The existing roadway has one lane in each direction, a center turn lane and bike lanes. Periodic crack sealing and one surface seal have taken place since the original construction.
Projects — TIB Project Information
TIB Project Information
City of West Richland's 2026 Overlay
3-E-172(007)-1
3-E-172(007)-1
2026 Overlay
Keene Rd to Blue Heron Blvd
FY 2027 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $674,500
County: Benton | Legislative District: 8 | Project Length: 1.22 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
| Lead Agency | WEST RICHLAND |
| Funding Year | 2027 |
| Program | APP |
| Current Phase | Design |
| Legislative District | 8 |
| Congressional District | 4 |
| Federal Route Number | 3431 |
| Project Length | 1.22 mi. |
| ADT | 12,434 |
| Functional Class | Principal |
| Type of Work | Resurfacing |
| Project Contact | Julie West |
| Contact Email | jwest@westrichland.org |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 07/01/2026 | 12/18/2025 |
| Bid Auth. Approval | 02/08/2027 | |
| Construction Approval | 03/02/2027 | |
| Project Closeout | 10/04/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 35,417 | 50,000 |
| Right of Way | 0 | 0 |
| Total Design | 35,417 | 50,000 |
| Construction Engineering | 42,500 | 60,000 |
| Construction Contract | 596,583 | 840,000 |
| Other Construction | 0 | 0 |
| Total Construction | 639,083 | 900,000 |
| Total TIB Funding | 674,500 | 950,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| WEST RICHLAND | 275,500 | 29.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 275,500 | 29.0% |
Project Description
Grinding 1 inch of existing asphalt and overlaying with 2 inches of asphalt.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||