The road is 3 lanes wide with curb, gutter, and sidewalk on both sides, for Segment 1 (SR20 to Ely Street). The road is 2 lanes wide with intermittent curb, gutter, and sidewalk for Segment 2 (Ely Street to SE 8th Avenue). Lanes vary in width from 12-feet to 16-feet.
Projects — TIB Project Information
TIB Project Information
City of Oak Harbor's SE Barrington Drive Overlay
3-W-157(003)-1
3-W-157(003)-1
SE Barrington Drive Overlay
Hwy 20 Dr to SE 8th Ave
FY 2027 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $669,252
County: Island | Legislative District: 10 | Project Length: 0.61 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | OAK HARBOR |
| Funding Year | 2027 |
| Program | APP |
| Current Phase | Design |
| Legislative District | 10 |
| Congressional District | 2 |
| Federal Route Number | 7766 |
| Project Length | 0.61 mi. |
| ADT | 7,000 |
| Functional Class | Collector |
| Type of Work | Resurfacing |
| Project Contact | Phillip Esqueda |
| Contact Email | pesqueda@oakharbor.org |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 12/04/2025 |
| Bid Auth. Approval | 07/01/2026 | |
| Construction Approval | 07/31/2026 | |
| Project Closeout | 11/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 669,252 | 875,886 |
| Other Construction | 0 | 0 |
| Total Construction | 669,252 | 875,886 |
| Total TIB Funding | 669,252 | 875,886 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| OAK HARBOR | 206,634 | 23.6% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 206,634 | 23.6% |
Project Description
2 inch grind and overlay
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||