Minor to moderate longitudinal and transverse pavement cracks are forming in several of the existing paved street. Minor potholes are forming in some of the BST surfaced streets.
Projects — TIB Project Information
TIB Project Information
Town of Reardan's 2026 Street Maintenance
2-E-873(008)-1
2-E-873(008)-1
2026 Street Maintenance
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $18,143
County: Lincoln | Legislative District: 9 | Project Length: 0.10 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
| Lead Agency | REARDAN |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Construction |
| Legislative District | 9 |
| Congressional District | 5 |
| Federal Route Number | 9999 |
| Project Length | 0.10 mi. |
| ADT | 200 |
| Functional Class | TIB Arterial |
| Type of Work | |
| Project Contact | Celeste Lewis |
| Contact Email | clerk@townofreardan.com |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 01/23/2026 |
| Bid Auth. Approval | 04/15/2026 | 04/28/2026 |
| Construction Approval | 07/01/2026 | 04/28/2026 |
| Project Closeout | 10/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 18,143 | 18,143 |
| Other Construction | 0 | 0 |
| Total Construction | 18,143 | 18,143 |
| Total TIB Funding | 18,143 | 18,143 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| REARDAN | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Crack seal existing paved street segments identified in application. Pothole repairs and spot applications of BST surfacing shall be applied.
Existing Condition
Project Benefits
- Extend asset life.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||