Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of La Center's Pacific Highway Shared Use Path

P-W-949(001)-1

P-W-949(001)-1
Pacific Highway Shared Use Path

Larsen Dr to existing sidewalk

FY 2026 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $163,481

County: Clark   |   Legislative District: 20   |   Project Length: 1,900.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency LA CENTER
Funding Year 2026
Program ATP
Current Phase Construction
Legislative District 20
Congressional District 3
Federal Route Number D063
Project Length 1900.00 mi.
ADT 2,065
Functional Class Collector
Type of Work Pedestrian
Project Contact Tony Cooper
Contact Email acooper@ci.lacenter.wa.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date   08/12/2026
Predesign Approval
Design Approval 12/15/2024 12/04/2024
Bid Auth. Approval 09/01/2026 08/17/2026
Construction Approval 10/01/2026 10/13/2026
Project Closeout 12/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 351,211
Construction Contract 500,000 1,668,297
Other Construction 0 0
Total Construction 500,000 2,019,508
     
Funding Surplus - 336,519  
Total TIB Funding 163,481 2,019,508

Local Funding Partners

Funding Amount Percent
LA CENTER 0 0.0%
WSDOT Funding 0 0.0%
Transportation Alternative -fed  351,156 17.4%
State appropriation  562,655 27.9%
Redistributed Federal  942,216 46.7%
 
 
 
 
 
Total Local Funding 1,856,027 92.0%

Project Description

A 10-feet wide shared use concrete path is currently being designed between Larsen Drive and the existing sidewalk adjacent to Kays Subdivision. This will be approximately a 1,900 lineal foot wide path, with a bridge installed over the existing creek adjacent to the guardrail. Retaining walls will be installed along the length of the trail to stay within existing city right of way. The path will be lighted with cobra head lights that will light the path and Pacific Highway.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments