The current pavement is worn, cracked and rutted with potholes, and areas of severe alligator cracking. Current pavement markings are not compliant with current standards. Existing ramps do not meet current ADA slope, width, and landing requirements. Existing markers are in need of replacement.
Projects — TIB Project Information
TIB Project Information
City of Fircrest's 2025 Regents West Overlay
3-P-130(006)-1
3-P-130(006)-1
2025 Regents West Overlay
Alameda Ave and 67th Ave
FY 2027 Arterial Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $698,607
County: Pierce | Legislative District: 28 | Project Length: 0.41 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | FIRCREST |
| Funding Year | 2027 |
| Program | APP |
| Current Phase | Bid Authorization |
| Legislative District | 28 |
| Congressional District | 10 |
| Federal Route Number | 3236 |
| Project Length | 0.41 mi. |
| ADT | 0 |
| Functional Class | Minor |
| Type of Work | Resurfacing |
| Project Contact | Tyler Bemis |
| Contact Email | tbemis@cityoffircrest.net |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/07/2026 | 01/06/2026 |
| Bid Auth. Approval | 03/25/2026 | 03/30/2026 |
| Construction Approval | 04/28/2026 | |
| Project Closeout | 12/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 698,607 | 1,027,362 |
| Other Construction | 0 | 0 |
| Total Construction | 698,607 | 1,027,362 |
| Total TIB Funding | 698,607 | 1,027,362 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| FIRCREST | 328,755 | 32.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 328,755 | 32.0% |
Project Description
2-inch grind and overlay with 9 ADA ramp upgrades of Regents Boulevard from Alameda Ave to 67th Ave
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||