The existing sidewalk on the north side of Augustus Street has a substandard width, and there is no horizontal or vertical separation of pedestrians from the street.There is no sidewalk on 4th Street between Augustus Street and Cowlitz Street and pedestrians walk on the street or unpaved shoulder.
Projects — TIB Project Information
TIB Project Information
City of Toledo's Augustus Street and 4th Street Sidewalks
P-W-965(P08)-1
P-W-965(P08)-1
Augustus Street and 4th Street Sidewalks
S 5th S to S 3rd St and Cowlitz St
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $425,667
County: Lewis | Legislative District: 20 | Project Length: 600.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 04/22/2026
Project Information
| Lead Agency | TOLEDO |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 20 |
| Congressional District | 3 |
| Federal Route Number | 9999 |
| Project Length | 600.00 mi. |
| ADT | 750 |
| Functional Class | TIB Arterial |
| Type of Work | Pedestrian |
| Project Contact | Rachel Beaver-Campbell |
| Contact Email | Rachel.beaver@toledowa.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 04/22/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/12/2026 | 12/08/2025 |
| Bid Auth. Approval | 05/20/2026 | |
| Construction Approval | 06/15/2026 | |
| Project Closeout | 09/25/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 49,115 | 52,250 |
| Right of Way | 0 | 0 |
| Total Design | 49,115 | 52,250 |
| Construction Engineering | 49,115 | 52,250 |
| Construction Contract | 327,437 | 348,337 |
| Other Construction | 0 | 0 |
| Total Construction | 376,552 | 400,587 |
| Total TIB Funding | 425,667 | 452,837 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| TOLEDO | 27,170 | 6.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 27,170 | 6.0% |
Project Description
A new 5-foot wide sidewalk with a planter strip, curb, and ADA-compliant curb ramps will be installed on the north side of Augustus Street between 5th Street and 4th Street, and a new 5-foot wide sidewalk with curb, bulb-outs for existing utility poles, vaults, and pedestals, and ADA compliant curb ramps will be installed on the north side of Augustus Street between 4th Street and 3rd Street, and a new 5-foot wide sidewalk with curb, bulb-outs, and ADA compliant curb ramps will be installed on the east side of 4th Street between Augustus Street and Cowlitz Street, connecting to previously completed improvements on Cowlitz Street.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||