S. Royle Road, south of S. 19th St., is a 20-foot-wide minor arterial that is the only north-south corridor in the City of Ridgefield. Despite its importance, it is currently in very poor condition. It connects many residents to the city's only high school, its only middle school, and the Ridgefield Outdoor Recreation Complex. It also connects a significant portion of the city's residents to Ridgefield's only supermarket and the city's main commercial node. This critical segment of Royle Road currently lacks sidewalks on both sides, which forces residents, many of whom are K-12 students, to walk in the roadside ditch to nearby schools and the community sports complex.
Projects — TIB Project Information
TIB Project Information
City of Ridgefield's S. Royle Road
8-5-950(003)-1
8-5-950(003)-1
S. Royle Road
Hillhurst Rd to Royle Ct
FY 2027 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $3,500,000
County: Clark | Legislative District: 20 | Project Length: 0.34 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | RIDGEFIELD |
| Funding Year | 2027 |
| Program | UAP |
| Current Phase | Design |
| Legislative District | 20 |
| Congressional District | 3 |
| Federal Route Number | 9131 |
| Project Length | 0.34 mi. |
| ADT | 8,750 |
| Functional Class | Collector |
| Type of Work | Reconstruction |
| Project Contact | Kristen Lashua |
| Contact Email | grants@ridgefieldwa.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2030 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 12/10/2025 |
| Bid Auth. Approval | 03/30/2027 | |
| Construction Approval | 05/30/2027 | |
| Project Closeout | 10/31/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 190,909 | 300,000 |
| Right of Way | 63,636 | 100,000 |
| Total Design | 254,545 | 400,000 |
| Construction Engineering | 426,364 | 670,000 |
| Construction Contract | 2,819,091 | 4,430,000 |
| Other Construction | 0 | 0 |
| Total Construction | 3,245,455 | 5,100,000 |
| Total TIB Funding | 3,500,000 | 5,500,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| RIDGEFIELD | 2,000,000 | 100.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 2,000,000 | 0.0% |
Project Description
This proposed phase will complete the sidewalks from the Royle View and Royle Terrace neighborhoods to Ridgefield High School, while also completing the connection to the shared use path along the north side of Hillhurst. Additionally, there is currently no stormwater infrastructure along the roadway. The proposed utility improvements include waterline extension, stormwater conveyance, stormwater quality and quantity control, and the undergrounding of overhead utilities. The stormwater will be collected and conveyed to an underground treatment vault, detained with an underground pipe, and discharged to meet flow control requirements. This project will significantly improve physical road conditions and safety in Ridgefield.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||