ABERDEEN Sumner Avenue (SR 101) Sidewalk Oak St to Williams St |
ATP | 2024 | Design | 450,000 | 1,141,775 | |
ABERDEEN US 101 Safety Improvements US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17 |
ATP | 2025 | Design | 450,000 | 2,205,000 | |
AIRWAY HEIGHTS 10th Avenue Extension 10th Ave terminus to Hayford Rd |
UAP | 2022 | Construction | 2,467,406 | 3,799,424 | |
AIRWAY HEIGHTS 6th Avenue Craig Rd to Russell St |
UAP | 2025 | Design | 754,341 | 6,193,341 | |
ALBION 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 700,000 | 700,000 | |
ALGONA Ellingson Road Overlay Pacific Ave to UPRR |
SCPP | 2025 | Design | 678,600 | 754,000 | |
ANACORTES Commercial Avenue (SR 20 Spur) 13th St to 11th St |
UAP | 2021 | Design | 950,000 | 3,525,442 | |
ANACORTES R Avenue Improvements 27th St to 34th St |
UAP | 2024 | Bid Auth | 550,000 | 4,718,218 | |
ANACORTES Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 | |
ARLINGTON 211th Place SR 530 to 67th Ave NE |
UAP | 2024 | Design | 2,300,000 | 2,885,118 | |
ASOTIN 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 56,525 | 59,500 | |
ASOTIN 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 139,440 | 146,779 | |
AUBURN Auburn Way S Widening Hemlock St to Poplar St |
UAP | 2025 | Design | 3,309,032 | 7,994,034 | |
AUBURN Regional Growth Center Improvements B St NE and 3rd St NE to Auburn Wy N and 4th St NE |
UAP | 2025 | Design | 2,112,444 | 3,686,370 | |
BAINBRIDGE ISLAND NE Wyatt Way Eagle Harbor Dr NE |
ATP | 2025 | Design | 500,000 | 3,928,489 | |
BATTLE GROUND 2024 Eaton Boulevard Overlay Multiple Locations |
APP | 2025 | Design | 487,448 | 609,310 | |
BATTLE GROUND SE Grace Avenue - Phase II NE 1st St to SE Rasmussen Blvd |
UAP | 2023 | Design | 3,000,000 | 6,310,056 | |
BATTLE GROUND Complete Streets Award March 2019 Selection |
CSP | 2020 | Construction | 350,000 | 350,000 | |
BELLEVUE 150th Avenue SE 28th St to SE 38th St |
UAP | 2024 | Design | 3,990,000 | 10,966,587 | |
BELLEVUE 123rd Avenue SE pedestrian improvements SE 60th Street to Newcastle Way |
CSP | 2026 | Application | 600,000 | 2,181,014 | |
BELLINGHAM Meridian St W Illinois St Roundabout |
UAP | 2022 | Construction | 575,000 | 1,105,689 | |
BELLINGHAM Lincoln St/E Maple Street Lincoln St to Consolidation Ave |
UAP | 2023 | Construction | 480,000 | 650,000 | |
BELLINGHAM 12th Street and Finnegan Way McKenzie St and 11th St |
UAP | 2024 | Design | 400,000 | 500,000 | |
BELLINGHAM Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 500,000 | 500,000 | |
BENTON CITY 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 305,111 | 321,169 | |
BLAINE Boblett Street Yew Ave to Ludwick Ave |
UAP | 2022 | Design | 1,161,862 | 3,190,964 | |
BONNEY LAKE LED Streetlight Conversion Citywide |
LED | 2025 | Application | 157,500 | 157,500 | |
BOTHELL Meridian Avenue Roundabout 240th St Roundabout |
UAP | 2025 | Construction | 693,951 | 1,875,121 | |
BREMERTON E 11th Street and Perry Avenue Pitt Avenue to E 17th Street |
UAP | 2020 | Construction | 4,341,916 | 7,287,140 | |
BREMERTON Washington Avenue / 11th Street Pacific Ave to Manette Bridge |
UAP | 2023 | Construction | 1,742,143 | 7,260,650 | |
BREMERTON Wheaton Way and E 11th Street Sidewalk Wheaton Way and E 11th St Nipsic Ave to Trenton Ave |
SP | 2023 | Construction | 106,400 | 140,000 | |
BREWSTER 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 12,974 | 13,657 | |
BREWSTER Old Hwy 97 US 97 to North C/L |
SCAP | 2024 | Construction | 169,288 | 1,419,776 | |
BRIER 2022 Overlay Award Multiple Locations |
APP | 2024 | Bid Auth | 1,045,500 | 1,230,000 | |
BUCKLEY Hinkleman Road Rehabilitation Hinkleman Ext to 28307 Hinkleman Rd |
APP | 2023 | Construction | 278,472 | 333,585 | |
BUCKLEY Foothills Trail Crossing Main St |
ATP | 2024 | Construction | 219,276 | 274,113 | |
BURIEN S 136th Street 1st Ave S to Des Moines Memorial Dr S |
UAP | 2023 | Construction | 4,121,540 | 5,857,312 | |
BURIEN SW 148th Street 4th Ave SW to 6th Ave SW |
UAP | 2024 | Design | 3,932,160 | 4,915,200 | |
BURLINGTON 2024 Overlay Multiple Locations |
APP | 2025 | Bid Auth | 671,500 | 790,000 | |
BURLINGTON East-West Connector Burlington Blvd to Walnut Street |
UAP | 2019 | Construction | 2,688,618 | 5,626,051 | |
BURLINGTON LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 150,000 | 150,000 | |
CAMAS NW 38th Avenue NW Parker St to Grass Valley Park |
UAP | 2025 | Bid Auth | 1,692,384 | 6,736,683 | |
CARBONADO 7th Street Sidewalk OFerrell Dr to Wingate Dr |
ATP | 2024 | Construction | 179,482 | 188,928 | |
CARNATION 2024 Seal Coat Multiple Locations |
SCPP | 2025 | Design | 154,000 | 162,850 | |
CARNATION Milwaukee Avenue Overlay Entwistle St to NE 50th St |
SCPP | 2025 | Design | 467,444 | 492,046 | |
CARNATION E Bird Street E Commercial St to Milwaukee Ave |
SCAP | 2024 | Construction | 546,400 | 642,824 | |
CARNATION McKinley Street Eugene St to Blanche St |
SCAP | 2024 | Construction | 459,422 | 839,209 | |
CASHMERE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 220,281 | 231,875 | |
CASHMERE Sunset Highway City Limits to Mill Site |
SCAP | 2023 | Construction | 250,000 | 1,636,627 | |
CASTLE ROCK 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 47,500 | 50,000 | |
CENTRALIA Galvin Street Overlay Harrison Ave to Chehalis River Bridge |
APP | 2024 | Construction | 829,784 | 1,033,017 | |
CENTRALIA S Gold Street Main St to Summa St |
UAP | 2024 | Design | 1,194,902 | 1,405,768 | |
CHEHALIS 2024 National Avenue Overlay NE Washington Ave to NW Chamber of Commerce Way |
APP | 2025 | Design | 623,700 | 693,000 | |
CHEHALIS SW 13th Street Sidewalk SW William Ave to S Market Blvd |
ATP | 2025 | Design | 269,100 | 299,000 | |
CHELAN 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 41,687 | 46,319 | |
CHELAN Sanders Street Pedestrian Improvements E Okanogan Ave and E Wapato Ave |
SCAP | 2025 | Design | 99,999 | 819,759 | |
CHELAN Lakeside Trail W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave. |
ATP | 2025 | Design | 500,000 | 3,602,414 | |
CHELAN Resin Bonded Stone Surfacing Pilot Bradley and Johnson Intersection Vicinity |
ATP | 2025 | Design | 163,800 | 182,000 | |
CHELAN COUNTY Easy St and School St Intersection School Street Roundabout |
UAP | 2025 | Design | 800,000 | 2,431,217 | |
CHENEY Elm Street Overlay 6th Street Vicinity to Washington Street |
APP | 2025 | Design | 1,884,892 | 2,094,324 | |
CHENEY N 6th Street Roundabout Betz Road |
UAP | 2024 | Design | 966,854 | 1,074,283 | |
CHEWELAH 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 54,587 | 57,460 | |
CHEWELAH 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 171,732 | 180,771 | |
CHEWELAH W Main Avenue SR 395 to Hunt St |
SCAP | 2024 | Design | 1,117,660 | 1,189,000 | |
CLARK COUNTY NE 99th Street NE 94th Ave to vicinity of NE 117th Ave (SR 503) |
UAP | 2022 | Construction | 3,150,000 | 16,640,330 | |
CLARK COUNTY NE 152nd Avenue Padden Pkwy to NE 99th St |
UAP | 2025 | Design | 3,500,000 | 8,967,367 | |
CLARK COUNTY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 750,000 | 750,000 | |
CLARK COUNTY NE Hazel Dell Avenue NE 99th St to NE 117th St |
SP | 2021 | Construction | 300,000 | 1,795,000 | |
CLARK COUNTY NE 68th Street Sidewalk Highway 99 to NE St Johns Rd |
SP | 2023 | Construction | 400,000 | 5,680,037 | |
CLARK COUNTY Truman School Sidewalk NE 40th Ave and NE 44th St |
ATP | 2024 | Design | 200,000 | 430,000 | |
CLE ELUM 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 62,017 | 65,281 | |
CLE ELUM First Street Pennsylvania Ave to Harris Ave |
SCAP | 2024 | Construction | 718,849 | 1,096,846 | |
CLE ELUM Second Street Roundabout Second St (SR 903) and Stafford Ave |
SCAP | 2024 | Design | 704,591 | 741,675 | |
CLE ELUM First Street - Phase 3 Oakes Ave to Peoh Ave |
SCAP | 2025 | Construction | 677,032 | 5,499,790 | |
CLE ELUM Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 350,000 | 350,000 | |
CLE ELUM 2nd Street multi-use path Pennsylvania Avenue toward Short Avenue |
CSP | 2026 | Design | 500,000 | 526,316 | |
CLE ELUM Second Street Pathway - Phase 1 N Stafford Ave to N Pennsylvania Ave |
ATP | 2025 | Design | 497,767 | 523,965 | |
CLYDE HILL 2024 Overlay Multiple Locations |
SCPP | 2025 | Construction | 137,444 | 196,342 | |
COLFAX 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 140,000 | 147,368 | |
COLFAX 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 2,000,000 | 2,105,263 | |
COLFAX Morton and Sumner Streets Morton Tyler to 4th Sumner 1st to 4th |
SCAP | 2024 | Construction | 914,124 | 1,336,805 | |
COLLEGE PLACE NE Damson Avenue Cargill Ave to Rose St |
UAP | 2024 | Bid Auth | 1,126,706 | 1,251,896 | |
COLLEGE PLACE SW Mojonnier Road Improvements College Ave to Bluvue Ln |
UAP | 2025 | Design | 1,922,008 | 6,772,008 | |
COLLEGE PLACE NE Rose Street Pedestrian Lights NE Carey Court to NE Ash Avenue |
CSP | 2026 | Application | 487,160 | 541,290 | |
COLLEGE PLACE SE 8th Street Sidewalk Birch Ave to Larch Ave |
ATP | 2025 | Design | 657,900 | 731,000 | |
COLTON 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 252,037 | 252,037 | |
COLVILLE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 77,273 | 81,340 | |
CONCONULLY 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 114,500 | 114,500 | |
CONCRETE Secondary Access SR 20 to Airport Way |
SCAP | 2023 | Design | 500,000 | 3,414,000 | |
CONNELL 2024 Chip Seal W Clark Street |
SCPP | 2025 | Bid Auth | 154,329 | 162,452 | |
CONNELL School zone and speed feedback signs Cemetary Road to 5th Avenue |
CSP | 2026 | Application | 95,000 | 100,000 | |
COSMOPOLIS LED Streetlight Conversion City Owned |
LED | 2024 | Construction | 28,670 | 28,670 | |
COULEE CITY Walnut Street Overlay 4th St to Mc Entee St |
SCAP | 2024 | Construction | 58,736 | 438,074 | |
COULEE CITY McEntee Street Improvements Walnut St to Chelan St |
SCAP | 2025 | Design | 124,201 | 920,000 | |
COULEE DAM 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 546,185 | 546,185 | |
COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Design | 481,406 | 481,406 | |
COUPEVILLE 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 182,685 | 192,299 | |
COUPEVILLE Front and N Main Street Sidewalks Multiple Locations |
ATP | 2024 | Design | 325,123 | 871,514 | |
COVINGTON Lakepointe Boulevard SR 18 to SE 258th St |
UAP | 2021 | Construction | 994,019 | 1,362,939 | |
DAVENPORT 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 237,729 | 237,729 | |
DAYTON FY 2022 Overlay Project Multiple Locations |
SCPP | 2022 | Construction | 445,185 | 522,450 | |
DAYTON 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 2,000,000 | 2,105,263 | |
DAYTON N 3rd Street Main St to Dayton Ave |
SCAP | 2023 | Construction | 1,593,941 | 1,682,833 | |
DAYTON Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 80,000 | 80,000 | |
DAYTON S. 4th Street sidewalk E Main Street to Mustard Street |
CSP | 2026 | Application | 696,350 | 733,000 | |
DES MOINES 24th Avenue S Kent-Des Moines Rd (SR 516) to S 223rd St |
UAP | 2021 | Construction | 4,212,947 | 7,493,224 | |
DOUGLAS COUNTY 21st St NE N Baker Ave to N Devon Ave |
UAP | 2025 | Design | 1,518,791 | 1,786,813 | |
DUPONT LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 11,550 | 11,550 | |
DUVALL NE 150th Street Overlay 275th Ave NE to 280th Pl NE |
APP | 2025 | Bid Auth | 403,750 | 475,000 | |
DUVALL 142nd Place sidewalk - Phase 2 275th Avenue NE to 278th Avenue NE |
CSP | 2026 | Design | 400,000 | 674,000 | |
DUVALL Main Street (SR 203) / Cherry Street RRFB NE Cherry St Crossing |
ATP | 2025 | Construction | 62,767 | 73,903 | |
EAST WENATCHEE 2022 Overlay Award McGee St SE to Grant Rd |
APP | 2024 | Construction | 402,239 | 499,017 | |
EAST WENATCHEE 3rd Street SE Rock Island Rd Intersection |
UAP | 2023 | Construction | 805,588 | 1,447,705 | |
EAST WENATCHEE 19th Street NW Phase 1 SR 28 to Bella Rio Apartments |
UAP | 2024 | Bid Auth | 2,000,000 | 4,558,136 | |
EAST WENATCHEE 5th Street NE Safety and Multimodal Improvements N Baker Ave to N Kentucky Ave |
UAP | 2025 | Design | 2,500,000 | 2,995,175 | |
EAST WENATCHEE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
EATONVILLE Eatonville Pavement Preservation Multiple Locations |
SCPP | 2025 | Design | 130,720 | 137,600 | |
EATONVILLE View Crest Drive and Center Street Center St W to Dow Ridge Dr |
SCAP | 2024 | Construction | 336,912 | 363,021 | |
EATONVILLE Washington Avenue North (SR 161) Lynch Creek Rd E to 250 ft N of Center St E |
SCAP | 2021 | Construction | 155,125 | 3,277,132 | |
EATONVILLE West Eatonville Sidewalk Improvements Multiple Locations |
ATP | 2025 | Design | 399,076 | 420,080 | |
EDMONDS Main Street complete streets improvements 6th Avenue to 8th Avenue |
CSP | 2026 | Application | 391,215 | 1,328,715 | |
ELECTRIC CITY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 335,054 | 335,054 | |
ELECTRIC CITY 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 155,000 | 155,000 | |
ELLENSBURG Pfenning Road Sidewalk 240ft n/o Vantage Hwy to Radio Rd |
UAP | 2024 | Bid Auth | 1,390,000 | 2,138,500 | |
ELLENSBURG Pedestrian Improvements Multiple Locations |
CSP | 2026 | Application | 500,000 | 588,235 | |
ELMA 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Bid Auth | 950,000 | 1,000,000 | |
ELMA W Main Street ADA 16th St to 18th St |
ATP | 2025 | Design | 434,720 | 457,600 | |
ELMA Main Street RRFBs 4th St to 11th St |
ATP | 2025 | Design | 231,800 | 244,000 | |
ENDICOTT 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 31,690 | 31,690 | |
ENTIAT 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 76,190 | 80,200 | |
ENUMCLAW 2024 Overlay Multiple Locations |
APP | 2025 | Construction | 264,458 | 311,128 | |
ENUMCLAW 244th Avenue Roundabout Roosevelt Ave |
UAP | 2024 | Construction | 641,728 | 1,131,577 | |
ENUMCLAW In Fill Sidewalk Various gaps |
ATP | 2024 | Construction | 380,504 | 504,623 | |
EPHRATA Nat Washington Way Overlay A Street SE to 2nd Ave SE |
APP | 2024 | Design | 563,134 | 625,705 | |
EVERSON S Harkness Street W Main St to Lincoln St |
SCAP | 2025 | Design | 683,671 | 719,654 | |
FAIRFIELD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 19,800 | 19,800 | |
FAIRFIELD 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Design | 111,514 | 111,514 | |
FARMINGTON 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 722,645 | 722,645 | |
FEDERAL WAY S 288th Street 16th Ave S to 34th Ave S |
UAP | 2022 | Design | 2,000,000 | 3,240,000 | |
FEDERAL WAY Pacific Highway S (SR 99) S C/L to Weigh Station |
UAP | 2023 | Design | 2,500,000 | 3,770,000 | |
FEDERAL WAY SR 99 pedestrian improvements S 304th Street to S 308th Street |
CSP | 2026 | Application | 120,800 | 151,000 | |
FEDERAL WAY Citywide Pedestrian Crossings RRFB Crossings |
ATP | 2024 | Design | 350,001 | 503,211 | |
FERNDALE Thornton Street Malloy Avenue to 2nd Avenue Roundabout |
UAP | 2020 | Construction | 2,495,394 | 23,013,259 | |
FERNDALE Ferndale Terrace Hendrickson Ave to Vista Dr |
UAP | 2025 | Design | 2,855,316 | 5,988,666 | |
FIFE N Levee Road Overlay 70th Ave E to Freeman Rd E |
APP | 2024 | Construction | 587,941 | 804,318 | |
FIFE 20th Street E Multimodal Improvements 5410 20th St E to 62nd Ave E |
UAP | 2025 | Design | 3,990,000 | 4,988,816 | |
FIRCREST 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 678,470 | 753,856 | |
FIRCREST 2024 Overlay Multiple Locations |
APP | 2025 | Design | 677,409 | 801,952 | |
FORKS West E Street 5th Ave to S Forks Ave (SR 101) |
SCAP | 2025 | Design | 549,613 | 578,540 | |
FRIDAY HARBOR 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 99,324 | 110,360 | |
FRIDAY HARBOR Marguerite Place Spring St to Park St |
SCAP | 2023 | Design | 800,000 | 1,565,314 | |
GEORGE 2022 Overlay Award Washington Wy to E Deacon St |
SCPP | 2024 | Construction | 420,770 | 420,770 | |
GEORGE 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Closeout | 8,518 | 8,518 | |
GEORGE Washington Way N Richmond Ave to Frontage Rd |
SCAP | 2023 | Construction | 987,057 | 1,039,007 | |
GIG HARBOR Wollochet Drive Signal Wagner Way |
UAP | 2025 | Bid Auth | 1,067,000 | 1,334,360 | |
GIG HARBOR Burnham Drive Sidewalk Eagles Club Driveway to 96th St |
ATP | 2025 | Bid Auth | 1,524,574 | 4,731,669 | |
GOLD BAR 9th Street Overlay Multiple Locations |
SCPP | 2025 | Design | 191,150 | 201,140 | |
GOLD BAR 2024 Seal Coat Multiple Locations |
SCPP | 2025 | Design | 158,500 | 166,760 | |
GRAND COULEE 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 78,980 | 78,980 | |
GRAND COULEE 2022 Crack Seal Citywide |
SCPP | 2024 | Construction | 84,280 | 84,280 | |
GRAND COULEE James Saunder Street and Fortuyn Road Burdin Blvd to 2nd St |
SCAP | 2024 | Construction | 824,918 | 824,918 | |
GRAND COULEE Spokane Way Improvements Alcan Rd to E Grand Coulee Ave (SR 174) |
SCAP | 2025 | Design | 126,876 | 1,015,000 | |
GRANDVIEW Wine Country Road Overlay Euclid St to Grandridge Rd |
APP | 2025 | Design | 470,790 | 523,100 | |
GRANDVIEW Wine Country Road McCreadie Rd Intersection |
UAP | 2023 | Construction | 1,582,684 | 1,775,353 | |
GRANGER Main Street Phase 1 1st St to 2nd St |
SCAP | 2023 | Construction | 1,061,439 | 1,268,144 | |
GRANITE FALLS Alpine Street Overlay Multiple Locations |
SCPP | 2025 | Design | 232,600 | 261,900 | |
GRANITE FALLS Galena Street Extension Stanley St to Portage Ave |
SCAP | 2023 | Construction | 690,000 | 2,293,458 | |
GRANITE FALLS W Stanley Street Sidewalk Jordan Rd to Prospect Ave |
ATP | 2024 | Design | 496,400 | 522,600 | |
HARTLINE 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 133,667 | 133,667 | |
HATTON 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 450,000 | 450,000 | |
HOQUIAM City of Hoquiam Safe Routes to School City of Hoquiam |
ATP | 2024 | Design | 361,000 | 1,801,000 | |
ISSAQUAH 12th Avenue NW SR 900 to Lake Dr |
UAP | 2023 | Construction | 3,000,000 | 5,904,859 | |
KALAMA 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 165,300 | 174,000 | |
KALAMA China Garden Road S 10th St to Gwynne Rd |
SCAP | 2025 | Design | 858,069 | 903,230 | |
KALAMA LED Streetlight Conversion PUD Owned |
LED | 2024 | Construction | 33,623 | 33,623 | |
KELSO LED Streetlight Conversion PUD Owned |
LED | 2024 | Construction | 145,589 | 145,589 | |
KENMORE 73rd Avenue NE NE 181st St and NE 192nd St |
UAP | 2024 | Construction | 920,000 | 1,650,135 | |
KENMORE NE 170 Street ped/bike improvements Juanita Drive to 72nd Avenue NE |
CSP | 2026 | Bid Auth | 185,120 | 231,400 | |
KENNEWICK Columbia Center Boulevard Deschutes Ave Intersection |
UAP | 2023 | Construction | 1,472,000 | 2,395,667 | |
KENNEWICK Citywide ADA Improvements Multiple Locations |
CSP | 2026 | Bid Auth | 327,790 | 409,745 | |
KENT Reith Road 140ft s/o S 253rd St to 200ft w/o SR 516 |
UAP | 2023 | Construction | 1,834,250 | 5,437,988 | |
KENT 76th Avenue S South Phase 2600ft s/o S 212th St to 3660 ft s/o S 212th St |
UAP | 2025 | Construction | 2,654,664 | 15,224,824 | |
KENT 132nd Avenue SE multi-use path SE 228th Place to SE 240th Street |
CSP | 2026 | Construction | 471,601 | 1,655,318 | |
KENT RRFB Crossings Various |
ATP | 2025 | Design | 104,461 | 139,999 | |
KETTLE FALLS 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 89,825 | 95,102 | |
KING COUNTY 68th Avenue S / S 124th Street Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St |
UAP | 2023 | Design | 1,706,037 | 2,132,547 | |
KING COUNTY Redmond Ridge Dr NE Roundabout NE Alder Crest Dr |
UAP | 2024 | Construction | 907,859 | 1,723,869 | |
KIRKLAND 100th Avenue NE NE 138th Pl to NE 145th St |
UAP | 2021 | Construction | 3,300,000 | 21,430,791 | |
KIRKLAND 116th Avenue NE sidewalk improvements NE 73rd Street to NE 75th Street |
CSP | 2026 | Application | 500,000 | 871,383 | |
KIRKLAND RRFB project Crosswalk at 124th Ave NE and NE 104th Street |
CSP | 2026 | Application | 104,800 | 133,355 | |
KIRKLAND 132nd Avenue NE NE 110th Pl to NE 97th St |
SP | 2023 | Design | 125,001 | 483,590 | |
KIRKLAND Pedestrian Crossing at Lake Washington Institute of Technology 132nd Ave NE |
ATP | 2025 | Design | 265,000 | 351,700 | |
KITSAP COUNTY Greaves Way Old Frontier Rd Roundabout |
UAP | 2021 | Construction | 1,422,550 | 2,308,242 | |
KITSAP COUNTY SE Lund Avenue Harris Rd SE Intersection |
UAP | 2023 | Design | 3,664,358 | 4,585,448 | |
KITSAP COUNTY Lund Avenue Roundabout Chase Rd Roundabout |
UAP | 2025 | Design | 2,668,198 | 3,335,249 | |
KITTITAS 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 51,826 | 54,522 | |
KITTITAS E 1st Avenue Main St to East C/L |
SCAP | 2020 | Construction | 87,751 | 650,002 | |
LA CONNER Pedestrian Improvements Multiple Locations |
CSP | 2026 | Design | 240,000 | 274,900 | |
LACEY College Street NE Martin Way to 15th Ave NE |
UAP | 2022 | Design | 2,830,000 | 4,800,000 | |
LACROSSE Main Avenue and 2nd Street Sidewalk 2nd Street from Main Ave to Crystal Ave |
SP | 2023 | Construction | 585,040 | 585,040 | |
LAKE FOREST PARK SR 104 40th Pl NE Roundabout |
UAP | 2021 | Design | 2,561,198 | 3,240,000 | |
LAKE STEVENS 91st Avenue SE / 24th Street SE / S Lake Stevens Road 21st St SE to W leg of SR 9 Roundabout |
UAP | 2022 | Construction | 3,000,000 | 12,843,514 | |
LAKEWOOD Washington Boulevard / Edgewood Avenue / North Gate Road W C/L to Interlaaken Dr |
UAP | 2023 | Construction | 3,784,273 | 9,705,998 | |
LAKEWOOD S Tacoma Way Signal 92nd St S |
UAP | 2025 | Design | 750,000 | 1,250,000 | |
LAKEWOOD Custer Road W Bridgeport Way SW to 75th ST W |
UAP | 2025 | Design | 2,976,687 | 3,720,858 | |
LAKEWOOD Steilacoom Boulevard SW Sidewalk 87th Ave SW to Weller Rd SW |
SP | 2023 | Bid Auth | 442,680 | 4,963,000 | |
LANGLEY Saratoga Road De Bruyn Ave to W C/L |
SCAP | 2025 | Bid Auth | 540,000 | 568,670 | |
LEAVENWORTH 2024 Scrub Seal - Red Town InitiativeIncre Multiple Locations |
SCPP | 2024 | Bid Auth | 1,575,000 | 1,750,000 | |
LEAVENWORTH 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 90,000 | 100,000 | |
LEAVENWORTH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
LEAVENWORTH Ski Hill Drive Sidewalk Evans St and SR 2 |
SP | 2023 | Construction | 383,965 | 535,859 | |
LEAVENWORTH Curb Ramp Improvements Multiple Locations |
ATP | 2025 | Design | 277,992 | 308,880 | |
LIND 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Design | 128,471 | 128,471 | |
LONG BEACH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
LONG BEACH 2nd Street NE Sidewalk Washington Ave S to 600ft e/o Washington Ave S |
ATP | 2025 | Design | 336,300 | 354,000 | |
LONGVIEW 46th Avenue SR 4 to Olympia Way |
UAP | 2021 | Construction | 3,331,544 | 5,919,825 | |
LONGVIEW Olympia Way and Nichols Blvd Multiple Locations |
UAP | 2025 | Design | 2,606,400 | 3,258,000 | |
LONGVIEW Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 | |
LONGVIEW 18th Avenue ADA Ramps Louisiana Street to Olympia Way |
CSP | 2026 | Design | 213,000 | 275,000 | |
LYNDEN 2024 1st Street Overlay Riverview Rd to Grover St |
APP | 2025 | Bid Auth | 779,306 | 974,132 | |
LYNNWOOD Poplar Way Bridge 196th St SW to Alderwood Mall Blvd |
UAP | 2024 | Design | 5,000,000 | 42,085,000 | |
MABTON 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Design | 105,510 | 105,510 | |
MABTON Main Street Reconstruction Project Washington St to SR 22 |
SCAP | 2022 | Construction | 295,963 | 2,381,514 | |
MABTON Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
MALDEN 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Design | 15,000 | 15,000 | |
MANSFIELD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 127,825 | 127,825 | |
MAPLE VALLEY Maple Valley Highway (SR 169) SE 253rd Pl to SE 260th St |
UAP | 2024 | Bid Auth | 3,500,000 | 20,220,000 | |
MAPLE VALLEY Crosswalk safety RRFB Multiple Locations |
CSP | 2026 | Design | 334,080 | 417,600 | |
MAPLE VALLEY SE Kent Kangley Road (SR 516) Sidewalk 800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE |
ATP | 2025 | Design | 742,383 | 927,980 | |
MARYSVILLE State Avenue 104th Pl NE to 116th St NE |
UAP | 2022 | Construction | 4,250,000 | 8,583,489 | |
MARYSVILLE 156th Street NE Smokey Pt Blvd to Hayho Creek |
UAP | 2025 | Design | 1,440,000 | 1,800,000 | |
MARYSVILLE Citywide ADA Ramps Multiple Locations |
CSP | 2026 | Application | 460,300 | 5,631,455 | |
MARYSVILLE RRFB project Multiple locations |
CSP | 2026 | Application | 47,740 | 62,267 | |
MARYSVILLE 53rd Ave NE Shared Used Path 61st St NE to SR 528 |
ATP | 2024 | Bid Auth | 320,000 | 412,000 | |
MATTAWA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 100,000 | 100,000 | |
MCCLEARY W Maple Street Sidewalk S 6th St to S Main St |
ATP | 2025 | Design | 495,843 | 521,940 | |
MEDICAL LAKE 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Construction | 312,528 | 328,976 | |
MEDICAL LAKE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 43,560 | 45,853 | |
MEDICAL LAKE 2024 Scrub and Chip Seal - Red Town Multiple Locations |
SCPP | 2025 | Design | 702,129 | 739,082 | |
MEDICAL LAKE Barker Street Lefevre St (SR 902) to Stanley St |
UAP | 2023 | Construction | 750,841 | 834,268 | |
MEDICAL LAKE Lefevre Street (SR 902) Ped/Bike Improvements Hancock Street North to Brooks Road |
CSP | 2026 | Application | 1,586,720 | 1,688,000 | |
MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Design | 639,400 | 695,000 | |
MEDINA Upland Road Overlay Overlake Drive W to NE 6th St |
SCPP | 2024 | Construction | 233,351 | 264,279 | |
MEDINA 2024 Overlay Multiple Locations |
SCPP | 2025 | Bid Auth | 138,744 | 154,160 | |
MEDINA NE 24th Street ADA Upgrade Evergreen Point Rd to 84th Ave |
ATP | 2025 | Bid Auth | 270,270 | 300,300 | |
MESA 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 454,604 | 454,604 | |
MILLWOOD Argonne Road Reconstruction - Phase 2 E Trent Ave to 150 ft s/o S Frederick Ave |
SCAP | 2025 | Design | 1,409,230 | 1,483,400 | |
MILLWOOD Argonne Road Reconstruction - Phase 1 150 ft s/o Frederick to N of Riverway |
SCAP | 2025 | Design | 1,278,255 | 4,448,347 | |
MILTON 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 485,760 | 571,488 | |
MILTON Pacific Highway S (SR 99) Porter Way Intersection |
UAP | 2021 | Construction | 3,380,530 | 3,980,616 | |
MONROE 2022 Overlay Award Multiple Locations |
APP | 2024 | Bid Auth | 798,445 | 1,140,637 | |
MONROE RRFB Crossings City of Monroe |
ATP | 2025 | Design | 228,900 | 298,000 | |
MONTESANO 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 64,600 | 68,000 | |
MONTESANO 2024 W Pioneer Avenue Overlay Multiple Locations |
SCPP | 2025 | Design | 340,000 | 362,400 | |
MONTESANO 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Design | 216,000 | 230,700 | |
MONTESANO W. Pioneer Avenue Main to 4th |
SCAP | 2024 | Construction | 155,610 | 1,668,625 | |
MORTON 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Design | 1,092,500 | 1,150,000 | |
MORTON 2022 Overlay Award City Wide |
SCAP | 2024 | Design | 463,420 | 635,000 | |
MOSES LAKE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 105,000 | 105,000 | |
MOUNT VERNON Laventure Road Hoag Rd to Sigmar Ln |
UAP | 2025 | Design | 1,208,800 | 1,536,000 | |
MOUNTLAKE TERRACE 66th Avenue W 220th St SW to N City Limits |
UAP | 2021 | Construction | 2,503,000 | 3,433,637 | |
MOUNTLAKE TERRACE 56th Avenue W 170ft n/o 236th St SW to 475ft n/o 230th St SW |
UAP | 2024 | Design | 5,000,000 | 18,537,805 | |
MOXEE Pedestrian Improvements Multiple Locations |
CSP | 2026 | Application | 447,759 | 497,510 | |
MUKILTEO Harbour Pointe Blvd. paved path 47th Place Way to Cyrus Way |
CSP | 2026 | Application | 500,000 | 1,228,207 | |
NACHES Downtown Revitalization Plan W 2nd Street to W 3rd Street |
CSP | 2026 | Application | 71,250 | 75,000 | |
NAPAVINE 2nd Ave SE Overlay Washington St to RR tracks |
SCPP | 2025 | Design | 183,509 | 193,168 | |
NEWPORT 2024 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 126,426 | 142,080 | |
NORMANDY PARK 1st Avenue Sidewalk S 174th St to SW 176th St |
SP | 2023 | Construction | 505,840 | 728,000 | |
NORTH BEND 2024 Overlay Multiple Locations |
APP | 2025 | Design | 974,497 | 1,146,466 | |
NORTH BEND Sidewalk gaps Multiple Locations |
CSP | 2026 | Application | 500,000 | 1,437,500 | |
NORTH BEND SR202 Sidewalk Gap North Bend Way to RR Tracks |
ATP | 2025 | Design | 133,819 | 157,435 | |
NORTH BONNEVILLE Cascade Drive and Hot Springs Way Varies |
SCAP | 2025 | Design | 299,958 | 315,746 | |
OAK HARBOR W Whidbey Avenue Overlay SW Jib St to Oak Harbor St |
APP | 2024 | Closeout | 385,171 | 480,044 | |
OAK HARBOR NE 7th Avenue e/o Oak Harbor St to Harvest Dr |
UAP | 2024 | Bid Auth | 837,185 | 2,040,000 | |
OAK HARBOR LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 220,000 | 220,000 | |
OAKVILLE 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Design | 500,000 | 500,000 | |
OAKVILLE School Street and W Pine Street SR 12 to Ash St and SR 12 to School St |
SCAP | 2024 | Design | 638,743 | 638,743 | |
ODESSA 2024 Maintenance Project Multiple Locations |
SCPP | 2025 | Design | 190,630 | 190,630 | |
OKANOGAN 2023 Maintenance Project Citywide |
SCPP | 2024 | Construction | 200,884 | 211,457 | |
OKANOGAN 3rd Avenue Improvements Irene St to Greta St |
SCAP | 2025 | Design | 1,235,000 | 1,300,000 | |
OKANOGAN Oak Street 2nd Ave to Bridge e/o 1st Ave |
SCAP | 2023 | Construction | 66,591 | 503,263 | |
OLYMPIA Fones Road SE Pacific Ave SE to 18th Ave SE |
UAP | 2023 | Bid Auth | 2,000,000 | 14,215,487 | |
OLYMPIA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
OMAK 2022 Chip Seal Award Multiple Locations |
SCPP | 2024 | Design | 87,495 | 92,100 | |
OMAK 2023 Maintenance Project Citywide |
SCPP | 2024 | Construction | 243,615 | 256,437 | |
OMAK 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 61,429 | 64,662 | |
OMAK Jonathan Avenue Pine St to Quince St |
SCAP | 2025 | Design | 792,300 | 834,000 | |
OMAK Central Ave Reconstruction Phase II Cedar St to Fir St |
SCAP | 2025 | Design | 940,405 | 989,900 | |
OMAK Engh Road Omache Dr to Omak River Rd |
SCAP | 2020 | Construction | 148,450 | 1,099,632 | |
OROVILLE 2021 Seal Coat Multiple Locations |
SCPP | 2023 | Construction | 251,574 | 264,815 | |
OROVILLE Ironwood Street 12th Ave to 17th Ave |
SCAP | 2024 | Bid Auth | 1,195,480 | 1,258,400 | |
OROVILLE Central Avenue W W C/L to Main St (SR 97) |
SCAP | 2020 | Construction | 73,827 | 546,865 | |
ORTING Kansas Street Reconstruction SR 162 to Coe Ln |
UAP | 2025 | Design | 4,420,363 | 4,911,515 | |
ORTING LED Streetlight Conversion Citywide |
LED | 2025 | Application | 49,000 | 49,000 | |
OTHELLO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 | |
PACIFIC Ellingson Overlay West Valley Hwy to UPRR Crossing |
APP | 2025 | Design | 1,607,270 | 1,786,103 | |
PACIFIC Stewart Road (8th Street East) Valentine Avenue to Butte Avenue |
UAP | 2019 | Construction | 4,877,200 | 6,601,970 | |
PACIFIC New sidewalks Multiple Locations |
CSP | 2026 | Design | 539,750 | 635,000 | |
PACIFIC Interurban Trail Crossing Improvements Ellingson Rd |
ATP | 2025 | Design | 79,240 | 88,044 | |
PACIFIC LED Streetlight Conversion PSE Owned |
LED | 2020 | Construction | 110,250 | 110,250 | |
PALOUSE Complete Streets Award March 2019 Selection |
CSP | 2020 | Construction | 200,000 | 200,000 | |
PASCO Lewis Street 2nd Ave to Oregon Ave (SR 397) |
UAP | 2021 | Construction | 7,000,000 | 25,690,769 | |
PASCO Court Street Roundabout Rd 68 Roundabout |
UAP | 2025 | Bid Auth | 1,600,000 | 3,278,900 | |
PATEROS Commercial Avenue Multimodal Improvements Lakeshore Drive to S Dawson Street |
CSP | 2026 | Design | 881,239 | 981,239 | |
PATEROS Downtown ADA Improvements Multiple Locations |
ATP | 2024 | Design | 489,877 | 489,877 | |
PATEROS Resin Bonded Stone Surfacing Pilot Intersection Vicinity |
ATP | 2025 | Design | 136,000 | 136,000 | |
PE ELL Main Street Chehalis Ave to SR 6 |
SCAP | 2024 | Construction | 421,869 | 422,869 | |
PE ELL Main Street Sidewalk E 7th Ave to E 6th Ave |
ATP | 2024 | Construction | 55,190 | 55,190 | |
PIERCE COUNTY Canyon Rd E 400 ft N of 84th St E to 530 ft N of 72nd St E |
UAP | 2022 | Construction | 4,000,000 | 8,535,329 | |
PIERCE COUNTY Canyon Road E 208th St E to 200th St E |
UAP | 2023 | Construction | 2,000,000 | 11,403,610 | |
PIERCE COUNTY 122nd Avenue E 146th St Ct E to 136th St E |
UAP | 2025 | Design | 5,000,000 | 18,501,901 | |
PIERCE COUNTY Pedestrian improvements Multiple Locations |
CSP | 2026 | Bid Auth | 403,486 | 504,358 | |
PIERCE COUNTY 2025 RRFB School Crossing Gem Height Dr @ 94th Ave E and 182nd St E and Ainsworth Ave S @ Garfield St |
ATP | 2025 | Design | 619,840 | 824,000 | |
PORT ANGELES 2024 Marine Drive Overlay Tumwater Truck Route to Hill Street |
APP | 2025 | Construction | 534,558 | 848,451 | |
PORT ANGELES 8th Street Lincoln St to A St |
UAP | 2024 | Design | 1,464,365 | 1,904,365 | |
PORT ORCHARD Bethel Avenue Bethel Rd, Lincoln Ave SE, Mitchell Rd SE |
UAP | 2023 | Construction | 985,493 | 1,241,866 | |
PORT ORCHARD Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 650,000 | 650,000 | |
PORT ORCHARD LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 200,000 | 200,000 | |
PORT TOWNSEND Tyler Street Overlay Jefferson St to Lawrence St |
APP | 2024 | Design | 379,355 | 446,299 | |
PORT TOWNSEND Discovery Road Rainier St to McClellan St |
UAP | 2022 | Construction | 2,481,424 | 5,566,751 | |
PORT TOWNSEND Lawrence Street Pedestrian Improvements Harrison Street to Tyler Street |
CSP | 2026 | Application | 493,500 | 583,500 | |
PORT TOWNSEND Washington Street and Walker Street Improvements Washington St and Gaines St to Walker St and Jefferson St |
ATP | 2025 | Design | 198,600 | 234,000 | |
POULSBO Noll Road and Johnson Parkway SR 305 to Storhoff Rd/Noll Rd Intersection |
UAP | 2020 | Construction | 1,500,000 | 15,135,712 | |
POULSBO Noll Road - Segment 3A Mesford Rd to NE Kevos Pond Dr |
UAP | 2022 | Design | 1,360,000 | 3,020,000 | |
POULSBO Noll Road Phase 3B Lincoln Rd NE to Kevos Pond Dr |
UAP | 2024 | Design | 1,200,000 | 3,868,100 | |
POULSBO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
POULSBO LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 175,000 | 175,000 | |
PROSSER Old Inland Empire Highway Sidewalk W C/L to Wine Country Rd |
ATP | 2024 | Construction | 168,425 | 1,720,086 | |
PROSSER Wine Country Road Lower Yakima Valley Pathway Connection Wine County Rd to Lower Yakima Valley Pathway Connection |
ATP | 2025 | Construction | 69,939 | 82,710 | |
PULLMAN Military Hill Overlay Hall Drive and Stadium Way from Orion Drive southeast to Highway 27 |
APP | 2025 | Construction | 530,288 | 680,854 | |
PULLMAN Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 750,000 | 750,000 | |
PULLMAN Downtown complete streets Grand Avenue to Spring Street |
CSP | 2026 | Application | 1,000,000 | 1,177,875 | |
PUYALLUP 7th Street Sidewalk 9th St to 11th St |
ATP | 2024 | Design | 350,000 | 579,000 | |
RAYMOND 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Bid Auth | 1,520,000 | 1,600,000 | |
RAYMOND 2024 SW Raymond Overlay Multiple Locations |
SCPP | 2025 | Design | 563,744 | 593,411 | |
RAYMOND Downtown Pedestrian Improvements Multiple Locations |
CSP | 2026 | Design | 550,000 | 578,947 | |
REARDAN Gravel Street Otta Seal Multiple Locations |
SCPP | 2024 | Bid Auth | 850,000 | 850,000 | |
REDMOND Redmond Way (SR 202) and NE 76th Street Bear Ck to E Lake Samm Pkwy; SR 202 to Fred Meyer |
UAP | 2021 | Construction | 1,588,500 | 4,659,028 | |
REDMOND Bel Red Road Buffered Bike Lanes NE 30th St to W Lake Sammamish Pkwy |
ATP | 2024 | Design | 650,000 | 3,062,000 | |
RENTON Rainier Avenue S/N S 3rd St (SR 900) to NW 3rd Pl |
UAP | 2023 | Construction | 5,355,150 | 26,454,839 | |
RENTON SW 43rd Street W C/L to SR 167 Ramps |
UAP | 2025 | Design | 2,975,154 | 5,979,841 | |
RENTON S 7th Street Improvements Oakesdale Ave S to Burnett Ave S |
ATP | 2025 | Design | 187,000 | 1,637,000 | |
REPUBLIC Gravel Street Otta Seal Multiple Locations |
SCPP | 2024 | Design | 1,150,000 | 1,150,000 | |
RICHLAND Downtown Connectivity Improvements George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St |
UAP | 2024 | Design | 3,500,000 | 16,781,600 | |
RICHLAND Gage Blvd/Center Parkway Gage Blvd to Tapteal Dr |
UCP | 2007 | Construction | 644,320 | 7,321,641 | |
RICHLAND Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 450,000 | 450,000 | |
RICHLAND Jadwin Avenue Sidewalk Davenport St to Gillespie St |
ATP | 2024 | Construction | 222,303 | 300,411 | |
RIDGEFIELD S Royle Road S 15th St to S 5th Way |
UAP | 2023 | Construction | 2,930,531 | 5,687,249 | |
RIDGEFIELD Hillhurst Pedestrian Improvements Multiple Locations |
CSP | 2026 | Design | 260,000 | 325,000 | |
RITZVILLE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 42,312 | 44,539 | |
RITZVILLE 1st Avenue Improvements Division St to Palouse St |
SCAP | 2025 | Design | 441,731 | 480,142 | |
RITZVILLE 6th Avenue Sidewalk Division St to Chelan St |
ATP | 2024 | Design | 392,853 | 413,529 | |
ROCK ISLAND Douglas Street Improvements Rock Island Rd to 3rd St SW |
SCAP | 2025 | Design | 106,850 | 898,350 | |
ROCKFORD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 67,600 | 67,600 | |
ROCKFORD 2024 Pavement Preservation Multiple Locations |
SCPP | 2025 | Design | 160,450 | 160,450 | |
ROSALIA 2024 Chip Seal Multiple Locations |
SCPP | 2026 | Application | 100,000 | 100,000 | |
ROY 2021 Overlay McNaught St to Roy Elementary School |
SCPP | 2023 | Construction | 105,573 | 111,128 | |
ROY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 100,000 | 100,000 | |
ROYAL CITY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 229,648 | 241,735 | |
ROYAL CITY 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Design | 678,775 | 714,500 | |
ROYAL CITY Apple Avenue NE Sidewalks Camelia St to Slate Ln NE |
SP | 2023 | Construction | 348,396 | 425,736 | |
RUSTON 2024 Overlay 52nd to Park Ave |
SCPP | 2025 | Design | 352,222 | 370,760 | |
RUSTON Park Street End of Road to Bennett St |
SCAP | 2023 | Bid Auth | 628,502 | 708,502 | |
SEATAC 34th Avenue S S 160th St to S 166th St |
UAP | 2022 | Construction | 2,000,000 | 6,812,836 | |
SEATAC Airport Station Pedestrian Improvements S 176th St/32nd Ave S and S 180th St |
UAP | 2025 | Design | 4,000,000 | 27,417,979 | |
SEATAC Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
SEATTLE East Marginal Way S S Atlantic to S Spokane St. |
UAP | 2020 | Construction | 3,000,000 | 19,393,875 | |
SEATTLE Lake Washington Blvd. renovations Lake Park Drive S to S Juneau Street |
CSP | 2026 | Application | 220,000 | 300,000 | |
SEATTLE 4th Avenue S Walkway S Royal Brougham Way to I 90 Off-Ramp |
SP | 2023 | Design | 247,000 | 329,016 | |
SEDRO WOOLLEY 2024 N Reed Street Overlay SR 20 to Brickyard Creek |
APP | 2025 | Bid Auth | 477,278 | 561,504 | |
SEDRO WOOLLEY Township Street (SR 9) John Liner Rd / McGarigle Rd Intersection |
UAP | 2023 | Design | 3,404,134 | 4,255,167 | |
SEDRO WOOLLEY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 500,000 | 500,000 | |
SEDRO WOOLLEY Sidewalk and ADA Ramp Upgrades Multiple Locations |
CSP | 2026 | Bid Auth | 454,636 | 534,866 | |
SEDRO WOOLLEY Cascade Trail West Extension Phase 2A Holtcamp Rd to Hodgin St |
ATP | 2024 | Design | 326,000 | 860,000 | |
SELAH E Goodlander Road Signal Landcaster Rd Signal |
UAP | 2025 | Construction | 538,020 | 622,800 | |
SEQUIM N Sequim Avenue Hendrickson St to Old Olympic Hwy |
UAP | 2022 | Construction | 1,073,186 | 4,227,100 | |
SHELTON Olympic Highway North C S to Wallace Kneeland Blvd |
UAP | 2025 | Design | 3,688,752 | 4,098,614 | |
SHORELINE 145th Street (SR 523) 3rd Ave NE to 5th Ave NE (I-5 Interchange) |
UAP | 2023 | Construction | 5,000,000 | 40,621,677 | |
SHORELINE N 145th Street (SR 523) Phase 1 Corliss Ave N to 3rd Ave NE |
UAP | 2024 | Construction | 5,000,000 | 11,845,978 | |
SHORELINE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
SHORELINE 8th Avenue NW Sidewalk Sunset School Park to Richmond Beach Rd NW |
ATP | 2025 | Design | 330,000 | 1,870,942 | |
SNOHOMISH 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 424,999 | 500,000 | |
SNOHOMISH Avenue D Overlay Multiple Locations |
APP | 2025 | Design | 455,353 | 535,710 | |
SNOHOMISH 13th Street Intersection Improvements Park Ave |
ATP | 2025 | Design | 177,539 | 208,870 | |
SNOHOMISH COUNTY 35th Avenue W 156th St SW to 148th St SW |
UAP | 2023 | Construction | 3,062,777 | 4,000,864 | |
SNOHOMISH COUNTY Larch Way Roundabout Locust Wy and Logan Rd |
UAP | 2024 | Construction | 2,875,000 | 4,205,001 | |
SNOHOMISH COUNTY Alderwood Mall Parkway SR 525 to 168th St SW |
UAP | 2025 | Design | 4,500,000 | 16,155,483 | |
SNOHOMISH COUNTY Pedestrian improvements Multiple Locations |
CSP | 2026 | Design | 368,700 | 461,215 | |
SNOHOMISH COUNTY Hilltop Elementary Sidewalk Damson Rd MP 0.18 to MP 0.24 |
ATP | 2024 | Construction | 259,452 | 330,023 | |
SNOHOMISH COUNTY Puget Park Drive RRFBs Various |
ATP | 2025 | Design | 195,914 | 301,406 | |
SNOQUALMIE 384th Ave SE Sidewalk Newton Ave to SE Kimball Creek Dr |
ATP | 2024 | Bid Auth | 548,856 | 4,093,991 | |
SOAP LAKE 2024 Scrub Seal - Red Town Initative Multiple Locations |
SCPP | 2024 | Bid Auth | 2,150,000 | 2,150,000 | |
SOAP LAKE Canna Street and 1st Avenue NE Main Ave E to SR 17 |
SCAP | 2023 | Design | 871,740 | 898,700 | |
SOAP LAKE Main Avenue W Cherry St S to Ginkgo St S |
SCAP | 2024 | Design | 1,150,000 | 1,150,000 | |
SOUTH BEND First Street A St to C St |
SCAP | 2025 | Design | 546,587 | 575,354 | |
SOUTH CLE ELUM 2024 Chip Seal Madison Ave. and 6th St |
SCPP | 2025 | Design | 47,460 | 47,460 | |
SOUTH PRAIRIE 2024 Otta Seal Multiple Locations |
SCPP | 2024 | Bid Auth | 145,000 | 145,000 | |
SOUTH PRAIRIE 2024 Maintenance Project Citywide Crack Seal |
SCPP | 2025 | Bid Auth | 3,130 | 3,130 | |
SOUTH PRAIRIE Pioneer Way E (SR 162) Emery St |
SCAP | 2025 | Design | 785,622 | 785,622 | |
SPANGLE 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 194,643 | 194,643 | |
SPOKANE Thor / Freya Couplet Hartson Ave to 150ft n/o Sprague Ave |
UAP | 2022 | Construction | 267,333 | 3,462,911 | |
SPOKANE Maple Street and Walnut Street 5th Ave to 1st Ave |
UAP | 2024 | Design | 920,400 | 1,534,000 | |
SPOKANE Riverside Ave. Monroe St to Wall St |
UAP | 2025 | Design | 887,000 | 1,774,000 | |
SPOKANE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
SPOKANE Traffic Calming - Cycle 10 Multiple Locations |
CSP | 2026 | Construction | 500,000 | 2,909,768 | |
SPOKANE Haven Street Sidewalk Rockwell Ave to Heroy Ave |
SP | 2023 | Construction | 177,348 | 283,276 | |
SPOKANE COUNTY Bigelow Gulch Road Progress Rd to Wellesley Ave |
UAP | 2021 | Construction | 2,065,000 | 5,410,704 | |
SPOKANE COUNTY Hatch Road Phase 1 MP 0.60 to MP 1.10 |
UAP | 2024 | Design | 1,508,999 | 2,011,000 | |
SPOKANE COUNTY Hatch Road Reconstruction Phase 2 MP 1.10 to MP 1.63 |
UAP | 2025 | Design | 2,434,400 | 3,043,000 | |
SPOKANE COUNTY Rowan Ave. ADA Ramp Replacement Starr Rd to Idaho Rd |
ATP | 2025 | Design | 425,360 | 553,000 | |
SPOKANE VALLEY Sullivan Road Sprague Ave to 8th Ave |
UAP | 2023 | Construction | 1,641,462 | 4,899,109 | |
SPOKANE VALLEY Broadway Avenue Concrete Intersection Park Rd |
UAP | 2024 | Construction | 1,655,420 | 2,554,394 | |
SPOKANE VALLEY 8th Avenue Coleman Rd to Park Rd |
SP | 2023 | Construction | 310,700 | 2,773,685 | |
SPOKANE VALLEY 8th Avenue Pedestrian and Bicycle Fancher Rd to Park Rd |
ATP | 2024 | Construction | 424,158 | 2,744,180 | |
SPOKANE VALLEY Sprague Ave. Pedestrian Crossings Chronicle Rd and McKinnon Rd |
ATP | 2025 | Design | 479,588 | 666,096 | |
SPRAGUE 4th Street Sidewalk SR 23 to E St |
ATP | 2024 | Design | 490,900 | 490,900 | |
SPRINGDALE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 39,734 | 39,734 | |
STANWOOD 2024 Overlay Multiple Locations |
APP | 2025 | Construction | 547,263 | 648,839 | |
STEILACOOM Townwide RRFB Project Steilacoom Blvd, Union Ave and Puyallup St |
ATP | 2024 | Construction | 215,209 | 286,946 | |
STEVENSON 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 144,907 | 152,534 | |
STEVENSON 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 71,268 | 75,020 | |
STEVENSON 1st Street Columbia St to Guardrail |
SCAP | 2025 | Bid Auth | 221,186 | 884,186 | |
SUMNER Stewart Road White River Bridge Butte Ave E to 140th Ave Ct E |
UAP | 2024 | Bid Auth | 6,000,000 | 27,447,350 | |
SUMNER Pedestrian improvements Multiple Locations |
CSP | 2026 | Application | 500,000 | 625,000 | |
SUMNER Elm Street Sidewalks Bonney Ave to Wright Ave |
ATP | 2024 | Design | 359,200 | 552,484 | |
SUNNYSIDE Yakima Valley Highway Overlay 1st St to 6th St |
APP | 2025 | Design | 425,871 | 473,190 | |
SUNNYSIDE Citywide pedestrian improvements Multiple Locations |
CSP | 2026 | Design | 500,000 | 588,235 | |
SUNNYSIDE 6th Street North Ave to Decatur Ave |
SP | 2023 | Construction | 348,542 | 4,256,439 | |
TACOMA E 64th Street McKinley Ave E to Portland Ave |
UAP | 2023 | Construction | 3,026,443 | 6,255,753 | |
TACOMA Sheridan Avenue Phase 1 S 72nd St to S 64th St |
UAP | 2024 | Design | 3,560,000 | 5,954,332 | |
TACOMA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 450,000 | 450,000 | |
TACOMA McKinley overlook complete streets East E Street to East F Street |
CSP | 2026 | Design | 408,289 | 522,359 | |
TACOMA S Yakima Avenue Sidewalk S 67th St to S 70th St |
SP | 2023 | Construction | 242,483 | 426,392 | |
TEKOA 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 187,700 | 187,700 | |
TEKOA 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Construction | 11,725 | 11,725 | |
TENINO 2024 Park Avenue Overlay 6th St to Howard St |
SCPP | 2025 | Design | 382,850 | 403,000 | |
THURSTON COUNTY Marvin Road SE 22nd Ave to Union Mills Rd |
UAP | 2024 | Bid Auth | 3,750,000 | 7,009,459 | |
THURSTON COUNTY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
TIETON 2024 Overlay Naches Ave to Tieton Ave |
SCPP | 2025 | Bid Auth | 127,990 | 134,730 | |
TIETON 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Design | 65,906 | 69,375 | |
TONASKET 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 308,051 | 308,051 | |
TONASKET Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 50,000 | 50,000 | |
TONASKET Perfect Passage 1st Street to 4th Street |
CSP | 2026 | Design | 946,110 | 5,639,855 | |
TOPPENISH Jackson Street and Juniper Street Monroe Ave to Magnolia St |
UAP | 2023 | Design | 1,386,360 | 1,540,400 | |
TUKWILA West Valley Highway (SR 181) Strander Bvd to I-405 |
UAP | 2019 | Construction | 2,115,432 | 4,834,855 | |
TUKWILA Southcenter Boulevard Signal 65th Avenue S |
UAP | 2025 | Design | 782,090 | 1,182,090 | |
TUKWILA S 119th Street Crossing 42nd Ave S Crossing |
ATP | 2024 | Closeout | 120,802 | 193,770 | |
TUMWATER Capitol Boulevard South, Trosper Road SE Ruby St to Market, Linda St to I-5 |
UAP | 2019 | Construction | 9,829,120 | 18,424,998 | |
TUMWATER Tumwater Boulevard NB I-5 On/Off Ramp Intersection |
UAP | 2024 | Design | 2,250,000 | 6,250,000 | |
TUMWATER Linwood Avenue Sidewalk Susitna Ln to 2nd Ave |
SP | 2023 | Design | 371,250 | 825,000 | |
TWISP 2024 Complete Streets Multiple Locations |
CSP | 2026 | Bid Auth | 42,750 | 45,000 | |
TWISP North End SR 20 PedestrianBike Path Twisp River Br to Days Ln |
ATP | 2025 | Design | 611,372 | 1,664,962 | |
UNIONTOWN 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Construction | 89,584 | 89,584 | |
UNIONTOWN 2023 Otta Seal Multiple Locations |
SCPP | 2024 | Bid Auth | 450,000 | 450,000 | |
UNIVERSITY PLACE Grandview Avenue Roundabout 36th St |
UAP | 2025 | Design | 664,480 | 830,600 | |
VANCOUVER SE 1st Street SE 164th Avenue to SE 177th Avenue |
UAP | 2020 | Construction | 2,825,424 | 10,944,587 | |
VANCOUVER SE 1st Street SE 177th Ave to SE 192nd Ave |
UAP | 2021 | Construction | 1,892,899 | 11,369,281 | |
VANCOUVER W Fourth Plain Boulevard Franklin St Intersection |
UAP | 2023 | Construction | 540,176 | 904,167 | |
VANCOUVER NE 137th Avenue NE 49th St to NE Fourth Plain Blvd |
UAP | 2024 | Construction | 3,250,000 | 28,658,398 | |
VANCOUVER Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 500,000 | 500,000 | |
VANCOUVER Fourth Plain Boulevard Fort Vancouver Way to Andresen Road |
CSP | 2026 | Application | 500,000 | 4,185,000 | |
VANCOUVER Hazel Dell Avenue Multiuse Path Discovery Trail to Burnt Bridge Creek Greenway |
ATP | 2024 | Design | 500,000 | 683,000 | |
WALLA WALLA Clinton Street Overlay Isaacs Ave to Sumach St |
APP | 2025 | Design | 400,000 | 1,203,000 | |
WALLA WALLA E Chestnut Street Roundabout Approximately 200ft north south east and west |
UAP | 2025 | Design | 1,110,000 | 1,510,000 | |
WALLA WALLA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 | |
WALLA WALLA Citywide pedestrian improvements Multiple Locations |
CSP | 2026 | Application | 541,248 | 854,061 | |
WAPATO 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Bid Auth | 950,000 | 1,000,000 | |
WAPATO S Naches Avenue 1st St to 4th St |
SCAP | 2024 | Design | 806,550 | 849,000 | |
WAPATO N Ahtanum Avenue Reconstruction W 1st St to End of Road |
SCAP | 2025 | Design | 807,975 | 850,500 | |
WAPATO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 50,000 | 50,000 | |
WARDEN 1st Street North Reconstruction N County Rd to Railroad tracks |
SCAP | 2025 | Design | 1,772,700 | 1,866,000 | |
WARDEN Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 | |
WARDEN W First Street (SR 170) Pathway S County Rd to Railroad R/W |
ATP | 2024 | Design | 57,375 | 425,000 | |
WASHOUGAL 2024 Main Street Overlay Multiple Locations |
APP | 2025 | Design | 628,426 | 739,325 | |
WASHOUGAL Evergreen Way Sidewalk 42nd St to Schmid Park |
ATP | 2025 | Design | 523,764 | 616,193 | |
WATERVILLE 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 210,845 | 210,845 | |
WAVERLY 2024 Scrub Seal Multiple Locations |
SCPP | 2025 | Design | 107,572 | 107,572 | |
WENATCHEE Springwater Avenue Woodward Dr to Western Ave |
UAP | 2021 | Construction | 2,185,000 | 3,788,965 | |
WENATCHEE McKittrick Street Pine St to Pershing St (City Limits) |
UAP | 2023 | Construction | 1,913,123 | 2,449,465 | |
WENATCHEE Red Apple Road Vista Pl to Miller St |
UAP | 2024 | Design | 1,919,228 | 2,399,035 | |
WENATCHEE 9th Street Corridor Improvements Miller St to BNSF Railroad Crossing |
UAP | 2025 | Design | 1,199,000 | 1,499,170 | |
WENATCHEE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 600,000 | 600,000 | |
WEST RICHLAND School zone pedestrian improvements Multiple Locations |
CSP | 2026 | Application | 250,508 | 294,716 | |
WEST RICHLAND Candy Mountain pathway 500' West of Milky Way to Watkins Way |
CSP | 2026 | Application | 131,739 | 210,739 | |
WESTPORT N Forrest Street Ocean Ave to 400 ft n/o Sprague Ave |
SCAP | 2024 | Design | 673,008 | 708,430 | |
WILBUR 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 31,476 | 31,476 | |
WILBUR 2024 Overlay Multiple Locations |
SCPP | 2025 | Design | 716,277 | 716,277 | |
WILSON CREEK 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Bid Auth | 32,200 | 32,200 | |
WINLOCK NW Arden Avenue NW Fir St to W Walnut St |
SCAP | 2025 | Design | 814,076 | 856,923 | |
WINTHROP Horizon Flats Road Twin Lakes Rd to 3650 feet south |
SCAP | 2023 | Design | 961,136 | 1,011,723 | |
WINTHROP Bridge Street Improvement Project Riverside Ave to Bluff St |
ATP | 2025 | Design | 528,675 | 556,500 | |
WOODINVILLE 131st Avenue NE (SR 202) Trestle Replacement NE 175th St to NE 177th Pl |
UAP | 2025 | Design | 5,000,000 | 16,287,938 | |
WOODLAND 2024 S Pekin Overlay Davidson Ave to n/o Marty Lp |
APP | 2025 | Design | 632,394 | 702,660 | |
WOODLAND W Scott Avenue Railroad Tracks to Pacific Ave |
UAP | 2020 | Construction | 1,231,440 | 1,368,266 | |
WOODLAND Guild Road and W Scott Avenue Schurman Way to Railroad Tracks |
UAP | 2020 | Construction | 1,243,885 | 1,382,095 | |
YACOLT W Hoag Street Parcel Ave to Railroad Ave |
SCAP | 2025 | Design | 360,240 | 379,200 | |
YAKIMA N 1st Street MLK Blvd to J St |
UAP | 2023 | Construction | 1,500,000 | 11,378,665 | |
YAKIMA Nob Hill Boulevard Overlay S 15th Ave to S 28th Ave |
UAP | 2024 | Construction | 1,337,216 | 1,696,520 | |
YAKIMA 34th Avenue Roundabouts Fruitvale Boulevard to 34th Avenue |
UAP | 2025 | Design | 2,087,102 | 4,100,000 | |
YAKIMA Nob Hill Boulevard Improvements S 4th Ave to S 15th Ave |
UAP | 2025 | Construction | 957,599 | 1,255,649 | |
YAKIMA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 250,000 | 250,000 | |
YAKIMA Pedestrian improvements Intersection at 5th Avenue and D Street |
CSP | 2026 | Application | 198,300 | 573,300 | |
YAKIMA COUNTY Ahtanum Road Yakima C/L to S 52nd Ave |
UAP | 2018 | Design | 2,500,000 | 3,045,672 | |
YAKIMA COUNTY Ahtanum Road Yakima C/L to S 52nd Ave |
UAP | 2018 | Construction | 0 | 3,814,062 | |
YELM ADA Ramp Rehabilitation Multiple Locations |
CSP | 2026 | Design | 263,500 | 310,000 | |
ZILLAH 8th Street Improvements Rainier Ave to First Ave |
SCAP | 2025 | Design | 571,376 | 631,880 |