Paver is proposed along City streets with curb/gutter/sidewalk.
Projects — TIB Project Information
TIB Project Information
City of Burlington's 2026 Overlay
3-W-159(012)-1
3-W-159(012)-1
2026 Overlay
Multiple Locations
FY 2027 Arterial Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $751,924
County: Skagit | Legislative District: 40 | Project Length: 1.23 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | BURLINGTON |
| Funding Year | 2027 |
| Program | APP |
| Current Phase | Bid Authorization |
| Legislative District | 40 |
| Congressional District | 2 |
| Federal Route Number | 7325 |
| Project Length | 1.23 mi. |
| ADT | 10,000 |
| Functional Class | Collector |
| Type of Work | Resurfacing |
| Project Contact | Brian Dempsey |
| Contact Email | briand@burlingtonwa.gov |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 01/06/2026 |
| Bid Auth. Approval | 04/01/2026 | 03/31/2026 |
| Construction Approval | 06/01/2026 | |
| Project Closeout | 09/01/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 32,692 | 36,325 |
| Right of Way | 0 | 0 |
| Total Design | 32,692 | 36,325 |
| Construction Engineering | 32,692 | 36,325 |
| Construction Contract | 686,540 | 762,825 |
| Other Construction | 0 | 0 |
| Total Construction | 719,232 | 799,150 |
| Total TIB Funding | 751,924 | 835,475 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| BURLINGTON | 83,551 | 10.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 83,551 | 10.0% |
Project Description
2 inch grind and overlay
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||