The proposed overlays currently have a PCR ranging from 45-54. These surfaces show significant wear, including alligator cracking, potholes, and deteriorated edges. In addition to the pavement issues, several segments require ADA upgrades, as existing facilities do not meet current standards. These roads play an important role in getting around Eatonvillethey connect to key places like the airport and a major parkso fixing them up will make a big difference for the whole community.
Projects — TIB Project Information
TIB Project Information
Town of Eatonville's 2027 Overlay
2-P-811(009)-1
2-P-811(009)-1
2027 Overlay
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $676,116
County: Pierce | Legislative District: 2 | Project Length: 0.40 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | EATONVILLE |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Design |
| Legislative District | 2 |
| Congressional District | 8 |
| Federal Route Number | 9999 |
| Project Length | 0.40 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Eric Phillips |
| Contact Email | townadmin@eatonville-wa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/03/2026 | 12/15/2025 |
| Bid Auth. Approval | 11/18/2026 | |
| Construction Approval | 02/01/2027 | |
| Project Closeout | 09/17/2027 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 67,614 | 71,173 |
| Right of Way | 0 | 0 |
| Total Design | 67,614 | 71,173 |
| Construction Engineering | 67,614 | 71,173 |
| Construction Contract | 540,888 | 569,356 |
| Other Construction | 0 | 0 |
| Total Construction | 608,502 | 640,529 |
| Total TIB Funding | 676,116 | 711,702 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| EATONVILLE | 35,586 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 35,586 | 5.0% |
Project Description
2-inch grind and overlay with pavement repair for the following segments Madison Avenue S - Center St E to Alder Street Ridge Road - Pennsylvania Ave to Orchard Ave Ridge Road - Maple Dr to Pennsylvania Ave
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||