Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of North Bend's 2026 Sidewalk Gap Projects

P-P-804(P10)-1

P-P-804(P10)-1
2026 Sidewalk Gap Projects

Various locations

FY 2027 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $860,310

County: King   |   Legislative District: 12   |   Project Length: 2,560.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency NORTH BEND
Funding Year 2027
Program ATP
Current Phase Bid Authorization
Legislative District 12
Congressional District 8
Federal Route Number 2823
Project Length 2560.00 mi.
ADT 3,000
Functional Class Collector
Type of Work Pedestrian
Project Contact Mike Mayen
Contact Email mmayen@northbendwa.gov
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 01/01/2027  
DAHP Assessment Date   02/13/2026
Predesign Approval
Design Approval 02/05/2026 02/05/2026
Bid Auth. Approval 04/10/2026 04/06/2026
Construction Approval 05/06/2026
Project Closeout 12/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 105,434 131,793
Construction Contract 754,876 943,595
Other Construction 0 0
Total Construction 860,310 1,075,388
     
Total TIB Funding 860,310 1,075,388

Local Funding Partners

Funding Amount Percent
NORTH BEND 215,078 20.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 215,078 20.0%

Project Description

The solution to this need is for the City of North Bend need for safe accessible and connected pedestrian infrastructure and propose targeted construction of short sidewalk segments that close critical gaps in the existing network along main throughfares within city limits.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments