City of Burlington's 2026 Overlay

3-W-159(012)-1

3-W-159(012)-1
2026 Overlay

Multiple Locations

FY 2027 Arterial Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $751,924

County: Skagit   |   Legislative District: 40   |   Project Length: 1.23   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency BURLINGTON
Funding Year 2027
Program APP
Current Phase Bid Authorization
Legislative District 40
Congressional District 2
Federal Route Number 7325
Project Length 1.23 mi.
ADT 10,000
Functional Class Collector
Type of Work Resurfacing
Project Contact Brian Dempsey
Contact Email briand@burlingtonwa.gov
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2026 01/06/2026
Bid Auth. Approval 04/01/2026 03/31/2026
Construction Approval 06/01/2026
Project Closeout 09/01/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 32,692 36,325
Right of Way 0 0
Total Design 32,692 36,325
     
Construction Engineering 32,692 36,325
Construction Contract 686,540 762,825
Other Construction 0 0
Total Construction 719,232 799,150
     
Total TIB Funding 751,924 835,475

Local Funding Partners

Funding Amount Percent
BURLINGTON 83,551 10.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 83,551 10.0%

Project Description

2 inch grind and overlay

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.