 Projects — TIB Project Information

TIB Project Information

Town of Waterville's N Chelan Ave Reconstruction

6-E-854(005)-1

6-E-854(005)-1
N Chelan Ave Reconstruction

Poplar St to 3rd St

FY 2027 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $125,053

County: Douglas   |   Legislative District: 7   |   Project Length: 0.19   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 04/30/2026

Project Information

Lead Agency WATERVILLE
Funding Year 2027
Program SCAP
Current Phase Construction
Legislative District 7
Congressional District 4
Federal Route Number A090
Project Length 0.19 mi.
ADT 1,600
Functional Class Collector
Type of Work Reconstruction
Project Contact Marsha Peterson
Contact Email waterville@nwi.net
TIB Engineer Andrew Beagle
Last Payment Date 04/30/2026
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date   12/15/2025
Predesign Approval
Design Approval 01/01/2026 12/02/2025
Bid Auth. Approval 01/15/2026 02/10/2026
Construction Approval 02/25/2026 04/02/2026
Project Closeout 10/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 15,767 55,000
Right of Way 0 0
Total Design 15,767 55,000
     
Construction Engineering 14,333 50,000
Construction Contract 130,650 335,558
Other Construction 0 0
Total Construction 144,983 385,558
     
Funding Surplus - 35,697  
Total TIB Funding 125,053 440,558

Local Funding Partners

Funding Amount Percent
WATERVILLE 0 0.0%
WSDOT Funding 0 0.0%
Douglas County Grant  315,505 71.6%
 
 
 
 
 
 
 
Total Local Funding 315,505 71.6%

Project Description

The proposed improvements to N Chelan Avenue from Poplar to 3rd Street are to reconstruct the existing 4 feet of pavement on the edge of the existing roadway. An additional 2 feet will be added to provide a full 6 feet of reconstruction on each side, widening the roadway. In addition, the shoulder will be reconstructed and graded with gravel for a smooth, safe and wider shoulder. A new HMA layer will also be added to finish the roadway to improve the surface. The pre-leveling will be used to prepare the existing grade to create the appropriate surface for overlay.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.