City of Grandview's 2026 Overlay

3-E-183(012)-1

3-E-183(012)-1
2026 Overlay

Multiple Locations

FY 2027 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $580,388

County: Yakima   |   Legislative District: 14   |   Project Length: 0.54   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency GRANDVIEW
Funding Year 2027
Program APP
Current Phase Design
Legislative District 14
Congressional District 4
Federal Route Number 8053
Project Length 0.54 mi.
ADT 5,000
Functional Class Minor
Type of Work Resurfacing
Project Contact Shane Fisher
Contact Email sfisher@grandview.wa.us
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/20/2026 12/11/2025
Bid Auth. Approval 03/03/2027
Construction Approval 03/23/2027
Project Closeout 05/28/2027
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 56,025 62,250
Right of Way 0 0
Total Design 56,025 62,250
     
Construction Engineering 64,035 71,150
Construction Contract 460,328 511,475
Other Construction 0 0
Total Construction 524,363 582,625
     
Total TIB Funding 580,388 644,875

Local Funding Partners

Funding Amount Percent
GRANDVIEW 64,487 10.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 64,487 10.0%

Project Description

Full width grind and overlay.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.