City of Royal City's 2026 Crack Seal

2-E-864(008)-1

2-E-864(008)-1
2026 Crack Seal

Multiple Locations

FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $98,000

County: Grant   |   Legislative District: 13   |   Project Length: 0.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency ROYAL CITY
Funding Year 2027
Program SCPP
Current Phase Design
Legislative District 13
Congressional District 4
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work
Project Contact Janice Flynn
Contact Email janice@royalcitywa.org
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 01/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2026 12/08/2025
Bid Auth. Approval 04/01/2026
Construction Approval 06/01/2026
Project Closeout 10/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 98,000 98,000
Other Construction 0 0
Total Construction 98,000 98,000
     
Total TIB Funding 98,000 98,000

Local Funding Partners

Funding Amount Percent
ROYAL CITY 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

City-wide crack seal.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.