The City of North Bend is actively working on enhancing pedestrian safety through our Sidewalk Gap Removal Program. Community need is connecting trail and neighborhoods to the school systems. Safety, accessibility, connectivity and livability are the reasons for community need and offering an alternative to road transportation.
Projects — TIB Project Information
TIB Project Information
City of North Bend's 2026 Sidewalk Gap Projects
P-P-804(P10)-1
P-P-804(P10)-1
2026 Sidewalk Gap Projects
Various locations
FY 2027 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $860,310
County: King | Legislative District: 12 | Project Length: 2,560.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | NORTH BEND |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Bid Authorization |
| Legislative District | 12 |
| Congressional District | 8 |
| Federal Route Number | 2823 |
| Project Length | 2560.00 mi. |
| ADT | 3,000 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Mike Mayen |
| Contact Email | mmayen@northbendwa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | 02/13/2026 | |
| Predesign Approval | ||
| Design Approval | 02/05/2026 | 02/05/2026 |
| Bid Auth. Approval | 04/10/2026 | 04/06/2026 |
| Construction Approval | 05/06/2026 | |
| Project Closeout | 12/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 105,434 | 131,793 |
| Construction Contract | 754,876 | 943,595 |
| Other Construction | 0 | 0 |
| Total Construction | 860,310 | 1,075,388 |
| Total TIB Funding | 860,310 | 1,075,388 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| NORTH BEND | 215,078 | 20.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 215,078 | 20.0% |
Project Description
The solution to this need is for the City of North Bend need for safe accessible and connected pedestrian infrastructure and propose targeted construction of short sidewalk segments that close critical gaps in the existing network along main throughfares within city limits.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||