The City of Black Diamond has sidewalk on the east side of SR 169. The east side of SR 169 is almost completely residential, while many businesses and the Black Diamond Elementary School is located on the west side of the highway. There is only one crosswalk on SR 169 at Baker Street. The City has just recently finished building a new skatepark at Park Street and SR 169. A crosswalk at Park Street would add extra connectivity for the residents on the east side of the street to walk to the downtown area, school, and recreational facilities.
Projects — TIB Project Information
TIB Project Information
City of Black Diamond's SR 169 Pedestrian Crossing
P-P-800(P06)-1
P-P-800(P06)-1
SR 169 Pedestrian Crossing
Park Street
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $273,491
County: King | Legislative District: 5 | Project Length: 105.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | BLACK DIAMOND |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 5 |
| Congressional District | 8 |
| Federal Route Number | 0169 |
| Project Length | 105.00 mi. |
| ADT | 12,236 |
| Functional Class | Principal |
| Type of Work | Pedestrian |
| Project Contact | Ryan Sweet |
| Contact Email | rsweet@blackdiamondwa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/09/2026 | 01/13/2026 |
| Bid Auth. Approval | 06/15/2026 | |
| Construction Approval | 06/30/2026 | |
| Project Closeout | 11/21/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 63,113 | 74,943 |
| Right of Way | 0 | 0 |
| Total Design | 63,113 | 74,943 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 201,957 | 239,811 |
| Other Construction | 8,421 | 10,000 |
| Total Construction | 210,378 | 249,811 |
| Total TIB Funding | 273,491 | 324,754 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| BLACK DIAMOND | 51,263 | 15.8% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 51,263 | 15.8% |
Project Description
Add a highly visible crosswalk with RRFB along the SR 169 corridor. Park Street is a prime location as it would provide access to parks, another crossing spot to access the elementary school, and path to the downtown area.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||