Kentucky Ave, Wallace Street, and Union Street are all part of the original downtown, so the asphalt is typically 2 to 3 inches thick (or less), has excessive cracks, and is getting to the end of its useful life. Most of these segments have been crack sealed in the last two years and the City will pay for any additional crack sealing needed during construction.
Projects — TIB Project Information
TIB Project Information
City of Granite Falls's 2026 Overlay
2-P-820(013)-1
2-P-820(013)-1
2026 Overlay
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $552,780
County: Snohomish | Legislative District: 39 | Project Length: 0.36 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | GRANITE FALLS |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Design |
| Legislative District | 39 |
| Congressional District | 8 |
| Federal Route Number | 9999 |
| Project Length | 0.36 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Charles White |
| Contact Email | charles.white@ci.granite-falls.wa.us |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/15/2026 | 12/04/2025 |
| Bid Auth. Approval | 05/06/2026 | |
| Construction Approval | 05/26/2026 | |
| Project Closeout | 09/18/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 64,800 | 72,000 |
| Right of Way | 0 | 0 |
| Total Design | 64,800 | 72,000 |
| Construction Engineering | 43,200 | 48,000 |
| Construction Contract | 444,780 | 494,200 |
| Other Construction | 0 | 0 |
| Total Construction | 487,980 | 542,200 |
| Total TIB Funding | 552,780 | 614,200 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| GRANITE FALLS | 61,420 | 10.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 61,420 | 10.0% |
Project Description
2-inch grind and overlay with pavement repair of the following segments Union Street - City Hall to Indiana Ave Kentucky Avenue - Pioneer St to Grand St Kentucky Avenue - Pioneer St to Union St
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||