TIB Project Information

City of Elma's 2026 Maintenance

2-W-955(003)-1

2-W-955(003)-1
2026 Maintenance

Multiple Locations

FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $144,875

County: Grays Harbor   |   Legislative District: 24   |   Project Length: 0.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency ELMA
Funding Year 2027
Program SCPP
Current Phase Design
Legislative District 24
Congressional District 6
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work
Project Contact Rick Eaton
Contact Email pwdirector@cityofelma.com
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 01/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 03/02/2026 01/08/2026
Bid Auth. Approval 04/03/2026
Construction Approval 06/15/2016
Project Closeout 07/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 144,875 152,500
Other Construction 0 0
Total Construction 144,875 152,500
     
Total TIB Funding 144,875 152,500

Local Funding Partners

Funding Amount Percent
ELMA 7,625 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 7,625 5.0%

Project Description

Sealing cracks and minor patching of potholes and areas that are in need of larger surface area replacement versus crack sealing.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments