approval | 12/18/2025 | 12/18/2025 |
| Bid Auth. Approval | 04/15/2026 | 04/26/2026 |
| Construction Approval | 05/18/2026 | |
| Project Closeout | 11/20/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 88,668 | 93,358 |
| Right of Way | 0 | 0 |
| Total Design | 88,668 | 93,358 |
| Construction Engineering | 83,919 | 88,358 |
| Construction Contract | 1,096,025 | 1,154,000 |
| Other Construction | 0 | 0 |
| Total Construction | 1,179,944 | 1,242,358 |
| Total TIB Funding | 1,268,612 | 1,335,716 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| BREWSTER | 67,104 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 67,104 | 5.0% |
Project Description
Chip seal 7th from the south side of Main to Bruce with rehabilitation between Sunset and Cliff. Add new sidewalk to connect the schools to the boys and girls club, two RRFB enhanced crossings, and buffered bike lanes.
Existing Condition
Project Benefits
- Ped and bike safety mobility and accessibility.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||