City of Toledo's Augustus Street and 4th Street Sidewalks

P-W-965(P08)-1

P-W-965(P08)-1
Augustus Street and 4th Street Sidewalks

S 5th S to S 3rd St and Cowlitz St

FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $425,667

County: Lewis   |   Legislative District: 20   |   Project Length: 600.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 04/22/2026

Project Information

Lead Agency TOLEDO
Funding Year 2027
Program ATP
Current Phase Design
Legislative District 20
Congressional District 3
Federal Route Number 9999
Project Length 600.00 mi.
ADT 750
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Rachel Beaver-Campbell
Contact Email Rachel.beaver@toledowa.us
TIB Engineer Chris Langhoff
Last Payment Date 04/22/2026
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/12/2026 12/08/2025
Bid Auth. Approval 05/20/2026
Construction Approval 06/15/2026
Project Closeout 09/25/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 49,115 52,250
Right of Way 0 0
Total Design 49,115 52,250
     
Construction Engineering 49,115 52,250
Construction Contract 327,437 348,337
Other Construction 0 0
Total Construction 376,552 400,587
     
Total TIB Funding 425,667 452,837

Local Funding Partners

Funding Amount Percent
TOLEDO 27,170 6.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 27,170 6.0%

Project Description

A new 5-foot wide sidewalk with a planter strip, curb, and ADA-compliant curb ramps will be installed on the north side of Augustus Street between 5th Street and 4th Street, and a new 5-foot wide sidewalk with curb, bulb-outs for existing utility poles, vaults, and pedestals, and ADA compliant curb ramps will be installed on the north side of Augustus Street between 4th Street and 3rd Street, and a new 5-foot wide sidewalk with curb, bulb-outs, and ADA compliant curb ramps will be installed on the east side of 4th Street between Augustus Street and Cowlitz Street, connecting to previously completed improvements on Cowlitz Street.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.