TIB Project Information

City of Monroe's 179th Ave Sidewalk

P-P-822(P06)-1

P-P-822(P06)-1
179th Ave Sidewalk

154th St to 15000 block

FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $684,200

County: Snohomish   |   Legislative District: 12   |   Project Length: 1,320.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency MONROE
Funding Year 2027
Program ATP
Current Phase Design
Legislative District 12
Congressional District 1
Federal Route Number 2673
Project Length 1320.00 mi.
ADT 5,000
Functional Class Collector
Type of Work Pedestrian
Project Contact Derek Hann
Contact Email dhann@monroewa.gov
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/15/2026 01/20/2026
Bid Auth. Approval 12/31/2027
Construction Approval 03/01/2028
Project Closeout 12/31/2028
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 62,400 78,000
Right of Way 0 0
Total Design 62,400 78,000
     
Construction Engineering 7,840 9,800
Construction Contract 613,960 767,450
Other Construction 0 0
Total Construction 621,800 777,250
     
Total TIB Funding 684,200 855,250

Local Funding Partners

Funding Amount Percent
MONROE 171,050 20.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 171,050 20.0%

Project Description

Approximately 950 linear feet of sidewalk, planter strip, curb and gutter and bike lane striping will close the gap. This work will also require the construction of a stormwater system that will include approximately nine catchbasins, two water quality treatment units and underground infiltration galleries to mitigate stormwater runoff.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.