City of Ferndale's Main Street Reconstruction

8-2-985(012)-1

8-2-985(012)-1
Main Street Reconstruction

Barrett Rd to Old Settler Dr

FY 2027 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $3,000,000

County: Whatcom   |   Legislative District: 42   |   Project Length: 0.71   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency FERNDALE
Funding Year 2027
Program UAP
Current Phase Design
Legislative District 42
Congressional District 2
Federal Route Number 8030
Project Length 0.71 mi.
ADT 11,721
Functional Class Minor
Type of Work Reconstruction
Project Contact Kevin Renz
Contact Email KevinRenz@cityofferndale.org
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2030  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2026 12/04/2025
Bid Auth. Approval 09/15/2026
Construction Approval 12/07/2026
Project Closeout 11/23/2027
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 291,586 1,000,000
Construction Contract 2,664,676 9,138,544
Other Construction 43,738 150,000
Total Construction 3,000,000 10,288,544
     
Total TIB Funding 3,000,000 10,288,544

Local Funding Partners

Funding Amount Percent
FERNDALE 5,902,946 57.4%
WSDOT Funding 0 0.0%
STBG  1,250,000 12.1%
Carbon Reduction Program  135,598 1.3%
 
 
 
 
 
 
Total Local Funding 7,288,544 70.8%

Project Description

The roadway will be reconstructed and widened to current standards. ADA compliant sidewalks and ramps will be installed on both sides of the street and at crosswalks. The proposed 5 ft shoulders will be clearly delineated and provide a safe route for bicycle users. The proposed shoulders and sidewalk will connect to existing shoulders and sidewalks, thus providing safe access and connectivity. Roadside hazards will be relocated outside of the clear zone. A new illumination system will be installed. A rectangular rapid flashing beacon (RRFB) will be installed near the transit facility to increase pedestrian safety for pedestrians crossing the road. Stormwater will be treated and detained.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments