The City has received an award of $900,000 from the Multimodal Transportation Account (State Appropriation-HSIP) to improve traffic safety conditions at five intersections on Main Street and Spruce Street. These intersection improvements were identified as priorities in the City's 2024 Local Road Safety Plan and Subsequent Safety Action Plan. The state Multimodal Transportation Account is funding the majority of the cost of the intersection improvements, but two of the four street segments between the intersection improvements also need to be improved. The segment on Main Street between Broadway and Spruce needs upgrades to the old and deteriorating pavement as well as replacement of the majority of the sidewalks to meet current standards. The segment on Spruce between Main and 1st needs upgrades to the pavement surface and minor sidewalk improvements at driveways. Most of the Storm drain inlets are the older style that are a hazard to bicycles.
Projects — TIB Project Information
TIB Project Information
City of Montesano's Spruce Avenue and Main Street Improvements
6-W-957(013)-1
6-W-957(013)-1
Spruce Avenue and Main Street Improvements
Main Street and Spruce Avenue
FY 2027 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $520,215
County: Grays Harbor | Legislative District: 24 | Project Length: 0.25 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | MONTESANO |
| Funding Year | 2027 |
| Program | SCAP |
| Current Phase | Construction |
| Legislative District | 24 |
| Congressional District | 6 |
| Federal Route Number | 9999 |
| Project Length | 0.25 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Reconstruction |
| Project Contact | MIke Olden PE |
| Contact Email | molden@montesano.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | 09/24/2025 | |
| Predesign Approval | ||
| Design Approval | 01/02/2026 | 01/27/2026 |
| Bid Auth. Approval | 03/15/2026 | 03/09/2026 |
| Construction Approval | 04/14/2026 | 04/17/2026 |
| Project Closeout | 10/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 600,000 | 1,387,240 |
| Other Construction | 0 | 0 |
| Total Construction | 600,000 | 1,387,240 |
| Funding Surplus | - 79,785 | |
| Total TIB Funding | 520,215 | 1,387,240 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| MONTESANO | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| HSIP State Allocation | 867,025 | 62.5% |
| Total Local Funding | 867,025 | 62.5% |
Project Description
Install various treatments including all-way stop control, curb extensions, median refuge islands, and pedestrian crosswalk improvements at the five intersections as funded by the Multimodal Transportation Account. Partner with the Transportation Improvement Board (TIB) to complete pavement and sidewalk upgrades on two segments between the intersection work by grinding and overlaying existing pavement. Utilize TIB funds to upgrade the sidewalks between Broadway and Spruce on Main Street to replace deteriorating concrete and meet current ADA standards.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||