Clark County's NE 152nd Avenue

8-5-006(044)-1

8-5-006(044)-1
NE 152nd Avenue

Padden Pkwy to NE 99th St

FY 2025 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $3,500,000

County: Clark   |   Legislative District: 18   |   Project Length: 0.78   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 01/30/2026

Project Information

Lead Agency CLARK COUNTY
Funding Year 2025
Program UAP
Current Phase Construction
Legislative District 18
Congressional District 3
Federal Route Number 4233
Project Length 0.78 mi.
ADT 11,657
Functional Class Collector
Type of Work Major Widening
Project Contact John Mcsherry
Contact Email john.mcsherry@clark.wa.gov
TIB Engineer Chris Langhoff
Last Payment Date 01/30/2026
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2028  
DAHP Assessment Date   08/22/2025
Predesign Approval
Design Approval 02/01/2024 01/31/2024
Bid Auth. Approval 09/01/2025 08/25/2025
Construction Approval 10/30/2025 10/23/2025
Project Closeout 01/25/2028
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 120,000 1,123,000
Right of Way 275,000 673,000
Total Design 395,000 1,796,000
     
Construction Engineering 480,000 1,400,600
Construction Contract 2,487,000 7,242,817
Other Construction 138,000 0
Total Construction 3,105,000 8,643,417
     
Total TIB Funding 3,500,000 10,439,417

Local Funding Partners

Funding Amount Percent
CLARK COUNTY 239,417 2.3%
WSDOT Funding 0 0.0%
STBG UL  6,700,000 64.2%
 
 
 
 
 
 
 
Total Local Funding 6,939,417 66.5%

Project Description

This project reconstructs the NE 152nd Avenue from an obsolete two-lane road to modern urban collector with bike lanes and sidewalks. The NE 152ndAvenue/NE 99th Street intersection will be reconfigured from an all-way stop control to a signal-controlled intersection.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments