Shepherd Road is a two-lane collector between Washougal River Road and NE 3rd Avenue. Mid way along this stretch between N 12th St and N 4th Ct is a waterfront park called Sandy Swimming Hole. Access to the park can only be attained off Shepherd Road and the existing park has only a few spaces to accommodate residents. There are no existing sidewalk or bike connections to the park and visitors often illegally park off within the roadway and the surrounding neighborhoods.
Projects — TIB Project Information
TIB Project Information
City of Washougal's Shepherd Road Pedestrian Connection
8-5-186(009)-1
8-5-186(009)-1
Shepherd Road Pedestrian Connection
Washougal River Rd to Lebrun Blvd
FY 2026 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $3,473,835
County: Clark | Legislative District: 17 | Project Length: 1.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 04/07/2026
Project Information
| Lead Agency | WASHOUGAL |
| Funding Year | 2026 |
| Program | UAP |
| Current Phase | Design |
| Legislative District | 17 |
| Congressional District | 3 |
| Federal Route Number | 7056 |
| Project Length | 1.00 mi. |
| ADT | 2,027 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Trevor Evers |
| Contact Email | Trevor.Evers@cityofwashougal.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 04/07/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2024 | |
| Delayed Project Date | 07/01/2029 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/01/2025 | 01/07/2025 |
| Bid Auth. Approval | 03/27/2027 | |
| Construction Approval | 05/01/2027 | |
| Project Closeout | 10/17/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 353,271 | 441,589 |
| Right of Way | 0 | 0 |
| Total Design | 353,271 | 441,589 |
| Construction Engineering | 176,636 | 220,795 |
| Construction Contract | 2,943,928 | 3,679,910 |
| Other Construction | 0 | 0 |
| Total Construction | 3,120,564 | 3,900,705 |
| Total TIB Funding | 3,473,835 | 4,342,294 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| WASHOUGAL | 868,459 | 20.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 868,459 | 20.0% |
Project Description
The City plans to widen Shepherd Road to the north allowing for on-street parking, new bicycle lanes, and new sidewalk connections. The City also plans to incorporate traffic calming due to the speeds and install a raised crosswalk so pedestrians can access the park while reducing vehicle speed along the corridor.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||