The existing roadway conditions of the multiple chip seal locations consist of delaminating and deterioration.
Projects — TIB Project Information
TIB Project Information
City of Cle Elum's 2026 Seal Coat
2-E-930(008)-1
2-E-930(008)-1
2026 Seal Coat
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $210,213
County: Kittitas | Legislative District: 13 | Project Length: 2.63 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
| Lead Agency | CLE ELUM |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Design |
| Legislative District | 13 |
| Congressional District | 8 |
| Federal Route Number | 9999 |
| Project Length | 2.63 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Mathew Bailey |
| Contact Email | mbailey@cleelum.gov |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/01/2026 | 12/11/2025 |
| Bid Auth. Approval | 04/16/2026 | |
| Construction Approval | 05/14/2026 | |
| Project Closeout | 11/06/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 11,700 | 13,000 |
| Construction Contract | 198,513 | 220,570 |
| Other Construction | 0 | 0 |
| Total Construction | 210,213 | 233,570 |
| Total TIB Funding | 210,213 | 233,570 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| CLE ELUM | 23,357 | 10.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 23,357 | 10.0% |
Project Description
Chip seal and sweeping throughout the City.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||