Currently, there are no sidewalks on the east side of George Washington Way between Comstock Street and Bradley Boulevard.
Projects — TIB Project Information
TIB Project Information
City of Richland's George Washington Way Sidewalk
P-E-171(P07)-1
P-E-171(P07)-1
George Washington Way Sidewalk
Comstock St to Bradley Blvd
FY 2026 Active Transportation Program
Current Phase : Design
Total TIB Funding : $850,000
County: Benton | Legislative District: 8 | Project Length: 1,411.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 03/12/2026
Project Information
| Lead Agency | RICHLAND |
| Funding Year | 2026 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 8 |
| Congressional District | 4 |
| Federal Route Number | 3475 |
| Project Length | 1411.00 mi. |
| ADT | 40,616 |
| Functional Class | Principal |
| Type of Work | Pedestrian |
| Project Contact | Carlo DAlessandro |
| Contact Email | Cdalessandro@ci.richland.wa.us |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | 03/12/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2024 | |
| Delayed Project Date | 07/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 08/04/2025 | 03/28/2025 |
| Bid Auth. Approval | 08/31/2026 | |
| Construction Approval | 09/30/2026 | |
| Project Closeout | 12/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 113,333 | 141,666 |
| Right of Way | 0 | 0 |
| Total Design | 113,333 | 141,666 |
| Construction Engineering | 28,334 | 35,418 |
| Construction Contract | 708,333 | 885,416 |
| Other Construction | 0 | 0 |
| Total Construction | 736,667 | 920,834 |
| Total TIB Funding | 850,000 | 1,062,500 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| RICHLAND | 212,500 | 100.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 212,500 | 0.0% |
Project Description
The proposed project installs an 8-foot-wide sidewalk that will integrate with ADA facilities at Comstock Street and Bradley Boulevard.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Supports economic development;
- Completes gap
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||