ABERDEEN Sumner Avenue (SR 101) Sidewalk Maple St to Williams St |
ATP | 2024 | Design | 450,000 | 1,141,775 | |
ABERDEEN US 101 Safety Improvements US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17 |
ATP | 2025 | Design | 450,000 | 2,205,000 | |
AIRWAY HEIGHTS 10th Avenue Extension 10th Ave terminus to Hayford Rd |
UAP | 2022 | Construction | 2,467,406 | 3,799,424 | |
AIRWAY HEIGHTS 6th Avenue Craig Rd to Russell St |
UAP | 2025 | Construction | 552,335 | 4,551,920 | |
ALBION 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 657,597 | 657,597 | |
ALGONA Ellingson Road Overlay Pacific Ave to UPRR |
SCPP | 2025 | Construction | 704,176 | 786,918 | |
ALMIRA School Vicinity Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 9,563 | 28,690 | |
ANACORTES Commercial Avenue (SR 20 Spur) 13th St to 11th St |
UAP | 2021 | Design | 950,000 | 3,525,442 | |
ANACORTES R Avenue Improvements 27th St to 34th St |
UAP | 2024 | Construction | 550,000 | 4,718,232 | |
ANACORTES Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 | |
ARLINGTON 211th Place SR 530 to 67th Ave NE |
UAP | 2024 | Construction | 2,645,000 | 4,755,968 | |
ASOTIN 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 72,821 | 76,654 | |
ASOTIN 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 77,457 | 81,534 | |
AUBURN Auburn Way S Widening Hemlock St to Poplar St |
UAP | 2025 | Design | 3,309,032 | 7,994,034 | |
AUBURN Regional Growth Center Improvements B St NE and 3rd St NE to Auburn Wy N and 4th St NE |
UAP | 2025 | Construction | 1,872,227 | 3,443,134 | |
BAINBRIDGE ISLAND Madison Ave Nonmotorized Improvements SR 305 to Winslow Way |
CSP | 2026 | Construction | 500,000 | 3,876,681 | |
BAINBRIDGE ISLAND NE Wyatt Way Eagle Harbor Dr NE |
ATP | 2025 | Design | 500,000 | 3,928,489 | |
BATTLE GROUND 2024 Eaton Boulevard Overlay Multiple Locations |
APP | 2025 | Construction | 336,974 | 426,217 | |
BATTLE GROUND SE Grace Avenue - Phase II NE 1st St to SE Rasmussen Blvd |
UAP | 2023 | Design | 3,000,000 | 6,310,056 | |
BEAUX ARTS VILLAGE 104th105th Pavement Preservation North Town limit to SE 30th |
SCPP | 2026 | Construction | 195,271 | 205,548 | |
BELLEVUE 150th Avenue SE 28th St to SE 38th St |
UAP | 2024 | Design | 3,990,000 | 10,966,587 | |
BELLEVUE 123rd Avenue SE pedestrian improvements SE 60th Street to Newcastle Way |
CSP | 2026 | Construction | 600,000 | 1,783,578 | |
BELLINGHAM Meridian St W Illinois St Roundabout |
UAP | 2022 | Construction | 575,000 | 1,105,689 | |
BELLINGHAM Lincoln St/E Maple Street Lincoln St to Consolidation Ave |
UAP | 2023 | Construction | 480,000 | 650,000 | |
BELLINGHAM 12th Street and Finnegan Way McKenzie St and 11th St |
UAP | 2024 | Bid Auth | 400,000 | 500,000 | |
BELLINGHAM Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 500,000 | 500,000 | |
BLAINE Boblett Street Yew Ave to Ludwick Ave |
UAP | 2022 | Construction | 1,161,862 | 3,614,644 | |
BONNEY LAKE LED Streetlight Conversion Citywide |
LED | 2025 | Construction | 157,500 | 157,500 | |
BOTHELL Meridian Avenue Roundabout 240th St Roundabout |
UAP | 2025 | Construction | 693,951 | 1,875,121 | |
BOTHELL 23rd Avenue SE RRFB 243rd Place SE Intersection |
CSP | 2026 | Construction | 81,211 | 116,595 | |
BREMERTON E 11th Street and Perry Avenue Pitt Avenue to E 17th Street |
UAP | 2020 | Construction | 4,341,916 | 7,287,140 | |
BREMERTON Washington Avenue / 11th Street Pacific Ave to Manette Bridge |
UAP | 2023 | Construction | 1,742,143 | 7,260,650 | |
BREWSTER 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 12,974 | 13,657 | |
BREWSTER Old Hwy 97 US 97 to North C/L |
SCAP | 2024 | Closeout | 166,298 | 1,394,701 | |
BURIEN S 136th Street 1st Ave S to Des Moines Memorial Dr S |
UAP | 2023 | Construction | 4,121,540 | 5,857,312 | |
BURIEN SW 148th Street 4th Ave SW to 6th Ave SW |
UAP | 2024 | Construction | 3,888,535 | 5,786,010 | |
BURLINGTON East-West Connector Burlington Blvd to Walnut Street |
UAP | 2019 | Construction | 2,688,618 | 5,626,051 | |
BURLINGTON LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 150,000 | 150,000 | |
CAMAS NW 38th Avenue NW Parker St to Grass Valley Park |
UAP | 2025 | Construction | 1,692,384 | 7,386,337 | |
CARNATION 2024 Seal Coat Multiple Locations |
SCPP | 2025 | Design | 154,000 | 162,850 | |
CARNATION Milwaukee Avenue Overlay Entwistle St to NE 50th St |
SCPP | 2025 | Design | 467,444 | 492,046 | |
CARNATION McKinley Street Eugene St to Blanche St |
SCAP | 2024 | Construction | 459,422 | 839,209 | |
CARNATION Tolt Middle School Sidewalk N Driveway to S Driveway |
CSP | 2026 | Construction | 165,750 | 207,291 | |
CASHMERE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 56,124 | 59,078 | |
CENTRALIA S Gold Street Main St to Summa St |
UAP | 2024 | Construction | 1,235,741 | 1,498,449 | |
CHEHALIS SW 13th Street Sidewalk SW William Ave to S Market Blvd |
ATP | 2025 | Construction | 256,468 | 284,965 | |
CHELAN 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 41,687 | 46,319 | |
CHELAN Sanders Street Pedestrian Improvements E Okanogan Ave and E Wapato Ave |
SCAP | 2025 | Design | 99,999 | 819,759 | |
CHELAN Lakeside Trail W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave. |
ATP | 2025 | Design | 500,000 | 3,602,414 | |
CHELAN Resin Bonded Stone Surfacing Pilot Bradley and Johnson Intersection Vicinity |
ATP | 2025 | Construction | 163,800 | 182,000 | |
CHELAN COUNTY Easy St and School St Intersection School Street Roundabout |
UAP | 2025 | Design | 800,000 | 2,431,217 | |
CHENEY Elm Street Overlay 6th Street Vicinity to Washington Street |
APP | 2025 | Design | 1,884,892 | 2,094,324 | |
CHENEY N 6th Street Roundabout Betz Road |
UAP | 2024 | Design | 966,854 | 1,074,283 | |
CHEWELAH 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 54,587 | 57,460 | |
CHEWELAH 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 171,732 | 180,771 | |
CHEWELAH W Main Avenue SR 395 to Hunt St |
SCAP | 2024 | Construction | 1,285,309 | 1,436,879 | |
CLARK COUNTY NE 152nd Avenue Padden Pkwy to NE 99th St |
UAP | 2025 | Design | 3,500,000 | 8,967,367 | |
CLARK COUNTY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 750,000 | 750,000 | |
CLARK COUNTY NE 68th Street Sidewalk Highway 99 to NE St Johns Rd |
SP | 2023 | Construction | 400,000 | 5,680,037 | |
CLARK COUNTY Truman School Sidewalk NE 40th Ave and NE 44th St |
ATP | 2024 | Design | 200,000 | 430,000 | |
CLE ELUM Second Street Roundabout Second St (SR 903) and Stafford Ave |
SCAP | 2024 | Design | 704,591 | 741,675 | |
CLE ELUM First Street - Phase 3 Oakes Ave to Peoh Ave |
SCAP | 2025 | Construction | 677,032 | 5,499,790 | |
CLE ELUM Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 350,000 | 350,000 | |
CLE ELUM 2nd Street multi-use path Pennsylvania Avenue toward Short Avenue |
CSP | 2026 | Construction | 500,000 | 538,816 | |
CLE ELUM Second Street Pathway - Phase 1 N Stafford Ave to N Pennsylvania Ave |
ATP | 2025 | Construction | 548,798 | 590,182 | |
COLFAX 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Closeout | 105,539 | 111,093 | |
COLFAX 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 891,464 | 938,383 | |
COLFAX Morton and Sumner Streets Morton Tyler to 4th Sumner 1st to 4th |
SCAP | 2024 | Construction | 914,124 | 1,336,805 | |
COLLEGE PLACE NE Damson Avenue Cargill Ave to Rose St |
UAP | 2024 | Construction | 1,261,405 | 1,426,561 | |
COLLEGE PLACE SW Mojonnier Road Improvements College Ave to Bluvue Ln |
UAP | 2025 | Design | 1,922,008 | 6,772,008 | |
COLLEGE PLACE SE 8th Street Sidewalk Birch Ave to Larch Ave |
ATP | 2025 | Design | 657,900 | 731,000 | |
COLTON 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 252,037 | 252,037 | |
COLVILLE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 49,970 | 52,600 | |
COLVILLE 2025 Pavement Preservation - Red Town Multiple Locations |
SCPP | 2026 | Application | 2,000,000 | 2,105,263 | |
CONCRETE Secondary Access SR 20 to Airport Way |
SCAP | 2023 | Design | 500,000 | 3,414,000 | |
CONNELL 2024 Chip Seal W Clark Street |
SCPP | 2025 | Construction | 119,349 | 125,631 | |
CONNELL School zone and speed feedback signs Cemetary Road to 5th Avenue |
CSP | 2026 | Construction | 57,000 | 60,000 | |
COULEE CITY McEntee Street Improvements Walnut St to Chelan St |
SCAP | 2025 | Design | 124,201 | 920,000 | |
COULEE DAM 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Closeout | 716,031 | 716,030 | |
COULEE DAM 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Closeout | 159,026 | 159,026 | |
COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Design | 481,406 | 481,406 | |
COUPEVILLE 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 182,685 | 192,299 | |
COUPEVILLE Front and N Main Street Sidewalks Multiple Locations |
ATP | 2024 | Design | 325,123 | 871,514 | |
COVINGTON Lakepointe Boulevard SR 18 to SE 258th St |
UAP | 2021 | Construction | 994,019 | 1,362,939 | |
CUSICK River Road Erosion Control Eagle's Landing Resort Vicinity |
SCPP | 2025 | Bid Auth | 50,000 | 50,000 | |
DAVENPORT 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Closeout | 226,241 | 226,241 | |
DAYTON 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 1,178,464 | 1,240,488 | |
DAYTON Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 80,000 | 80,000 | |
DAYTON S. 4th Street sidewalk E Main Street to Day Street |
CSP | 2026 | Construction | 463,811 | 493,222 | |
DES MOINES 24th Avenue S Kent-Des Moines Rd (SR 516) to S 223rd St |
UAP | 2021 | Construction | 4,212,947 | 7,493,224 | |
DOUGLAS COUNTY 21st St NE N Baker Ave to N Devon Ave |
UAP | 2025 | Design | 1,518,791 | 1,786,813 | |
DUVALL 142nd Place sidewalk - Phase 2 275th Avenue NE to 278th Avenue NE |
CSP | 2026 | Construction | 400,000 | 722,423 | |
DUVALL Main Street (SR 203) / Cherry Street RRFB NE Cherry St Crossing |
ATP | 2025 | Construction | 62,767 | 73,903 | |
EAST WENATCHEE 3rd Street SE Rock Island Rd Intersection |
UAP | 2023 | Construction | 805,588 | 1,447,705 | |
EAST WENATCHEE 19th Street NW Phase 1 SR 28 to Bella Rio Apartments |
UAP | 2024 | Construction | 2,000,000 | 5,299,012 | |
EAST WENATCHEE 5th Street NE Safety and Multimodal Improvements N Baker Ave to N Kentucky Ave |
UAP | 2025 | Design | 2,500,000 | 2,995,175 | |
EAST WENATCHEE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
EAST WENATCHEE 3rd Avenue Bike and Ped improvements N Georgia Ave to N Hanford Ave |
CSP | 2026 | Construction | 415,047 | 508,000 | |
EATONVILLE Eatonville Pavement Preservation Multiple Locations |
SCPP | 2025 | Design | 130,720 | 137,600 | |
EATONVILLE West Eatonville Sidewalk Improvements Multiple Locations |
ATP | 2025 | Design | 399,076 | 420,080 | |
EDMONDS Main Street complete streets improvements 6th Avenue to 8th Avenue |
CSP | 2026 | Construction | 449,897 | 1,671,003 | |
ELECTRIC CITY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 511,849 | 511,849 | |
ELECTRIC CITY 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 270,408 | 270,408 | |
ELLENSBURG Pfenning Road Sidewalk 240ft n/o Vantage Hwy to Radio Rd |
UAP | 2024 | Construction | 973,570 | 1,520,824 | |
ELLENSBURG Pedestrian Improvements Multiple Locations |
CSP | 2026 | Construction | 491,230 | 602,917 | |
ELMA W Main Street ADA 16th St to 18th St |
ATP | 2025 | Construction | 365,170 | 389,390 | |
ELMA Main Street RRFBs 4th St to 11th St |
ATP | 2025 | Construction | 238,096 | 255,627 | |
ENDICOTT 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 21,206 | 21,206 | |
ENUMCLAW 244th Avenue Roundabout Roosevelt Ave |
UAP | 2024 | Construction | 641,728 | 1,131,577 | |
EPHRATA Nat Washington Way Overlay A Street SE to 2nd Ave SE |
APP | 2024 | Design | 532,327 | 591,385 | |
EPHRATA Nat Washington Way Overlay A Street SE to 2nd Ave SE |
APP | 2024 | Construction | 30,807 | 34,320 | |
EVERSON S Harkness Street W Main St to Lincoln St |
SCAP | 2025 | Design | 683,671 | 719,654 | |
FAIRFIELD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 43,322 | 43,322 | |
FAIRFIELD 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Construction | 164,243 | 164,243 | |
FARMINGTON 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Design | 200,000 | 200,000 | |
FEDERAL WAY S 288th Street 16th Ave S to 34th Ave S |
UAP | 2022 | Design | 2,000,000 | 3,240,000 | |
FEDERAL WAY Pacific Highway S (SR 99) S C/L to Weigh Station |
UAP | 2023 | Design | 2,500,000 | 3,770,000 | |
FEDERAL WAY SR 99 pedestrian improvements S 304th Street to S 308th Street |
CSP | 2026 | Construction | 120,800 | 151,000 | |
FEDERAL WAY Citywide Pedestrian Crossings RRFB Crossings |
ATP | 2024 | Design | 350,001 | 503,211 | |
FERNDALE Ferndale Terrace Hendrickson Ave to Vista Dr |
UAP | 2025 | Design | 2,855,316 | 5,988,666 | |
FIFE N Levee Road Overlay 70th Ave E to Freeman Rd E |
APP | 2024 | Construction | 587,941 | 804,318 | |
FIFE 20th Street E Multimodal Improvements 5410 20th St E to 62nd Ave E |
UAP | 2025 | Design | 3,990,000 | 4,988,816 | |
FIRCREST 2022 Overlay Award Multiple Locations |
APP | 2024 | Construction | 639,121 | 726,948 | |
FIRCREST 2024 Overlay Multiple Locations |
APP | 2025 | Design | 677,409 | 801,952 | |
FIRCREST Electron Way Constra Costa Ave Intersection |
CSP | 2026 | Construction | 75,724 | 168,846 | |
FORKS 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 2,000,000 | 2,105,263 | |
FORKS West E Street 5th Ave to S Forks Ave (SR 101) |
SCAP | 2025 | Design | 549,613 | 578,540 | |
FORKS Bogachiel Way Overlay 6th Avenue to Russell Road |
SCAP | 2026 | Construction | 65,001 | 517,079 | |
FRIDAY HARBOR 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 99,324 | 110,360 | |
FRIDAY HARBOR Marguerite Place Spring St to Park St |
SCAP | 2023 | Construction | 925,000 | 2,198,399 | |
GARFIELD 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 1,700,000 | 1,700,000 | |
GIG HARBOR Wollochet Drive Signal Wagner Way |
UAP | 2025 | Construction | 1,227,050 | 1,718,804 | |
GIG HARBOR Burnham Drive Sidewalk Eagles Club Driveway to 96th St |
ATP | 2025 | Construction | 1,524,574 | 4,933,502 | |
GOLDENDALE 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Application | 1,000,000 | 1,052,632 | |
GRAND COULEE 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 275,687 | 275,687 | |
GRAND COULEE 2022 Crack Seal Citywide |
SCPP | 2024 | Construction | 164,779 | 164,779 | |
GRAND COULEE Spokane Way Improvements Alcan Rd to E Grand Coulee Ave (SR 174) |
SCAP | 2025 | Design | 126,876 | 1,015,000 | |
GRANDVIEW Wine Country Road Overlay Euclid St to Grandridge Rd |
APP | 2025 | Construction | 456,511 | 561,365 | |
GRANGER Pedestrian Safety Improvements 2nd Avenue to E Avenue |
CSP | 2026 | Construction | 71,026 | 74,764 | |
GRANGER Complete Streets Improvements Main Street - W. First Ave to Third St |
CSP | 2026 | Construction | 44,577 | 46,924 | |
GRANITE FALLS Stanley Street RRFB's Portage Ave and Kentucky Ave |
CSP | 2026 | Construction | 63,225 | 101,322 | |
GRANITE FALLS W Stanley Street Sidewalk Jordan Rd to Prospect Ave |
ATP | 2024 | Construction | 570,860 | 760,630 | |
HARTLINE 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 147,767 | 147,767 | |
HATTON 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 289,000 | 289,000 | |
HOQUIAM City of Hoquiam Safe Routes to School City of Hoquiam |
ATP | 2024 | Construction | 345,748 | 1,749,908 | |
ILWACO 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 1,500,000 | 1,578,947 | |
ISSAQUAH 12th Avenue NW SR 900 to Lake Dr |
UAP | 2023 | Construction | 3,000,000 | 5,904,859 | |
KALAMA 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 165,300 | 174,000 | |
KALAMA China Garden Road S 10th St to Gwynne Rd |
SCAP | 2025 | Design | 858,069 | 903,230 | |
KENMORE NE 170 Street ped/bike improvements Juanita Drive to 72nd Avenue NE |
CSP | 2026 | Construction | 212,888 | 360,503 | |
KENNEWICK Columbia Center Boulevard Deschutes Ave Intersection |
UAP | 2023 | Closeout | 1,472,000 | 2,452,918 | |
KENNEWICK Citywide ADA Improvements Multiple Locations |
CSP | 2026 | Construction | 327,790 | 409,745 | |
KENNEWICK Pedestrian Safety Improvements Multiple Locations |
CSP | 2026 | Construction | 204,276 | 255,345 | |
KENT Reith Road 140ft s/o S 253rd St to 200ft w/o SR 516 |
UAP | 2023 | Construction | 1,834,250 | 5,437,988 | |
KENT 76th Avenue S South Phase 2600ft s/o S 212th St to 3660 ft s/o S 212th St |
UAP | 2025 | Construction | 2,654,664 | 15,224,824 | |
KENT 132nd Avenue SE multi-use path SE 228th Place to SE 240th Street |
CSP | 2026 | Construction | 471,601 | 1,655,318 | |
KENT RRFB Crossings Various |
ATP | 2025 | Construction | 77,704 | 104,139 | |
KETTLE FALLS High School Sidewalk Corridor High School Enterance to approximately 400' E of Juniper |
CSP | 2026 | Bid Auth | 181,000 | 294,000 | |
KING COUNTY 68th Avenue S / S 124th Street Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St |
UAP | 2023 | Design | 1,706,037 | 2,132,547 | |
KING COUNTY Redmond Ridge Dr NE Roundabout NE Alder Crest Dr |
UAP | 2024 | Construction | 907,859 | 1,723,869 | |
KIRKLAND 100th Avenue NE NE 138th Pl to NE 145th St |
UAP | 2021 | Construction | 3,300,000 | 21,430,791 | |
KIRKLAND 116th Avenue NE sidewalk improvements NE 73rd Street to NE 75th Street |
CSP | 2026 | Construction | 500,000 | 844,915 | |
KIRKLAND RRFB project Crosswalk at 124th Ave NE and NE 104th Street |
CSP | 2026 | Construction | 108,967 | 141,157 | |
KIRKLAND 132nd Avenue NE NE 110th Pl to NE 97th St |
SP | 2023 | Construction | 125,001 | 1,150,225 | |
KIRKLAND Pedestrian Crossing at Lake Washington Institute of Technology 132nd Ave NE |
ATP | 2025 | Design | 265,000 | 351,700 | |
KITSAP COUNTY SE Lund Avenue Harris Rd SE Intersection |
UAP | 2023 | Design | 3,664,358 | 4,585,448 | |
KITSAP COUNTY Lund Avenue Roundabout Chase Rd Roundabout |
UAP | 2025 | Design | 2,668,198 | 3,335,249 | |
KITTITAS 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 51,826 | 54,522 | |
LA CONNER Pedestrian Improvements Multiple Locations |
CSP | 2026 | Construction | 30,318 | 34,727 | |
LACEY College Street NE Martin Way to 15th Ave NE |
UAP | 2022 | Bid Auth | 2,830,000 | 4,800,000 | |
LAKE FOREST PARK SR 104 40th Pl NE Roundabout |
UAP | 2021 | Design | 2,561,198 | 3,240,000 | |
LAKE STEVENS 91st Avenue SE Sidewalk 8th St SE to Market Pl |
CSP | 2026 | Construction | 442,564 | 1,347,807 | |
LAKEWOOD S Tacoma Way Signal 92nd St S |
UAP | 2025 | Design | 750,000 | 1,250,000 | |
LAKEWOOD Custer Road W Bridgeport Way SW to 75th ST W |
UAP | 2025 | Design | 2,976,687 | 3,720,858 | |
LAKEWOOD Steilacoom Boulevard SW Sidewalk 87th Ave SW to Weller Rd SW |
SP | 2023 | Construction | 442,680 | 5,661,272 | |
LEAVENWORTH 2024 Scrub Seal - Red Town InitiativeIncre Multiple Locations |
SCPP | 2024 | Construction | 1,170,921 | 1,301,023 | |
LEAVENWORTH 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 113,035 | 141,694 | |
LEAVENWORTH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
LEAVENWORTH Curb Ramp Improvements Multiple Locations |
ATP | 2025 | Design | 277,992 | 308,880 | |
LIND 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Construction | 172,356 | 172,356 | |
LONG BEACH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
LONG BEACH 2nd Street NE Sidewalk Washington Ave S to 600ft e/o Washington Ave S |
ATP | 2025 | Bid Auth | 336,300 | 354,000 | |
LONGVIEW 46th Avenue SR 4 to Olympia Way |
UAP | 2021 | Construction | 3,331,544 | 5,919,825 | |
LONGVIEW Olympia Way and Nichols Blvd Multiple Locations |
UAP | 2025 | Construction | 1,747,877 | 2,352,651 | |
LONGVIEW Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 | |
LONGVIEW 18th Avenue ADA Ramps Louisiana Street to Olympia Way |
CSP | 2026 | Construction | 117,224 | 151,345 | |
LYNDEN 2024 1st Street Overlay Riverview Rd to Grover St |
APP | 2025 | Construction | 371,014 | 567,655 | |
LYNNWOOD Poplar Way Bridge 196th St SW to Alderwood Mall Blvd |
UAP | 2024 | Design | 5,000,000 | 42,085,000 | |
LYNNWOOD 2024 Curb Ramps Multiple Locations |
CSP | 2026 | Construction | 500,000 | 840,690 | |
MABTON 2024 Otta Seal Multiple Locations |
SCPP | 2024 | Construction | 656,777 | 656,777 | |
MABTON Main Street Reconstruction Project Washington St to SR 22 |
SCAP | 2022 | Construction | 295,963 | 2,381,514 | |
MABTON Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
MALDEN 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 477,470 | 477,470 | |
MANSFIELD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 135,850 | 135,850 | |
MAPLE VALLEY Maple Valley Highway (SR 169) SE 253rd Pl to SE 260th St |
UAP | 2024 | Construction | 2,261,668 | 15,295,345 | |
MAPLE VALLEY Crosswalk safety RRFB Multiple Locations |
CSP | 2026 | Construction | 153,491 | 191,864 | |
MAPLE VALLEY SE Kent Kangley Road (SR 516) Sidewalk 800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE |
ATP | 2025 | Design | 742,383 | 927,980 | |
MARYSVILLE State Avenue 104th Pl NE to 116th St NE |
UAP | 2022 | Construction | 4,250,000 | 8,583,489 | |
MARYSVILLE 156th Street NE Smokey Pt Blvd to Hayho Creek |
UAP | 2025 | Design | 1,440,000 | 1,800,000 | |
MARYSVILLE Citywide ADA Ramps Multiple Locations |
CSP | 2026 | Construction | 345,547 | 4,252,526 | |
MARYSVILLE RRFB project Multiple locations |
CSP | 2026 | Construction | 47,740 | 62,267 | |
MARYSVILLE 53rd Ave NE Shared Used Path 61st St NE to SR 528 |
ATP | 2024 | Construction | 320,000 | 2,036,464 | |
MATTAWA 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 1,300,000 | 1,300,000 | |
MATTAWA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 100,000 | 100,000 | |
MCCLEARY W Maple Street Sidewalk S 6th St to S Main St |
ATP | 2025 | Design | 495,843 | 521,940 | |
MEDICAL LAKE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 242,318 | 255,102 | |
MEDICAL LAKE 2024 Scrub and Chip Seal - Red Town Multiple Locations |
SCPP | 2025 | Construction | 902,129 | 949,815 | |
MEDICAL LAKE Lefevre Street (SR 902) Ped/Bike Improvements Hancock Street North to Brooks Road |
CSP | 2026 | Construction | 1,824,728 | 2,242,491 | |
MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Construction | 447,120 | 483,941 | |
MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Design | 250,240 | 272,000 | |
MEDINA Upland Road Overlay Overlake Drive W to NE 6th St |
SCPP | 2024 | Construction | 233,351 | 264,279 | |
MESA 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 359,766 | 359,766 | |
MILLWOOD 2025 Empire Ave Pavement Preservation Argonne to Butler |
SCPP | 2026 | Application | 80,000 | 84,211 | |
MILLWOOD Argonne Road Reconstruction - Phase 2 E Trent Ave to 150 ft s/o S Frederick Ave |
SCAP | 2025 | Design | 1,409,230 | 1,483,400 | |
MILLWOOD Argonne Road Reconstruction - Phase 1 150 ft s/o Frederick to N of Riverway |
SCAP | 2025 | Design | 1,278,255 | 4,448,347 | |
MILTON 2022 Overlay Award Multiple Locations |
APP | 2024 | Construction | 511,185 | 605,400 | |
MILTON Pacific Highway S (SR 99) Porter Way Intersection |
UAP | 2021 | Construction | 3,380,530 | 3,980,616 | |
MONROE RRFB Crossings City of Monroe |
ATP | 2025 | Construction | 114,836 | 149,502 | |
MONTESANO W. Pioneer Avenue Main to 4th |
SCAP | 2024 | Construction | 155,610 | 1,668,625 | |
MONTESANO Lake Sylvia Road Sidewalk McBryde Ave to Nevills Lane |
SCAP | 2026 | Construction | 45,509 | 669,000 | |
MORTON 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Construction | 783,930 | 825,190 | |
MORTON 2022 Overlay Award City Wide |
SCAP | 2024 | Construction | 417,662 | 572,300 | |
MOSES LAKE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 105,000 | 105,000 | |
MOUNT VERNON Laventure Road Hoag Rd to Sigmar Ln |
UAP | 2025 | Design | 1,208,800 | 1,536,000 | |
MOUNTLAKE TERRACE 66th Avenue W 220th St SW to N City Limits |
UAP | 2021 | Construction | 2,503,000 | 3,433,637 | |
MOXEE Pedestrian Improvements Multiple Locations |
CSP | 2026 | Construction | 316,959 | 395,715 | |
MUKILTEO Harbour Pointe Blvd. paved path 47th Place Way to Cyrus Way |
CSP | 2026 | Construction | 403,054 | 1,055,804 | |
NACHES Downtown Revitalization Plan W 2nd Street to W 3rd Street |
CSP | 2026 | Construction | 71,250 | 75,000 | |
NAPAVINE 2nd Ave SE Overlay Washington St to RR tracks |
SCPP | 2025 | Construction | 178,874 | 188,289 | |
NORTH BEND 2024 Overlay Multiple Locations |
APP | 2025 | Construction | 725,714 | 863,780 | |
NORTH BEND Sidewalk gaps Multiple Locations |
CSP | 2026 | Construction | 484,863 | 1,413,981 | |
NORTH BEND SR202 Sidewalk Gap North Bend Way to RR Tracks |
ATP | 2025 | Bid Auth | 133,819 | 157,435 | |
NORTH BONNEVILLE Cascade Drive and Hot Springs Way Varies |
SCAP | 2025 | Construction | 286,730 | 301,822 | |
OAK HARBOR NE 7th Avenue e/o Oak Harbor St to Harvest Dr |
UAP | 2024 | Construction | 702,174 | 3,001,533 | |
OAK HARBOR LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 220,000 | 220,000 | |
OAKVILLE 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Construction | 585,000 | 585,000 | |
OAKVILLE School Street and W Pine Street SR 12 to Ash St and SR 12 to School St |
SCAP | 2024 | Design | 638,743 | 638,743 | |
OKANOGAN 2023 Maintenance Project Citywide |
SCPP | 2024 | Construction | 200,884 | 211,457 | |
OKANOGAN 3rd Avenue Improvements Irene St to Greta St |
SCAP | 2025 | Design | 1,235,000 | 1,300,000 | |
OKANOGAN Oak Street 2nd Ave to Bridge e/o 1st Ave |
SCAP | 2023 | Construction | 66,591 | 503,263 | |
OLYMPIA Fones Road SE Pacific Ave SE to 18th Ave SE |
UAP | 2023 | Construction | 2,000,000 | 17,979,962 | |
OLYMPIA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
OMAK 2023 Maintenance Project Citywide |
SCPP | 2024 | Construction | 243,615 | 256,437 | |
OMAK Jonathan Avenue Pine St to Quince St |
SCAP | 2025 | Design | 792,300 | 834,000 | |
OMAK Central Ave Reconstruction Phase II Cedar St to Fir St |
SCAP | 2025 | Design | 940,405 | 989,900 | |
OROVILLE Ironwood Street 12th Ave to 17th Ave |
SCAP | 2024 | Construction | 1,114,251 | 1,182,896 | |
ORTING Kansas Street Reconstruction SR 162 to Coe Ln |
UAP | 2025 | Design | 4,420,363 | 4,911,515 | |
ORTING LED Streetlight Conversion Citywide |
LED | 2025 | Construction | 49,000 | 49,000 | |
OTHELLO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 | |
PACIFIC Ellingson Overlay West Valley Hwy to UPRR Crossing |
APP | 2025 | Design | 1,607,270 | 1,786,103 | |
PACIFIC New sidewalks Multiple Locations |
CSP | 2026 | Construction | 620,713 | 1,001,724 | |
PACIFIC Interurban Trail Crossing Improvements Ellingson Rd |
ATP | 2025 | Design | 79,240 | 88,044 | |
PACIFIC LED Streetlight Conversion PSE Owned |
LED | 2020 | Construction | 110,250 | 110,250 | |
PASCO Lewis Street 2nd Ave to Oregon Ave (SR 397) |
UAP | 2021 | Construction | 7,000,000 | 25,690,769 | |
PASCO Court Street Roundabout Rd 68 Roundabout |
UAP | 2025 | Construction | 1,415,000 | 2,950,731 | |
PATEROS Commercial Avenue Multimodal Improvements Lakeshore Drive to S Dawson Street |
CSP | 2026 | Construction | 1,013,425 | 1,231,242 | |
PATEROS Downtown ADA Improvements Multiple Locations |
ATP | 2024 | Construction | 544,650 | 544,650 | |
PATEROS Resin Bonded Stone Surfacing Pilot Intersection Vicinity |
ATP | 2025 | Design | 136,000 | 136,000 | |
PIERCE COUNTY Canyon Road E 208th St E to 200th St E |
UAP | 2023 | Construction | 2,000,000 | 11,403,610 | |
PIERCE COUNTY 122nd Avenue E 146th St Ct E to 136th St E |
UAP | 2025 | Design | 5,000,000 | 18,501,901 | |
PIERCE COUNTY Pedestrian improvements Multiple Locations |
CSP | 2026 | Construction | 389,443 | 490,804 | |
PIERCE COUNTY 2025 RRFB School Crossing Gem Height Dr @ 94th Ave E and 182nd St E and Ainsworth Ave S @ Garfield St |
ATP | 2025 | Design | 619,840 | 824,000 | |
PORT ANGELES 2024 Marine Drive Overlay Tumwater Truck Route to Hill Street |
APP | 2025 | Construction | 534,558 | 848,451 | |
PORT ANGELES 8th Street Lincoln St to A St |
UAP | 2024 | Bid Auth | 1,464,365 | 1,904,365 | |
PORT ORCHARD Bethel Avenue Bethel Rd, Lincoln Ave SE, Mitchell Rd SE |
UAP | 2023 | Construction | 985,493 | 1,241,866 | |
PORT ORCHARD Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 650,000 | 650,000 | |
PORT ORCHARD LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 200,000 | 200,000 | |
PORT TOWNSEND Tyler Street Overlay Jefferson St to Lawrence St |
APP | 2024 | Design | 379,355 | 446,299 | |
PORT TOWNSEND Discovery Road Rainier St to McClellan St |
UAP | 2022 | Construction | 2,481,424 | 5,566,751 | |
PORT TOWNSEND Lawrence Street Pedestrian Improvements Harrison Street to Tyler Street |
CSP | 2026 | Construction | 567,525 | 997,964 | |
PORT TOWNSEND Washington Street and Walker Street Improvements Washington St and Gaines St to Walker St and Jefferson St |
ATP | 2025 | Design | 198,600 | 234,000 | |
POULSBO Noll Road - Segment 3A Mesford Rd to NE Kevos Pond Dr |
UAP | 2022 | Design | 1,360,000 | 3,020,000 | |
POULSBO Noll Road Phase 3B Lincoln Rd NE to Kevos Pond Dr |
UAP | 2024 | Design | 1,200,000 | 3,868,100 | |
POULSBO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
POULSBO LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 175,000 | 175,000 | |
PULLMAN Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 750,000 | 750,000 | |
PULLMAN Downtown complete streets Grand Avenue to Spring Street |
CSP | 2026 | Construction | 1,000,000 | 1,177,875 | |
PUYALLUP 7th Street Sidewalk 9th St to 11th St |
ATP | 2024 | Design | 350,000 | 579,000 | |
RAYMOND 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Construction | 1,214,937 | 1,278,881 | |
RAYMOND 2024 SW Raymond Overlay Multiple Locations |
SCPP | 2025 | Construction | 368,650 | 388,050 | |
RAYMOND Downtown Pedestrian Improvements Multiple Locations |
CSP | 2026 | Construction | 689,637 | 726,118 | |
REARDAN Gravel Street Otta Seal Multiple Locations |
SCPP | 2024 | Construction | 709,373 | 709,373 | |
REDMOND Redmond Way (SR 202) and NE 76th Street Bear Ck to E Lake Samm Pkwy; SR 202 to Fred Meyer |
UAP | 2021 | Construction | 1,588,500 | 4,659,028 | |
REDMOND Bel Red Road Buffered Bike Lanes NE 30th St to W Lake Sammamish Pkwy |
ATP | 2024 | Design | 650,000 | 3,062,000 | |
RENTON Rainier Avenue S/N S 3rd St (SR 900) to NW 3rd Pl |
UAP | 2023 | Construction | 5,355,150 | 26,454,839 | |
RENTON SW 43rd Street W C/L to SR 167 Ramps |
UAP | 2025 | Design | 2,975,154 | 5,979,841 | |
RENTON S 7th Street Improvements Oakesdale Ave S to Burnett Ave S |
ATP | 2025 | Construction | 229,495 | 2,193,252 | |
REPUBLIC Gravel Street Otta Seal Multiple Locations |
SCPP | 2024 | Construction | 1,087,433 | 1,087,433 | |
RICHLAND Downtown Connectivity Improvements George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St |
UAP | 2024 | Design | 3,500,000 | 16,781,600 | |
RICHLAND Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 450,000 | 450,000 | |
RIDGEFIELD S Royle Road S 15th St to S 5th Way |
UAP | 2023 | Construction | 2,930,531 | 5,687,249 | |
RIDGEFIELD Hillhurst Pedestrian Improvements Multiple Locations |
CSP | 2026 | Construction | 260,000 | 348,300 | |
RITZVILLE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 42,312 | 44,539 | |
RITZVILLE 1st Avenue Improvements Division St to Palouse St |
SCAP | 2025 | Construction | 375,432 | 418,525 | |
RITZVILLE 6th Avenue Sidewalk Division St to Chelan St |
ATP | 2024 | Construction | 378,528 | 407,468 | |
ROCK ISLAND Douglas Street Improvements Rock Island Rd to 3rd St SW |
SCAP | 2025 | Design | 106,850 | 898,350 | |
ROCKFORD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 67,600 | 67,600 | |
ROCKFORD 2024 Pavement Preservation Multiple Locations |
SCPP | 2025 | Design | 160,450 | 160,450 | |
ROSALIA 2024 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 117,600 | 117,600 | |
ROSLYN 2024 Maintenance Project Multiple Locations |
SCPP | 2026 | Bid Auth | 300,000 | 315,790 | |
ROY 2021 Overlay McNaught St to Roy Elementary School |
SCPP | 2023 | Construction | 105,573 | 111,128 | |
ROY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 100,000 | 100,000 | |
ROYAL CITY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 113,769 | 119,757 | |
ROYAL CITY 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Construction | 439,973 | 463,130 | |
ROYAL CITY Apple Avenue NE Sidewalks Camelia St to Slate Ln NE |
SP | 2023 | Closeout | 348,396 | 431,667 | |
RUSTON 2024 Overlay 52nd to Park Ave |
SCPP | 2025 | Design | 352,222 | 370,760 | |
RUSTON Park Street End of Road to Bennett St |
SCAP | 2023 | Construction | 879,049 | 1,288,116 | |
SEATAC Airport Station Pedestrian Improvements S 176th St/32nd Ave S and S 180th St |
UAP | 2025 | Design | 4,000,000 | 27,417,979 | |
SEATAC Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
SEATTLE East Marginal Way S S Atlantic to S Spokane St. |
UAP | 2020 | Construction | 3,000,000 | 19,393,875 | |
SEATTLE Lake Washington Blvd. renovations Lake Park Drive S to S Juneau Street |
CSP | 2026 | Construction | 164,248 | 223,974 | |
SEATTLE 4th Avenue S Walkway S Royal Brougham Way to I 90 Off-Ramp |
SP | 2023 | Construction | 247,000 | 639,570 | |
SEDRO WOOLLEY 2024 N Reed Street Overlay SR 20 to Brickyard Creek |
APP | 2025 | Construction | 339,389 | 404,282 | |
SEDRO WOOLLEY Township Street (SR 9) John Liner Rd / McGarigle Rd Intersection |
UAP | 2023 | Design | 3,404,134 | 4,255,167 | |
SEDRO WOOLLEY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 500,000 | 500,000 | |
SEDRO WOOLLEY Sidewalk and ADA Ramp Upgrades Multiple Locations |
CSP | 2026 | Construction | 244,851 | 293,060 | |
SEDRO WOOLLEY Cascade Trail West Extension Phase 2A Holtcamp Rd to Hodgin St |
ATP | 2024 | Design | 326,000 | 860,000 | |
SELAH E Goodlander Road Signal Landcaster Rd Signal |
UAP | 2025 | Construction | 538,020 | 622,800 | |
SEQUIM N Sequim Avenue Hendrickson St to Old Olympic Hwy |
UAP | 2022 | Construction | 1,073,186 | 4,227,100 | |
SHELTON Olympic Highway North C S to Wallace Kneeland Blvd |
UAP | 2025 | Design | 3,688,752 | 4,098,614 | |
SHORELINE 145th Street (SR 523) 3rd Ave NE to 5th Ave NE (I-5 Interchange) |
UAP | 2023 | Construction | 5,000,000 | 40,621,677 | |
SHORELINE N 145th Street (SR 523) Phase 1 Corliss Ave N to 3rd Ave NE |
UAP | 2024 | Construction | 5,000,000 | 11,845,978 | |
SHORELINE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
SHORELINE 8th Avenue NW Sidewalk Sunset School Park to Richmond Beach Rd NW |
ATP | 2025 | Design | 330,000 | 1,870,942 | |
SNOHOMISH 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 424,999 | 500,000 | |
SNOHOMISH Avenue D Overlay Multiple Locations |
APP | 2025 | Design | 455,353 | 535,710 | |
SNOHOMISH 13th Street Intersection Improvements Park Ave |
ATP | 2025 | Design | 177,539 | 208,870 | |
SNOHOMISH COUNTY 35th Avenue W 156th St SW to 148th St SW |
UAP | 2023 | Construction | 3,062,777 | 4,000,864 | |
SNOHOMISH COUNTY Larch Way Roundabout Locust Wy and Logan Rd |
UAP | 2024 | Construction | 2,875,000 | 4,205,001 | |
SNOHOMISH COUNTY Alderwood Mall Parkway SR 525 to 168th St SW |
UAP | 2025 | Design | 4,500,000 | 16,155,483 | |
SNOHOMISH COUNTY Pedestrian improvements Multiple Locations |
CSP | 2026 | Construction | 144,998 | 181,381 | |
SNOHOMISH COUNTY Puget Park Drive RRFBs Various |
ATP | 2025 | Design | 195,914 | 301,406 | |
SNOQUALMIE 384th Ave SE Sidewalk Newton Ave to SE Kimball Creek Dr |
ATP | 2024 | Construction | 518,909 | 3,599,774 | |
SOAP LAKE 2024 Scrub Seal - Red Town Initative Multiple Locations |
SCPP | 2024 | Construction | 1,190,400 | 1,190,400 | |
SOAP LAKE Canna Street and 1st Avenue NE Main Ave E to SR 17 |
SCAP | 2023 | Construction | 1,002,500 | 1,039,580 | |
SOAP LAKE Main Avenue W Cherry St S to Ginkgo St S |
SCAP | 2024 | Construction | 839,783 | 839,783 | |
SOUTH BEND 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 2,000,000 | 2,105,263 | |
SOUTH BEND First Street A St to C St |
SCAP | 2025 | Design | 546,587 | 575,354 | |
SOUTH PRAIRIE 2024 Otta Seal Multiple Locations |
SCPP | 2024 | Design | 145,000 | 145,000 | |
SOUTH PRAIRIE 2024 Maintenance Project Citywide Crack Seal |
SCPP | 2025 | Design | 3,130 | 3,130 | |
SOUTH PRAIRIE Pioneer Way E (SR 162) Emery St |
SCAP | 2025 | Design | 785,622 | 785,622 | |
SPANGLE 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Construction | 354,858 | 354,858 | |
SPOKANE Thor / Freya Couplet Hartson Ave to 150ft n/o Sprague Ave |
UAP | 2022 | Construction | 267,333 | 3,462,911 | |
SPOKANE Maple Street and Walnut Street 5th Ave to 1st Ave |
UAP | 2024 | Design | 920,400 | 1,534,000 | |
SPOKANE Riverside Ave. Monroe St to Wall St |
UAP | 2025 | Design | 887,000 | 1,774,000 | |
SPOKANE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
SPOKANE Traffic Calming - Cycle 10 Multiple Locations |
CSP | 2026 | Construction | 500,000 | 2,909,768 | |
SPOKANE Traffic Calming - Cycle 11 Multiple Locations |
CSP | 2026 | Construction | 413,837 | 1,085,924 | |
SPOKANE Haven Street Sidewalk Rockwell Ave to Heroy Ave |
SP | 2023 | Construction | 177,348 | 283,276 | |
SPOKANE COUNTY Hatch Road Phase 1 MP 0.60 to MP 1.10 |
UAP | 2024 | Construction | 1,511,795 | 2,019,726 | |
SPOKANE COUNTY Hatch Road Reconstruction Phase 2 MP 1.10 to MP 1.63 |
UAP | 2025 | Design | 2,434,400 | 3,043,000 | |
SPOKANE COUNTY ADA and Ped Safety Freya and Glenrose Streets |
CSP | 2026 | Construction | 334,446 | 386,193 | |
SPOKANE COUNTY Rowan Ave. ADA Ramp Replacement Starr Rd to Idaho Rd |
ATP | 2025 | Construction | 336,437 | 446,456 | |
SPOKANE VALLEY Sprague Ave. Pedestrian Crossings Chronicle Rd and McKinnon Rd |
ATP | 2025 | Design | 479,588 | 666,096 | |
SPRAGUE 4th Street Sidewalk SR 23 to E St |
ATP | 2024 | Design | 490,900 | 490,900 | |
STEILACOOM Townwide RRFB Project Steilacoom Blvd, Union Ave and Puyallup St |
ATP | 2024 | Construction | 215,209 | 286,946 | |
STEVENSON 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 144,907 | 152,534 | |
STEVENSON 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 163,740 | 172,360 | |
STEVENSON 1st Street Columbia St to Guardrail |
SCAP | 2025 | Construction | 225,175 | 1,013,958 | |
SUMNER Stewart Road White River Bridge Butte Ave E to 140th Ave Ct E |
UAP | 2024 | Construction | 6,375,000 | 34,821,560 | |
SUMNER Pedestrian improvements Multiple Locations |
CSP | 2026 | Construction | 448,175 | 702,310 | |
SUMNER Elm Street Sidewalks Bonney Ave to Wright Ave |
ATP | 2024 | Construction | 299,877 | 419,478 | |
SUNNYSIDE Yakima Valley Highway Overlay 1st St to 6th St |
APP | 2025 | Construction | 336,252 | 437,715 | |
SUNNYSIDE Citywide pedestrian improvements Multiple Locations |
CSP | 2026 | Construction | 514,227 | 614,972 | |
SUNNYSIDE 6th Street North Ave to Decatur Ave |
SP | 2023 | Construction | 348,542 | 4,256,439 | |
TACOMA E 64th Street McKinley Ave E to Portland Ave |
UAP | 2023 | Construction | 3,026,443 | 6,255,753 | |
TACOMA Sheridan Avenue Phase 1 S 72nd St to S 64th St |
UAP | 2024 | Design | 3,560,000 | 5,954,332 | |
TACOMA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 450,000 | 450,000 | |
TACOMA McKinley overlook complete streets East E Street to East F Street |
CSP | 2026 | Construction | 469,532 | 722,083 | |
TACOMA S Yakima Avenue Sidewalk S 67th St to S 70th St |
SP | 2023 | Closeout | 268,983 | 476,064 | |
TEKOA 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Closeout | 161,533 | 161,533 | |
TENINO 2024 Park Avenue Overlay 6th St to Howard St |
SCPP | 2025 | Closeout | 278,792 | 305,742 | |
THURSTON COUNTY Marvin Road SE 22nd Ave to Union Mills Rd |
UAP | 2024 | Construction | 3,750,000 | 5,643,310 | |
THURSTON COUNTY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
TONASKET 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Closeout | 282,896 | 282,896 | |
TONASKET Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 50,000 | 50,000 | |
TONASKET Perfect Passage 1st Street to 4th Street |
CSP | 2026 | Construction | 1,017,153 | 6,298,435 | |
TOPPENISH Jackson Street and Juniper Street Monroe Ave to Magnolia St |
UAP | 2023 | Design | 1,386,360 | 1,540,400 | |
TUKWILA West Valley Highway (SR 181) Strander Bvd to I-405 |
UAP | 2019 | Closeout | 2,115,432 | 4,790,215 | |
TUKWILA Southcenter Boulevard Signal 65th Avenue S |
UAP | 2025 | Design | 782,090 | 1,182,090 | |
TUMWATER Capitol Boulevard South, Trosper Road SE Ruby St to Market, Linda St to I-5 |
UAP | 2019 | Construction | 9,829,120 | 18,424,998 | |
TUMWATER Tumwater Boulevard NB I-5 On/Off Ramp Intersection |
UAP | 2024 | Design | 2,250,000 | 6,250,000 | |
TUMWATER Linwood Avenue Sidewalk Susitna Ln to 2nd Ave |
SP | 2023 | Construction | 371,250 | 1,741,572 | |
TWISP 2024 Complete Streets Multiple Locations |
CSP | 2026 | Bid Auth | 42,750 | 45,000 | |
TWISP North End SR 20 PedestrianBike Path Twisp River Br to Days Ln |
ATP | 2025 | Bid Auth | 611,372 | 1,664,962 | |
UNIVERSITY PLACE Grandview Avenue Roundabout 36th St |
UAP | 2025 | Design | 664,480 | 830,600 | |
VANCOUVER SE 1st Street SE 177th Ave to SE 192nd Ave |
UAP | 2021 | Construction | 1,892,899 | 11,369,281 | |
VANCOUVER W Fourth Plain Boulevard Franklin St Intersection |
UAP | 2023 | Construction | 540,176 | 904,167 | |
VANCOUVER NE 137th Avenue NE 49th St to NE Fourth Plain Blvd |
UAP | 2024 | Construction | 3,250,000 | 28,658,398 | |
VANCOUVER Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 500,000 | 500,000 | |
VANCOUVER Fourth Plain Boulevard Fort Vancouver Way to Andresen Road |
CSP | 2026 | Construction | 500,000 | 4,711,428 | |
VANCOUVER Hazel Dell Avenue Multiuse Path Discovery Trail to Burnt Bridge Creek Greenway |
ATP | 2024 | Design | 500,000 | 683,000 | |
WALLA WALLA Clinton Street Overlay Isaacs Ave to Sumach St |
APP | 2025 | Construction | 398,654 | 1,257,770 | |
WALLA WALLA E Chestnut Street Roundabout Approximately 200ft north south east and west |
UAP | 2025 | Design | 1,110,000 | 1,510,000 | |
WALLA WALLA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
WALLA WALLA Citywide pedestrian improvements Multiple Locations |
CSP | 2026 | Construction | 564,694 | 951,202 | |
WAPATO 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 950,000 | 1,000,000 | |
WAPATO S Naches Avenue 1st St to 4th St |
SCAP | 2024 | Construction | 725,284 | 763,457 | |
WAPATO N Ahtanum Avenue Reconstruction W 1st St to End of Road |
SCAP | 2025 | Design | 807,975 | 850,500 | |
WAPATO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 50,000 | 50,000 | |
WARDEN 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 2,000,000 | 2,105,263 | |
WARDEN 1st Street North Reconstruction N County Rd to Railroad tracks |
SCAP | 2025 | Design | 1,772,700 | 1,866,000 | |
WARDEN Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
WARDEN W First Street (SR 170) Pathway S County Rd to Railroad R/W |
ATP | 2024 | Design | 57,375 | 425,000 | |
WASHOUGAL 2024 Main Street Overlay Multiple Locations |
APP | 2025 | Construction | 722,690 | 967,582 | |
WASHOUGAL Evergreen Way Sidewalk 42nd St to Schmid Park |
ATP | 2025 | Construction | 392,345 | 461,582 | |
WATERVILLE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 186,175 | 186,175 | |
WAVERLY 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Construction | 120,528 | 120,528 | |
WENATCHEE Springwater Avenue Woodward Dr to Western Ave |
UAP | 2021 | Construction | 2,185,000 | 3,788,965 | |
WENATCHEE McKittrick Street Pine St to Pershing St (City Limits) |
UAP | 2023 | Construction | 1,913,123 | 2,449,465 | |
WENATCHEE Red Apple Road Vista Pl to Miller St |
UAP | 2024 | Design | 1,919,228 | 2,399,035 | |
WENATCHEE 9th Street Corridor Improvements Miller St to BNSF Railroad Crossing |
UAP | 2025 | Design | 1,199,000 | 1,499,170 | |
WENATCHEE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
WENATCHEE Pedestrian Crossing Improvements 5th and Emerson |
CSP | 2026 | Construction | 33,121 | 301,374 | |
WEST RICHLAND School zone pedestrian improvements Multiple Locations |
CSP | 2026 | Construction | 228,971 | 269,378 | |
WEST RICHLAND Candy Mountain pathway 500' West of Milky Way to Watkins Way |
CSP | 2026 | Construction | 151,500 | 244,117 | |
WESTPORT N Forrest Street Ocean Ave to 400 ft n/o Sprague Ave |
SCAP | 2024 | Construction | 750,756 | 790,270 | |
WILBUR 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 31,476 | 31,476 | |
WILBUR 2024 Overlay Multiple Locations |
SCPP | 2025 | Design | 716,277 | 716,277 | |
WINLOCK NW Arden Avenue NW Fir St to W Walnut St |
SCAP | 2025 | Design | 814,076 | 856,923 | |
WINTHROP Horizon Flats Road Twin Lakes Rd to 3650 feet south |
SCAP | 2023 | Construction | 885,529 | 932,136 | |
WINTHROP Bridge Street Improvement Project Riverside Ave to Bluff St |
ATP | 2025 | Design | 528,675 | 556,500 | |
WOODINVILLE 131st Avenue NE (SR 202) Trestle Replacement NE 175th St to NE 177th Pl |
UAP | 2025 | Design | 5,000,000 | 16,287,938 | |
WOODLAND 2024 S Pekin Overlay Davidson Ave to n/o Marty Lp |
APP | 2025 | Construction | 651,569 | 723,955 | |
YACOLT W Hoag Street Parcel Ave to Railroad Ave |
SCAP | 2025 | Design | 360,240 | 379,200 | |
YAKIMA N 1st Street MLK Blvd to J St |
UAP | 2023 | Construction | 1,500,000 | 11,378,665 | |
YAKIMA 34th Avenue Roundabouts Fruitvale Boulevard to 34th Avenue |
UAP | 2025 | Bid Auth | 2,087,102 | 4,100,000 | |
YAKIMA Nob Hill Boulevard Improvements S 4th Ave to S 15th Ave |
UAP | 2025 | Construction | 957,599 | 1,255,649 | |
YAKIMA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 250,000 | 250,000 | |
YAKIMA Pedestrian improvements Intersection at 5th Avenue and D Street |
CSP | 2026 | Construction | 198,300 | 631,900 | |
YELM ADA Ramp Rehabilitation Multiple Locations |
CSP | 2026 | Construction | 261,545 | 307,700 | |
ZILLAH 8th Street Improvements Rainier Ave to First Ave |
SCAP | 2025 | Construction | 446,976 | 527,262 |