Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Montesano's 2026 Maintenance

2-W-957(019)-1

2-W-957(019)-1
2026 Maintenance

Multiple Locations

FY 2027 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $114,610

County: Grays Harbor   |   Legislative District: 24   |   Project Length: 0.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency MONTESANO
Funding Year 2027
Program SCPP
Current Phase Construction
Legislative District 24
Congressional District 6
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work
Project Contact MIke Olden
Contact Email molden@montesano.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 01/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/30/2026 01/27/2026
Bid Auth. Approval 03/15/2026 03/09/2026
Construction Approval 04/13/2026 04/17/2026
Project Closeout 06/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 116,100 127,510
Other Construction 0 0
Total Construction 116,100 127,510
     
Funding Surplus - 1,490  
Total TIB Funding 114,610 127,510

Local Funding Partners

Funding Amount Percent
MONTESANO 12,900 10.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 12,900 10.0%

Project Description

Grind and overlay the section of deteriorated E. Pioneer. Design this overlay to increase the cross slope in this road section to help move the water off the road and into the drainage system.Pre-level Fleet Street from Spruce to Broadway and S. 1st Street from Wynooche Avenue to the South end. Prepare for the pre-level with strategic grinding and work by City crews to upgrade shoulder/sidewalk conditions.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments