City of Wenatchee's Red Apple Road

8-3-160(033)-1

8-3-160(033)-1
Red Apple Road

Vista Pl to Miller St

FY 2024 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,830,292

County: Chelan   |   Legislative District: 12   |   Project Length: 0.35   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 02/13/2026

Project Information

Lead Agency WENATCHEE
Funding Year 2024
Program UAP
Current Phase Construction
Legislative District 12
Congressional District 8
Federal Route Number 5806
Project Length 0.35 mi.
ADT 1,750
Functional Class Collector
Type of Work Reconstruction
Project Contact Charlotte Mitchell
Contact Email cmitchell@wenatcheewa.gov
TIB Engineer Andrew Beagle
Last Payment Date 02/13/2026
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2027  
DAHP Assessment Date   01/30/2026
Predesign Approval
Design Approval 02/01/2023 01/17/2023
Bid Auth. Approval 01/25/2026 03/04/2026
Construction Approval 04/02/2026 04/13/2026
Project Closeout 11/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 198,096 416,421
Right of Way 268,440 292,885
Total Design 466,536 709,306
     
Construction Engineering 132,064 221,300
Construction Contract 1,320,628 1,534,600
Other Construction 0 0
Total Construction 1,452,692 1,755,900
     
Funding Surplus - 88,936  
Total TIB Funding 1,830,292 2,465,206

Local Funding Partners

Funding Amount Percent
WENATCHEE 622,614 25.3%
WSDOT Funding 0 0.0%
Property Owner 1061 Red Apple Rd  0 0.0%
Property Owner 1205 Red Apple Rd  12,300 0.5%
 
 
 
 
 
 
Total Local Funding 634,914 25.8%

Project Description

Reconfigure street with parallel parking, bike lanes and sidewalk on both sides of the street. A midblock crossing will be placed near multifamily housing access point, and the illumination system will be upgraded to provide adequate lighting levels throughout the corridor. The development under construction is constructing half street improvements as shown in the typical sections. HMA overlay of the existing roadway to tie the new widening and to preserve existing asset where possible.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments