TIB Project Information

City of Montesano's Spruce Avenue and Main Street Improvements

6-W-957(013)-1

6-W-957(013)-1
Spruce Avenue and Main Street Improvements

Main Street and Spruce Avenue

FY 2027 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $520,215

County: Grays Harbor   |   Legislative District: 24   |   Project Length: 0.25   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency MONTESANO
Funding Year 2027
Program SCAP
Current Phase Construction
Legislative District 24
Congressional District 6
Federal Route Number 9999
Project Length 0.25 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact MIke Olden PE
Contact Email molden@montesano.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 01/01/2027  
DAHP Assessment Date   09/24/2025
Predesign Approval
Design Approval 01/02/2026 01/27/2026
Bid Auth. Approval 03/15/2026 03/09/2026
Construction Approval 04/14/2026 04/17/2026
Project Closeout 10/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 600,000 1,387,240
Other Construction 0 0
Total Construction 600,000 1,387,240
     
Funding Surplus - 79,785  
Total TIB Funding 520,215 1,387,240

Local Funding Partners

Funding Amount Percent
MONTESANO 0 0.0%
WSDOT Funding 0 0.0%
HSIP State Allocation  867,025 62.5%
 
 
 
 
 
 
 
Total Local Funding 867,025 62.5%

Project Description

Install various treatments including all-way stop control, curb extensions, median refuge islands, and pedestrian crosswalk improvements at the five intersections as funded by the Multimodal Transportation Account. Partner with the Transportation Improvement Board (TIB) to complete pavement and sidewalk upgrades on two segments between the intersection work by grinding and overlaying existing pavement. Utilize TIB funds to upgrade the sidewalks between Broadway and Spruce on Main Street to replace deteriorating concrete and meet current ADA standards.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.