The Town of Ione is looking to improve pedestrian safety between the Central Business District and the City Park. Currently, there is a gap in pedestrian infrastructure between the City Park and the rest of the town. Existing sidewalk along Blackwell and First Streets are severely broken and a public safety hazard.
Projects — TIB Project Information
TIB Project Information
Town of Ione's First and Blackwell Sidewalk Improvements
P-E-889(P02)-1
P-E-889(P02)-1
First and Blackwell Sidewalk Improvements
First Ave and Blackwell St R/W
FY 2027 Active Transportation Program
Current Phase : Design
Total TIB Funding : $886,080
County: Pend Oreille | Legislative District: 7 | Project Length: 1,050.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
| Lead Agency | IONE |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Design |
| Legislative District | 7 |
| Congressional District | 5 |
| Federal Route Number | 9999 |
| Project Length | 1050.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Pedestrian |
| Project Contact | John Cannon |
| Contact Email | townclerk@potc.net |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | |
| Cultural Resource Assessment | Section 106 |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 03/23/2026 |
| Bid Auth. Approval | 04/01/2026 | |
| Construction Approval | 05/01/2026 | |
| Project Closeout | 10/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 147,680 | 147,680 |
| Construction Contract | 738,400 | 738,400 |
| Other Construction | 0 | 0 |
| Total Construction | 886,080 | 886,080 |
| Total TIB Funding | 886,080 | 886,080 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| IONE | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Add improved accessible crossing across Main St. Add sidewalks along both sides of Blackwell and First St. Improve and replace gravel streetside parking areas.
Existing Condition
Project Benefits
- Pedestrian mobility, safety and accessibility.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||