The project will enhance pedestrian safety measures at various uncontrolled intersections that are part of school routes and other high-volume crossings.
Projects — TIB Project Information
TIB Project Information
City of Camas's Camas Pedestrian Crossing Improvements
C-W-185(002)-1
C-W-185(002)-1
Camas Pedestrian Crossing Improvements
Multiple Locations
FY 2027 Complete Streets Program
Current Phase : Design
Total TIB Funding : $399,280
County: Clark | Legislative District: 17 | Project Length: 0.05 | TIB Engineer: Chris Langhoff | Last Payment Date: 04/29/2026
Project Information
| Lead Agency | CAMAS |
| Funding Year | 2027 |
| Program | CSP |
| Current Phase | Design |
| Legislative District | 17 |
| Congressional District | 3 |
| Federal Route Number | 0500 |
| Project Length | 0.05 mi. |
| ADT | 13,000 |
| Functional Class | Principal |
| Type of Work | Pedestrian |
| Project Contact | Chris Lopez |
| Contact Email | clopez@cityofcamas.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 04/29/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 12/10/2025 |
| Bid Auth. Approval | 04/15/2026 | |
| Construction Approval | 05/15/2026 | |
| Project Closeout | 12/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 16,000 | 20,000 |
| Right of Way | 0 | 0 |
| Total Design | 16,000 | 20,000 |
| Construction Engineering | 31,940 | 39,925 |
| Construction Contract | 351,340 | 439,175 |
| Other Construction | 0 | 0 |
| Total Construction | 383,280 | 479,100 |
| Total TIB Funding | 399,280 | 499,100 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| CAMAS | 99,820 | 20.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 99,820 | 20.0% |
Project Description
This project will construct concrete sidewalks, curb ramps, and will add illuminated RRFBs. These improvements will better define and safeguard the pedestrian path-of-travel.
Existing Condition
Project Benefits
- This project will enhance pedestrian safety measures by upgrading existing curb ramps and constructing new curb ramps to complete pedestrian routes, installing two (2) solar powered Rectangular Rapid Flashing Beacons (RRFB) each per pedestrian crossing. Intersections to be improved are NE 15th Ave and NE Everett St, NE 43rd Ave and NE Hayes, NE Fargo St and NW 27th Ave, NW Lacamas Ln and NW Lake Rd, and NW 6th Ave and NW Norwood. The RRFBs will be operated by push-button and pedestrian lighting will provide illumination across the entire crosswalk. In addition to curb ramps and illuminated RRFBs, the intersection of NW Lake Rd and NW Lacamas Rd. will get a pedestrian refuge island. The island will be constructed within the turning lane of NW Lake Rd and will have a concrete curb. In addition to encouraging the slowing of motorists, the calming islands will shorten the length of the crosswalk, increase visibility of pedestrians, and provide a shielded waiting area.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||