Farnham St. and Webster Ave. is a critical intersection for vehicles, cyclists, and pedestrians. The primary safety concern is the proximity of the intersection to the Dan Gordan Bridge and the occurrence of west bound vehicles having a limited reaction time to respond to pedestrians using the crosswalk.
Projects — TIB Project Information
TIB Project Information
City of Chelan's Farnham St. and Webster Ave. Pedestrian Improvements
C-E-848(002)-1
C-E-848(002)-1
Farnham St. and Webster Ave. Pedestrian Improvements
US 97A SRMP 233.90 to 234.00
FY 2027 Complete Streets Program
Current Phase : Design
Total TIB Funding : $317,260
County: Chelan | Legislative District: 12 | Project Length: 0.09 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
| Lead Agency | CHELAN |
| Funding Year | 2027 |
| Program | CSP |
| Current Phase | Design |
| Legislative District | 12 |
| Congressional District | 8 |
| Federal Route Number | 097AR |
| Project Length | 0.09 mi. |
| ADT | 7,100 |
| Functional Class | Minor |
| Type of Work | Pedestrian |
| Project Contact | Travis Denham |
| Contact Email | tdenham@cityofchelan.us |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 12/10/2025 |
| Bid Auth. Approval | 11/01/2026 | |
| Construction Approval | 01/01/2027 | |
| Project Closeout | 05/31/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 36,607 | 40,675 |
| Right of Way | 0 | 0 |
| Total Design | 36,607 | 40,675 |
| Construction Engineering | 36,607 | 40,675 |
| Construction Contract | 244,046 | 271,164 |
| Other Construction | 0 | 0 |
| Total Construction | 280,653 | 311,839 |
| Total TIB Funding | 317,260 | 352,514 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| CHELAN | 35,254 | 10.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 35,254 | 10.0% |
Project Description
The project consists of the installation of an RRFB system at the crosswalk and advanced warning on the bridge, concrete barrier to discourage illegal crossings, and pedestrian illumination.
Existing Condition
Project Benefits
- The complete streets elements being used for this project include improved safety for pedestrians crossing Webster Ave./US97A through the installation of an advanced warning signal, rectangular rapid flashing beacons, improved pedestrian illumination, reduced ADA barriers, and crosswalk pavement markings.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||