Rhoton Road NW is a critical north-south connector in Yelm providing access to neighborhoods, schools, and the regional transportation network, including future integration with SR 510 Yelm Loop Phase 2. The corridor currently has narrow travel lanes, failing pavement, poor drainage, and inadequate shoulders. Utility infrastructure is undersized and nearing the end of its useful life. The lack of curb and gutter contributes to uncontrolled runoff, shoulder erosion, and accelerated pavement deterioration. These conditions create safety hazards for motorists, particularly during winter storms and peak school traffic. The corridor also lacks pedestrian facilities, limiting safe access between residential areas, civic services, and parks. Without reconstruction, these deficiencies will worsen and compromise the roadways ability to safely and efficiently connect to the regional highway system.
Projects — TIB Project Information
TIB Project Information
City of Yelm's Rhoton Road NW Reconstruction
8-5-978(004)-1
8-5-978(004)-1
Rhoton Road NW Reconstruction
Railway Rd SE to Yelm Loop Rd (SR 510)
FY 2027 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $3,179,750
County: Thurston | Legislative District: 2 | Project Length: 0.75 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | YELM |
| Funding Year | 2027 |
| Program | UAP |
| Current Phase | Design |
| Legislative District | 2 |
| Congressional District | 10 |
| Federal Route Number | 9055 |
| Project Length | 0.75 mi. |
| ADT | 5,410 |
| Functional Class | Collector |
| Type of Work | Reconstruction |
| Project Contact | Elizabeth Jones |
| Contact Email | ElizabethJ@yelmwa.gov |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2030 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 02/09/2026 |
| Bid Auth. Approval | 09/29/2027 | |
| Construction Approval | 11/23/2027 | |
| Project Closeout | 11/21/2028 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 379,747 | 1,052,935 |
| Right of Way | 60,022 | 200,000 |
| Total Design | 439,769 | 1,252,935 |
| Construction Engineering | 333,947 | 829,518 |
| Construction Contract | 2,406,034 | 5,751,323 |
| Other Construction | 0 | 0 |
| Total Construction | 2,739,981 | 6,580,841 |
| Total TIB Funding | 3,179,750 | 7,833,776 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| YELM | 2,065,161 | 26.4% |
| WSDOT Funding | 0 | 0.0% |
| TRPC- STBG TA | 850,000 | 10.9% |
| TRPC STBG TA CRP | 1,738,865 | 22.2% |
| Total Local Funding | 4,654,026 | 59.5% |
Project Description
The City of Yelm proposes a full reconstruction and minor widening of approximately 3,950 feet of Rhoton Road NW between Railway Rd SE and View Dr NW. Improvements include upgraded subgrade and base, new HMA pavement, curb and gutter, and replacement of aging stormwater, sewer, and water utilities. Drainage upgrades will control runoff and extend pavement life. The project also includes traffic control elements, permanent signage, and striping.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||