The current Main St corridor lacks ADA compliant pathways and looks outdated. The proposed project would revitalize the citys main thoroughfare and business district.
Projects — TIB Project Information
TIB Project Information
Town of Bucoda's Main Street Improvements
C-W-975(001)-1
C-W-975(001)-1
Main Street Improvements
7th St to 5th St
FY 2027 Complete Streets Program
Current Phase : Design
Total TIB Funding : $880,627
County: Thurston | Legislative District: 20 | Project Length: 0.15 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | BUCODA |
| Funding Year | 2027 |
| Program | CSP |
| Current Phase | Design |
| Legislative District | 20 |
| Congressional District | 3 |
| Federal Route Number | J341 |
| Project Length | 0.15 mi. |
| ADT | 0 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Devin Jackson |
| Contact Email | admin@jacksoncivil.com |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 02/12/2026 |
| Bid Auth. Approval | 03/01/2027 | |
| Construction Approval | 03/21/2027 | |
| Project Closeout | 09/30/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 87,956 | 120,000 |
| Right of Way | 0 | 0 |
| Total Design | 87,956 | 120,000 |
| Construction Engineering | 111,411 | 152,000 |
| Construction Contract | 681,260 | 929,460 |
| Other Construction | 0 | 0 |
| Total Construction | 792,671 | 1,081,460 |
| Total TIB Funding | 880,627 | 1,201,460 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| BUCODA | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Thurston County | 320,833 | 26.7% |
| Total Local Funding | 320,833 | 26.7% |
Project Description
This project provides for roadway improvements along Main St. The project begins at the intersection of N Main and E 5th St and ends just past town hall on S Main St.
Existing Condition
Project Benefits
- This project includes: crack and seat concrete pavement and HMA overlay for 800 feet on Main St mainline, remove and replace sidewalk, curb, and gutter associated with 3 plant strip, remove and replace driveway drops, and update street illumination system.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||