Algona Blvd Seattle Blvd (PCR 52), Algona Blvd Main St (PCR 54), and 2nd Ave N1st Ave N (PCR 52) sit in TIBs poor band PCR 52-54 on a 0-100 scale, indicating fewer than five years of service life left. Pavement shows alligator cracking, rutting, edge raveling, and potholes, causing rough rides, water intrusion, and accelerating base failure.
Projects — TIB Project Information
TIB Project Information
City of Algona's 2026 Overlay
2-P-119(008)-1
2-P-119(008)-1
2026 Overlay
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $347,609
County: King | Legislative District: 30 | Project Length: 0.36 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | ALGONA |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Bid Authorization |
| Legislative District | 30 |
| Congressional District | 9 |
| Federal Route Number | 9999 |
| Project Length | 0.36 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | John Bielka |
| Contact Email | johnb@algonawa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/15/2026 | 02/05/2026 |
| Bid Auth. Approval | 04/30/2026 | 04/23/2026 |
| Construction Approval | 05/14/2026 | |
| Project Closeout | 07/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 38,623 | 42,914 |
| Right of Way | 0 | 0 |
| Total Design | 38,623 | 42,914 |
| Construction Engineering | 38,623 | 42,914 |
| Construction Contract | 270,363 | 300,404 |
| Other Construction | 0 | 0 |
| Total Construction | 308,986 | 343,318 |
| Total TIB Funding | 347,609 | 386,232 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ALGONA | 38,623 | 10.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 38,623 | 10.0% |
Project Description
2-inch grind and overlay with minor pavment repair of the following segments 2nd Avenue N - Algona Blvd to Seattle Blvd Seattle Boulevard - 2nd Ave N to 1st Ave N 3rd Avenue N - Algona Blvd to Main St
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||