The current condition of the roads in town are in fair to poor condition with a cracking project that was down in 2023, and gravel roads that need BST.
Projects — TIB Project Information
TIB Project Information
City of Kahlotus's 2025 Chip Seal Project
2-E-927(005)-1
2-E-927(005)-1
2025 Chip Seal Project
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $303,500
County: Franklin | Legislative District: 16 | Project Length: 1.10 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
| Lead Agency | KAHLOTUS |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Design |
| Legislative District | 16 |
| Congressional District | 5 |
| Federal Route Number | 9999 |
| Project Length | 1.10 mi. |
| ADT | 660 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Kelli Seibert |
| Contact Email | cityofkahlotus@hotmail.com |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/01/2026 | 12/01/2025 |
| Bid Auth. Approval | 05/01/2026 | |
| Construction Approval | 06/01/2026 | |
| Project Closeout | 10/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 28,000 | 28,000 |
| Right of Way | 0 | 0 |
| Total Design | 28,000 | 28,000 |
| Construction Engineering | 28,000 | 28,000 |
| Construction Contract | 247,500 | 247,500 |
| Other Construction | 0 | 0 |
| Total Construction | 275,500 | 275,500 |
| Total TIB Funding | 303,500 | 303,500 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| KAHLOTUS | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Chip seal paved roads and double chip seal gravel streets to create more paved surface.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||