Ocean Beach Boulevard (OBB) is the alternate pedestrian route to SR 103 and has pedestrians walking on the existing narrow roadway. This is in part due to the residential developments along OBB, but is also due to OBB connecting the after-school program building on Pioneer Rd to 26th St. NW (leading to the Discovery Trail) and because walking on OBB allows pedestrians to avoid walking along the state highway.
Projects — TIB Project Information
TIB Project Information
City of Long Beach's Ocean Beach Blvd
6-W-970(006)-1
6-W-970(006)-1
Ocean Beach Blvd
Pioneer Rd W to 26th St NW
FY 2026 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $625,000
County: Pacific | Legislative District: 19 | Project Length: 0.23 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | LONG BEACH |
| Funding Year | 2026 |
| Program | SCAP |
| Current Phase | Construction |
| Legislative District | 19 |
| Congressional District | 3 |
| Federal Route Number | 9999 |
| Project Length | 0.23 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Reconstruction |
| Project Contact | Ariel Smith |
| Contact Email | asmith@longbeachwa.gov |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2024 | |
| Delayed Project Date | 01/01/2026 | |
| DAHP Assessment Date | 04/30/2025 | |
| Predesign Approval | ||
| Design Approval | 12/01/2024 | 12/04/2024 |
| Bid Auth. Approval | 05/15/2025 | 05/13/2025 |
| Construction Approval | 06/11/2025 | 08/14/2025 |
| Project Closeout | 11/15/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 65,217 | 113,739 |
| Construction Contract | 434,783 | 1,144,600 |
| Other Construction | 0 | 0 |
| Total Construction | 500,000 | 1,258,339 |
| Funding Increase | 125,000 | |
| Total TIB Funding | 625,000 | 1,258,339 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| LONG BEACH | 633,339 | 50.3% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 633,339 | 50.3% |
Project Description
Install curb and sidewalk on OBB from Pioneer Road to 26th St NW to protect pedestrians.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||