There is an existing gap in sidewalk between 154th Street and 15000 block along the east side of 179th Avenue. This is a commonly used pedestrian travel way as it accesses the Evergreen Health Center to the north and Park Place Middle School to the South.
Projects — TIB Project Information
TIB Project Information
City of Monroe's 179th Ave Sidewalk
P-P-822(P06)-1
P-P-822(P06)-1
179th Ave Sidewalk
154th St to 15000 block
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $684,200
County: Snohomish | Legislative District: 12 | Project Length: 1,320.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | MONROE |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 12 |
| Congressional District | 1 |
| Federal Route Number | 2673 |
| Project Length | 1320.00 mi. |
| ADT | 5,000 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Derek Hann |
| Contact Email | dhann@monroewa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/15/2026 | 01/20/2026 |
| Bid Auth. Approval | 12/31/2027 | |
| Construction Approval | 03/01/2028 | |
| Project Closeout | 12/31/2028 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 62,400 | 78,000 |
| Right of Way | 0 | 0 |
| Total Design | 62,400 | 78,000 |
| Construction Engineering | 7,840 | 9,800 |
| Construction Contract | 613,960 | 767,450 |
| Other Construction | 0 | 0 |
| Total Construction | 621,800 | 777,250 |
| Total TIB Funding | 684,200 | 855,250 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| MONROE | 171,050 | 20.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 171,050 | 20.0% |
Project Description
Approximately 950 linear feet of sidewalk, planter strip, curb and gutter and bike lane striping will close the gap. This work will also require the construction of a stormwater system that will include approximately nine catchbasins, two water quality treatment units and underground infiltration galleries to mitigate stormwater runoff.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||