City of Oak Harbor's SE Barrington Drive Overlay

3-W-157(003)-1

3-W-157(003)-1
SE Barrington Drive Overlay

Hwy 20 Dr to SE 8th Ave

FY 2027 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $669,252

County: Island   |   Legislative District: 10   |   Project Length: 0.61   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency OAK HARBOR
Funding Year 2027
Program APP
Current Phase Design
Legislative District 10
Congressional District 2
Federal Route Number 7766
Project Length 0.61 mi.
ADT 7,000
Functional Class Collector
Type of Work Resurfacing
Project Contact Phillip Esqueda
Contact Email pesqueda@oakharbor.org
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2026 12/04/2025
Bid Auth. Approval 07/01/2026
Construction Approval 07/31/2026
Project Closeout 11/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 669,252 875,886
Other Construction 0 0
Total Construction 669,252 875,886
     
Total TIB Funding 669,252 875,886

Local Funding Partners

Funding Amount Percent
OAK HARBOR 206,634 23.6%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 206,634 23.6%

Project Description

2 inch grind and overlay

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments