This existing crosswalk experiences significant local use by the Roy Elementary School students and is one of two crossings for the western side of town to cross the railway. The existing ADA curb ramps do not meet standards and the drainage is failing, causing ponding at the crossing. The west side of the existing crossing has no ADA ramps or pathway to access Warren Street and exposes pedestrians to traffic along Higgins Greig Road.
Projects — TIB Project Information
TIB Project Information
City of Roy's SR 507 Crossing Project
P-P-814(P03)-1
P-P-814(P03)-1
SR 507 Crossing Project
W Huggins Greig Rd
FY 2027 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $95,000
County: Pierce | Legislative District: 2 | Project Length: 200.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | ROY |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Bid Authorization |
| Legislative District | 2 |
| Congressional District | 10 |
| Federal Route Number | 0507 |
| Project Length | 200.00 mi. |
| ADT | 14,231 |
| Functional Class | Minor |
| Type of Work | Pedestrian |
| Project Contact | Ryan Fuller |
| Contact Email | publicworks@cityofroywa.us |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 12/15/2025 | 12/04/2025 |
| Bid Auth. Approval | 04/15/2026 | 04/09/2026 |
| Construction Approval | 05/30/2026 | |
| Project Closeout | 08/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 95,000 | 100,000 |
| Other Construction | 0 | 0 |
| Total Construction | 95,000 | 100,000 |
| Total TIB Funding | 95,000 | 100,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ROY | 5,000 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 5,000 | 5.0% |
Project Description
This scope of work is to improve the safety of the crossing with RRFB signage, improved ADA ramps, drainage, and a sidewalk from the west side of SR 507 to Warren Street. A rectangular rapid flashing beacon (RRFB) crossing at the southern crosswalk adjacent to the Roy Chevron station across SR-507 to Higgens Greig Road will be installed and to provide a new cement concrete sidewalk westward, terminating on the west side of the existing railway.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||