Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Ridgefield's S. Royle Road

8-5-950(003)-1

8-5-950(003)-1
S. Royle Road

Hillhurst Rd to Royle Ct

FY 2027 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $3,500,000

County: Clark   |   Legislative District: 20   |   Project Length: 0.34   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency RIDGEFIELD
Funding Year 2027
Program UAP
Current Phase Design
Legislative District 20
Congressional District 3
Federal Route Number 9131
Project Length 0.34 mi.
ADT 8,750
Functional Class Collector
Type of Work Reconstruction
Project Contact Kristen Lashua
Contact Email grants@ridgefieldwa.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2030  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2026 12/10/2025
Bid Auth. Approval 03/30/2027
Construction Approval 05/30/2027
Project Closeout 10/31/2027
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 190,909 300,000
Right of Way 63,636 100,000
Total Design 254,545 400,000
     
Construction Engineering 426,364 670,000
Construction Contract 2,819,091 4,430,000
Other Construction 0 0
Total Construction 3,245,455 5,100,000
     
Total TIB Funding 3,500,000 5,500,000

Local Funding Partners

Funding Amount Percent
RIDGEFIELD 2,000,000 100.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 2,000,000 0.0%

Project Description

This proposed phase will complete the sidewalks from the Royle View and Royle Terrace neighborhoods to Ridgefield High School, while also completing the connection to the shared use path along the north side of Hillhurst. Additionally, there is currently no stormwater infrastructure along the roadway. The proposed utility improvements include waterline extension, stormwater conveyance, stormwater quality and quantity control, and the undergrounding of overhead utilities. The stormwater will be collected and conveyed to an underground treatment vault, detained with an underground pipe, and discharged to meet flow control requirements. This project will significantly improve physical road conditions and safety in Ridgefield.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments