Aero Road serves as a primary access route for multiple neighborhoods situated south of Interstate 90 on the West Plains. This road is utilized by residents of the neighborhoods and light industrial operations, including freight traffic.
Projects — TIB Project Information
TIB Project Information
Spokane County's Aero Road Sidewalk Infill
P-E-032(P10)-1
P-E-032(P10)-1
Aero Road Sidewalk Infill
Dior Vicinity to Noah Vicinity
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $368,000
County: Spokane | Legislative District: 6 | Project Length: 813.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
| Lead Agency | SPOKANE COUNTY |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 6 |
| Congressional District | 5 |
| Federal Route Number | 3778 |
| Project Length | 813.00 mi. |
| ADT | 5,144 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Barry Greene |
| Contact Email | bgreene@spokanecounty.org |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 03/01/2026 | 01/22/2026 |
| Bid Auth. Approval | 05/01/2027 | |
| Construction Approval | 06/01/2027 | |
| Project Closeout | 10/01/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 39,198 | 85,000 |
| Right of Way | 0 | 0 |
| Total Design | 39,198 | 85,000 |
| Construction Engineering | 39,198 | 85,000 |
| Construction Contract | 289,604 | 628,000 |
| Other Construction | 0 | 0 |
| Total Construction | 328,802 | 713,000 |
| Total TIB Funding | 368,000 | 798,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| SPOKANE COUNTY | 100,000 | 12.5% |
| WSDOT Funding | 0 | 0.0% |
| Spokane County Stormwater Utility | 330,000 | 41.4% |
| Total Local Funding | 430,000 | 53.9% |
Project Description
Separated sidewalk infill on Aero Road.
Existing Condition
Project Benefits
- Pedestrian mobility and safety.