NE 150th Street has only two sidewalk gaps between 275 Ave NE and 286th Ave NE, both of which are roughly 300 sections close to the 275th Ave NE intersection. The surrounding parcels are either fully developed or have no plans for development, so the City needs to take the lead on the gap completion. NE 150th St in Duvall serves as the only road in and out of the local Cedarcrest High School, leading to high traffic volumes and major pedestrian usage before and after school. In addition, Judd Park is nestled at the intersection of NE 150th St and NE 275th St. Its central location and toddler focused play equipment means that the parks associated travel routes experiences significant usage. There are also two other neighborhood parks within walking distance of the project limits. In addition, the area around the project limits is high density, R8 Zoning, which demands adequate pedestrian facilities to safely transport students to and from school as well as ensure safety for park users.
Projects — TIB Project Information
TIB Project Information
City of Duvall's NE 150th Sidewalk Extension
P-P-802(P06)-1
P-P-802(P06)-1
NE 150th Sidewalk Extension
275th Place NE to 278th Ave NE
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $672,000
County: King | Legislative District: 45 | Project Length: 590.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | DUVALL |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 45 |
| Congressional District | 8 |
| Federal Route Number | 2274 |
| Project Length | 590.00 mi. |
| ADT | 4,820 |
| Functional Class | Minor |
| Type of Work | Pedestrian |
| Project Contact | Benjamin Sackett |
| Contact Email | benjamin.sackett@duvallwa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/16/2026 | 11/26/2025 |
| Bid Auth. Approval | 01/26/2027 | |
| Construction Approval | 03/02/2027 | |
| Project Closeout | 10/08/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 72,000 | 90,000 |
| Right of Way | 0 | 0 |
| Total Design | 72,000 | 90,000 |
| Construction Engineering | 56,000 | 70,000 |
| Construction Contract | 544,000 | 680,000 |
| Other Construction | 0 | 0 |
| Total Construction | 600,000 | 750,000 |
| Total TIB Funding | 672,000 | 840,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| DUVALL | 168,000 | 100.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 168,000 | 0.0% |
Project Description
Completing the sidewalk gaps in the area of Judd Park and Cedar Crest Highschool would essentially connect Cedarcrest Highschool and Judd Park/ 275th Ave NE for pedestrians on both sides of NE 150 Street. In addition to the sidewalk gaps, the project will complete the designated bike lane heading East toward Cedarcrest Highschool. Students leaving school or families leaving the park and needing to go South, would now have more natural options to safely cross and filter into one of the four residential streets intersecting NE 150th St. Completing these sidewalk gaps will also alleviate some of pedestrian volume crossing NE 150th St at the very busy intersection of NE 150th street and 275 Ave NE and provide more efficient foot travel.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||