The proposed street surfaces have existing surface degradation, cracking and patches.
Projects — TIB Project Information
TIB Project Information
City of Ellensburg's 2026 Overlay
3-E-175(005)-1
3-E-175(005)-1
2026 Overlay
Umptanum Rd to Mountain View Ave
FY 2027 Arterial Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $422,287
County: Kittitas | Legislative District: 13 | Project Length: 0.29 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
| Lead Agency | ELLENSBURG |
| Funding Year | 2027 |
| Program | APP |
| Current Phase | Bid Authorization |
| Legislative District | 13 |
| Congressional District | 8 |
| Federal Route Number | 6949 |
| Project Length | 0.29 mi. |
| ADT | 12,432 |
| Functional Class | Principal |
| Type of Work | Resurfacing |
| Project Contact | Josh Mattson |
| Contact Email | mattsonj@ci.ellensburg.wa.gov |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/15/2026 | 01/08/2026 |
| Bid Auth. Approval | 04/10/2026 | 04/06/2026 |
| Construction Approval | 05/10/2026 | |
| Project Closeout | 08/15/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 28,000 | 35,000 |
| Right of Way | 0 | 0 |
| Total Design | 28,000 | 35,000 |
| Construction Engineering | 10,389 | 12,986 |
| Construction Contract | 383,898 | 479,865 |
| Other Construction | 0 | 0 |
| Total Construction | 394,287 | 492,851 |
| Total TIB Funding | 422,287 | 527,851 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ELLENSBURG | 105,564 | 20.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 105,564 | 20.0% |
Project Description
The project will grind and place a 0.2 asphalt overlay on Canyon Road. An asphalt surface grind and overlay will repair surface degradation, cracks, and patches. The project will also replace and update the channelization.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||