The Town has faded pedestrian crossings and road striping due to wear and weather related deterioration. The Town is located along State Route 155. The Town is situated so that drivers rarely slow to the posted speed limits. There is one crossing that is located just north of a horizontal curve, making it difficult to see for northbound drivers.
Projects — TIB Project Information
TIB Project Information
Town of Elmer City's Speed Feedback Signs and Striping
P-E-879(P03)-1
P-E-879(P03)-1
Speed Feedback Signs and Striping
Multiple Locations
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $134,800
County: Okanogan | Legislative District: 7 | Project Length: 0.95 | TIB Engineer: Andrew Beagle | Last Payment Date: 04/17/2026
Project Information
| Lead Agency | ELMER CITY |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 7 |
| Congressional District | 4 |
| Federal Route Number | 0155 |
| Project Length | 0.95 mi. |
| ADT | 2,000 |
| Functional Class | Minor |
| Type of Work | Pedestrian |
| Project Contact | Jim Tillman |
| Contact Email | elmermaint@gmail.com |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | 04/17/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 12/16/2025 |
| Bid Auth. Approval | 05/01/2026 | |
| Construction Approval | 06/30/2026 | |
| Project Closeout | 12/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 15,500 | 15,500 |
| Right of Way | 0 | 0 |
| Total Design | 15,500 | 15,500 |
| Construction Engineering | 15,500 | 15,500 |
| Construction Contract | 103,800 | 103,800 |
| Other Construction | 0 | 0 |
| Total Construction | 119,300 | 119,300 |
| Total TIB Funding | 134,800 | 134,800 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ELMER CITY | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Install two (2) Speed Feedback signs at the northerly and southerly entrances to town on SR 155, and re-stripe pedestrian crossings, stop lines, and lane lines throughout the City.
Existing Condition
Project Benefits
- Pedestrian safety.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||