West Main Street is a main pedestrian corridor connecting to the City of Elma Middle and High Schools. Many of the curb ramps along West Main Street, between 12th Street and 14th Street are not ADA compliant and are missing crosswalks. There is a need to improve safety along this section.
Projects — TIB Project Information
TIB Project Information
City of Elma's W Main Street ADA
P-W-955(P09)-1
P-W-955(P09)-1
W Main Street ADA
12th St to 14th St
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $369,265
County: Grays Harbor | Legislative District: 24 | Project Length: 785.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | ELMA |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 24 |
| Congressional District | 6 |
| Federal Route Number | 5198 |
| Project Length | 785.00 mi. |
| ADT | 1,000 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Rick Eaton |
| Contact Email | pwdirector@cityofelma.com |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/06/2026 | 01/08/2026 |
| Bid Auth. Approval | 04/20/2026 | |
| Construction Approval | 05/25/2026 | |
| Project Closeout | 08/07/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 42,608 | 44,850 |
| Right of Way | 0 | 0 |
| Total Design | 42,608 | 44,850 |
| Construction Engineering | 42,608 | 44,850 |
| Construction Contract | 284,049 | 299,000 |
| Other Construction | 0 | 0 |
| Total Construction | 326,657 | 343,850 |
| Total TIB Funding | 369,265 | 388,700 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ELMA | 19,435 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 19,435 | 5.0% |
Project Description
Pedestrian safety along West Main Street can be improved by removing and reinstalling existing curb ramps to current ADA standards and installing crosswalks between 12th Street and 14th Street.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||