City of Roy's SR 507 Crossing Project

P-P-814(P03)-1

P-P-814(P03)-1
SR 507 Crossing Project

W Huggins Greig Rd

FY 2027 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $95,000

County: Pierce   |   Legislative District: 2   |   Project Length: 200.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency ROY
Funding Year 2027
Program ATP
Current Phase Bid Authorization
Legislative District 2
Congressional District 10
Federal Route Number 0507
Project Length 200.00 mi.
ADT 14,231
Functional Class Minor
Type of Work Pedestrian
Project Contact Ryan Fuller
Contact Email publicworks@cityofroywa.us
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 01/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 12/15/2025 12/04/2025
Bid Auth. Approval 04/15/2026 04/09/2026
Construction Approval 05/30/2026
Project Closeout 08/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 95,000 100,000
Other Construction 0 0
Total Construction 95,000 100,000
     
Total TIB Funding 95,000 100,000

Local Funding Partners

Funding Amount Percent
ROY 5,000 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 5,000 5.0%

Project Description

This scope of work is to improve the safety of the crossing with RRFB signage, improved ADA ramps, drainage, and a sidewalk from the west side of SR 507 to Warren Street. A rectangular rapid flashing beacon (RRFB) crossing at the southern crosswalk adjacent to the Roy Chevron station across SR-507 to Higgens Greig Road will be installed and to provide a new cement concrete sidewalk westward, terminating on the west side of the existing railway.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments