ABERDEEN
Sumner Avenue (SR 101) Sidewalk
Maple St to Williams St
ATP 2024 Design 450,000 1,141,775
ABERDEEN
US 101 Safety Improvements
US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17
ATP 2025 Design 450,000 2,205,000
AIRWAY HEIGHTS
10th Avenue Extension
10th Ave terminus to Hayford Rd
UAP 2022 Construction 2,467,406 3,799,424
AIRWAY HEIGHTS
6th Avenue
Craig Rd to Russell St
UAP 2025 Construction 552,335 4,551,920
ALBION
2024 Otta Seal
Multiple Locations
SCPP 2025 Construction 657,597 657,597
ALGONA
Ellingson Road Overlay
Pacific Ave to UPRR
SCPP 2025 Construction 704,176 786,918
ALMIRA
School Vicinity Chip Seal
Multiple Locations
SCPP 2025 Construction 9,563 28,690
ANACORTES
Commercial Avenue (SR 20 Spur)
13th St to 11th St
UAP 2021 Design 950,000 3,525,442
ANACORTES
R Avenue Improvements
27th St to 34th St
UAP 2024 Construction 550,000 4,718,232
ANACORTES
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 400,000 400,000
ARLINGTON
211th Place
SR 530 to 67th Ave NE
UAP 2024 Construction 2,645,000 4,755,968
ASOTIN
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 72,821 76,654
ASOTIN
2024 Chip Seal
Multiple Locations
SCPP 2025 Construction 77,457 81,534
AUBURN
Auburn Way S Widening
Hemlock St to Poplar St
UAP 2025 Design 3,309,032 7,994,034
AUBURN
Regional Growth Center Improvements
B St NE and 3rd St NE to Auburn Wy N and 4th St NE
UAP 2025 Construction 1,872,227 3,443,134
BAINBRIDGE ISLAND
Madison Ave Nonmotorized Improvements
SR 305 to Winslow Way
CSP 2026 Construction 500,000 3,876,681
BAINBRIDGE ISLAND
NE Wyatt Way
Eagle Harbor Dr NE
ATP 2025 Design 500,000 3,928,489
BATTLE GROUND
2024 Eaton Boulevard Overlay
Multiple Locations
APP 2025 Construction 336,974 426,217
BATTLE GROUND
SE Grace Avenue - Phase II
NE 1st St to SE Rasmussen Blvd
UAP 2023 Design 3,000,000 6,310,056
BEAUX ARTS VILLAGE
104th105th Pavement Preservation
North Town limit to SE 30th
SCPP 2026 Construction 195,271 205,548
BELLEVUE
150th Avenue
SE 28th St to SE 38th St
UAP 2024 Design 3,990,000 10,966,587
BELLEVUE
123rd Avenue SE pedestrian improvements
SE 60th Street to Newcastle Way
CSP 2026 Construction 600,000 1,783,578
BELLINGHAM
Meridian St
W Illinois St Roundabout
UAP 2022 Construction 575,000 1,105,689
BELLINGHAM
Lincoln St/E Maple Street
Lincoln St to Consolidation Ave
UAP 2023 Construction 480,000 650,000
BELLINGHAM
12th Street and Finnegan Way
McKenzie St and 11th St
UAP 2024 Bid Auth 400,000 500,000
BELLINGHAM
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 500,000 500,000
BLAINE
Boblett Street
Yew Ave to Ludwick Ave
UAP 2022 Construction 1,161,862 3,614,644
BONNEY LAKE
LED Streetlight Conversion
Citywide
LED 2025 Construction 157,500 157,500
BOTHELL
Meridian Avenue Roundabout
240th St Roundabout
UAP 2025 Construction 693,951 1,875,121
BOTHELL
23rd Avenue SE RRFB
243rd Place SE Intersection
CSP 2026 Construction 81,211 116,595
BREMERTON
E 11th Street and Perry Avenue
Pitt Avenue to E 17th Street
UAP 2020 Construction 4,341,916 7,287,140
BREMERTON
Washington Avenue / 11th Street
Pacific Ave to Manette Bridge
UAP 2023 Construction 1,742,143 7,260,650
BREWSTER
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 12,974 13,657
BREWSTER
Old Hwy 97
US 97 to North C/L
SCAP 2024 Closeout 166,298 1,394,701
BURIEN
S 136th Street
1st Ave S to Des Moines Memorial Dr S
UAP 2023 Construction 4,121,540 5,857,312
BURIEN
SW 148th Street
4th Ave SW to 6th Ave SW
UAP 2024 Construction 3,888,535 5,786,010
BURLINGTON
East-West Connector
Burlington Blvd to Walnut Street
UAP 2019 Construction 2,688,618 5,626,051
BURLINGTON
LED Streetlight Conversion
PSE Owned
LED 2019 Construction 150,000 150,000
CAMAS
NW 38th Avenue
NW Parker St to Grass Valley Park
UAP 2025 Construction 1,692,384 7,386,337
CARNATION
2024 Seal Coat
Multiple Locations
SCPP 2025 Design 154,000 162,850
CARNATION
Milwaukee Avenue Overlay
Entwistle St to NE 50th St
SCPP 2025 Design 467,444 492,046
CARNATION
McKinley Street
Eugene St to Blanche St
SCAP 2024 Construction 459,422 839,209
CARNATION
Tolt Middle School Sidewalk
N Driveway to S Driveway
CSP 2026 Construction 165,750 207,291
CASHMERE
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 56,124 59,078
CENTRALIA
S Gold Street
Main St to Summa St
UAP 2024 Construction 1,235,741 1,498,449
CHEHALIS
SW 13th Street Sidewalk
SW William Ave to S Market Blvd
ATP 2025 Construction 256,468 284,965
CHELAN
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 41,687 46,319
CHELAN
Sanders Street Pedestrian Improvements
E Okanogan Ave and E Wapato Ave
SCAP 2025 Design 99,999 819,759
CHELAN
Lakeside Trail
W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave.
ATP 2025 Design 500,000 3,602,414
CHELAN
Resin Bonded Stone Surfacing Pilot
Bradley and Johnson Intersection Vicinity
ATP 2025 Construction 163,800 182,000
CHELAN COUNTY
Easy St and School St Intersection
School Street Roundabout
UAP 2025 Design 800,000 2,431,217
CHENEY
Elm Street Overlay
6th Street Vicinity to Washington Street
APP 2025 Design 1,884,892 2,094,324
CHENEY
N 6th Street Roundabout
Betz Road
UAP 2024 Design 966,854 1,074,283
CHEWELAH
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 54,587 57,460
CHEWELAH
2024 Chip Seal
Multiple Locations
SCPP 2025 Construction 171,732 180,771
CHEWELAH
W Main Avenue
SR 395 to Hunt St
SCAP 2024 Construction 1,285,309 1,436,879
CLARK COUNTY
NE 152nd Avenue
Padden Pkwy to NE 99th St
UAP 2025 Design 3,500,000 8,967,367
CLARK COUNTY
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 750,000 750,000
CLARK COUNTY
NE 68th Street Sidewalk
Highway 99 to NE St Johns Rd
SP 2023 Construction 400,000 5,680,037
CLARK COUNTY
Truman School Sidewalk
NE 40th Ave and NE 44th St
ATP 2024 Design 200,000 430,000
CLE ELUM
Second Street Roundabout
Second St (SR 903) and Stafford Ave
SCAP 2024 Design 704,591 741,675
CLE ELUM
First Street - Phase 3
Oakes Ave to Peoh Ave
SCAP 2025 Construction 677,032 5,499,790
CLE ELUM
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 350,000 350,000
CLE ELUM
2nd Street multi-use path
Pennsylvania Avenue toward Short Avenue
CSP 2026 Construction 500,000 538,816
CLE ELUM
Second Street Pathway - Phase 1
N Stafford Ave to N Pennsylvania Ave
ATP 2025 Construction 548,798 590,182
COLFAX
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Closeout 105,539 111,093
COLFAX
2024 Otta Seal
Multiple Locations
SCPP 2025 Construction 891,464 938,383
COLFAX
Morton and Sumner Streets
Morton Tyler to 4th Sumner 1st to 4th
SCAP 2024 Construction 914,124 1,336,805
COLLEGE PLACE
NE Damson Avenue
Cargill Ave to Rose St
UAP 2024 Construction 1,261,405 1,426,561
COLLEGE PLACE
SW Mojonnier Road Improvements
College Ave to Bluvue Ln
UAP 2025 Design 1,922,008 6,772,008
COLLEGE PLACE
SE 8th Street Sidewalk
Birch Ave to Larch Ave
ATP 2025 Design 657,900 731,000
COLTON
2024 Chip Seal
Multiple Locations
SCPP 2025 Design 252,037 252,037
COLVILLE
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 49,970 52,600
COLVILLE
2025 Pavement Preservation - Red Town
Multiple Locations
SCPP 2026 Application 2,000,000 2,105,263
CONCRETE
Secondary Access
SR 20 to Airport Way
SCAP 2023 Design 500,000 3,414,000
CONNELL
2024 Chip Seal
W Clark Street
SCPP 2025 Construction 119,349 125,631
CONNELL
School zone and speed feedback signs
Cemetary Road to 5th Avenue
CSP 2026 Construction 57,000 60,000
COULEE CITY
McEntee Street Improvements
Walnut St to Chelan St
SCAP 2025 Design 124,201 920,000
COULEE DAM
2024 Chip Seal
Multiple Locations
SCPP 2025 Closeout 716,031 716,030
COULEE DAM
2024 Street Maintenance
Multiple Locations
SCPP 2025 Closeout 159,026 159,026
COULEE DAM
ADA Ramp Upgrades
Multiple Locations
ATP 2025 Design 481,406 481,406
COUPEVILLE
2024 Chip Seal
Multiple Locations
SCPP 2025 Bid Auth 182,685 192,299
COUPEVILLE
Front and N Main Street Sidewalks
Multiple Locations
ATP 2024 Design 325,123 871,514
COVINGTON
Lakepointe Boulevard
SR 18 to SE 258th St
UAP 2021 Construction 994,019 1,362,939
CUSICK
River Road Erosion Control
Eagle's Landing Resort Vicinity
SCPP 2025 Bid Auth 50,000 50,000
DAVENPORT
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Closeout 226,241 226,241
DAYTON
2024 Otta Seal
Multiple Locations
SCPP 2025 Construction 1,178,464 1,240,488
DAYTON
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 80,000 80,000
DAYTON
S. 4th Street sidewalk
E Main Street to Day Street
CSP 2026 Construction 463,811 493,222
DES MOINES
24th Avenue S
Kent-Des Moines Rd (SR 516) to S 223rd St
UAP 2021 Construction 4,212,947 7,493,224
DOUGLAS COUNTY
21st St NE
N Baker Ave to N Devon Ave
UAP 2025 Design 1,518,791 1,786,813
DUVALL
142nd Place sidewalk - Phase 2
275th Avenue NE to 278th Avenue NE
CSP 2026 Construction 400,000 722,423
DUVALL
Main Street (SR 203) / Cherry Street RRFB
NE Cherry St Crossing
ATP 2025 Construction 62,767 73,903
EAST WENATCHEE
3rd Street SE
Rock Island Rd Intersection
UAP 2023 Construction 805,588 1,447,705
EAST WENATCHEE
19th Street NW Phase 1
SR 28 to Bella Rio Apartments
UAP 2024 Construction 2,000,000 5,299,012
EAST WENATCHEE
5th Street NE Safety and Multimodal Improvements
N Baker Ave to N Kentucky Ave
UAP 2025 Design 2,500,000 2,995,175
EAST WENATCHEE
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 300,000 300,000
EAST WENATCHEE
3rd Avenue Bike and Ped improvements
N Georgia Ave to N Hanford Ave
CSP 2026 Construction 415,047 508,000
EATONVILLE
Eatonville Pavement Preservation
Multiple Locations
SCPP 2025 Design 130,720 137,600
EATONVILLE
West Eatonville Sidewalk Improvements
Multiple Locations
ATP 2025 Design 399,076 420,080
EDMONDS
Main Street complete streets improvements
6th Avenue to 8th Avenue
CSP 2026 Construction 449,897 1,671,003
ELECTRIC CITY
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Construction 511,849 511,849
ELECTRIC CITY
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 270,408 270,408
ELLENSBURG
Pfenning Road Sidewalk
240ft n/o Vantage Hwy to Radio Rd
UAP 2024 Construction 973,570 1,520,824
ELLENSBURG
Pedestrian Improvements
Multiple Locations
CSP 2026 Construction 491,230 602,917
ELMA
W Main Street ADA
16th St to 18th St
ATP 2025 Construction 365,170 389,390
ELMA
Main Street RRFBs
4th St to 11th St
ATP 2025 Construction 238,096 255,627
ENDICOTT
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 21,206 21,206
ENUMCLAW
244th Avenue Roundabout
Roosevelt Ave
UAP 2024 Construction 641,728 1,131,577
EPHRATA
Nat Washington Way Overlay
A Street SE to 2nd Ave SE
APP 2024 Design 532,327 591,385
EPHRATA
Nat Washington Way Overlay
A Street SE to 2nd Ave SE
APP 2024 Construction 30,807 34,320
EVERSON
S Harkness Street
W Main St to Lincoln St
SCAP 2025 Design 683,671 719,654
FAIRFIELD
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 43,322 43,322
FAIRFIELD
2024 Scrub Seal
Multiple Locations
SCPP 2025 Construction 164,243 164,243
FARMINGTON
2025 Otta Seal
Multiple Locations
SCPP 2026 Design 200,000 200,000
FEDERAL WAY
S 288th Street
16th Ave S to 34th Ave S
UAP 2022 Design 2,000,000 3,240,000
FEDERAL WAY
Pacific Highway S (SR 99)
S C/L to Weigh Station
UAP 2023 Design 2,500,000 3,770,000
FEDERAL WAY
SR 99 pedestrian improvements
S 304th Street to S 308th Street
CSP 2026 Construction 120,800 151,000
FEDERAL WAY
Citywide Pedestrian Crossings
RRFB Crossings
ATP 2024 Design 350,001 503,211
FERNDALE
Ferndale Terrace
Hendrickson Ave to Vista Dr
UAP 2025 Design 2,855,316 5,988,666
FIFE
N Levee Road Overlay
70th Ave E to Freeman Rd E
APP 2024 Construction 587,941 804,318
FIFE
20th Street E Multimodal Improvements
5410 20th St E to 62nd Ave E
UAP 2025 Design 3,990,000 4,988,816
FIRCREST
2022 Overlay Award
Multiple Locations
APP 2024 Construction 639,121 726,948
FIRCREST
2024 Overlay
Multiple Locations
APP 2025 Design 677,409 801,952
FIRCREST
Electron Way
Constra Costa Ave Intersection
CSP 2026 Construction 75,724 168,846
FORKS
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Design 2,000,000 2,105,263
FORKS
West E Street
5th Ave to S Forks Ave (SR 101)
SCAP 2025 Design 549,613 578,540
FORKS
Bogachiel Way Overlay
6th Avenue to Russell Road
SCAP 2026 Construction 65,001 517,079
FRIDAY HARBOR
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 99,324 110,360
FRIDAY HARBOR
Marguerite Place
Spring St to Park St
SCAP 2023 Construction 925,000 2,198,399
GARFIELD
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Design 1,700,000 1,700,000
GIG HARBOR
Wollochet Drive Signal
Wagner Way
UAP 2025 Construction 1,227,050 1,718,804
GIG HARBOR
Burnham Drive Sidewalk
Eagles Club Driveway to 96th St
ATP 2025 Construction 1,524,574 4,933,502
GOLDENDALE
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Application 1,000,000 1,052,632
GRAND COULEE
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Construction 275,687 275,687
GRAND COULEE
2022 Crack Seal
Citywide
SCPP 2024 Construction 164,779 164,779
GRAND COULEE
Spokane Way Improvements
Alcan Rd to E Grand Coulee Ave (SR 174)
SCAP 2025 Design 126,876 1,015,000
GRANDVIEW
Wine Country Road Overlay
Euclid St to Grandridge Rd
APP 2025 Construction 456,511 561,365
GRANGER
Pedestrian Safety Improvements
2nd Avenue to E Avenue
CSP 2026 Construction 71,026 74,764
GRANGER
Complete Streets Improvements
Main Street - W. First Ave to Third St
CSP 2026 Construction 44,577 46,924
GRANITE FALLS
Stanley Street RRFB's
Portage Ave and Kentucky Ave
CSP 2026 Construction 63,225 101,322
GRANITE FALLS
W Stanley Street Sidewalk
Jordan Rd to Prospect Ave
ATP 2024 Construction 570,860 760,630
HARTLINE
2024 Chip Seal
Multiple Locations
SCPP 2025 Construction 147,767 147,767
HATTON
2024 Otta Seal
Multiple Locations
SCPP 2025 Construction 289,000 289,000
HOQUIAM
City of Hoquiam Safe Routes to School
City of Hoquiam
ATP 2024 Construction 345,748 1,749,908
ILWACO
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Design 1,500,000 1,578,947
ISSAQUAH
12th Avenue NW
SR 900 to Lake Dr
UAP 2023 Construction 3,000,000 5,904,859
KALAMA
2024 Chip Seal
Multiple Locations
SCPP 2025 Design 165,300 174,000
KALAMA
China Garden Road
S 10th St to Gwynne Rd
SCAP 2025 Design 858,069 903,230
KENMORE
NE 170 Street ped/bike improvements
Juanita Drive to 72nd Avenue NE
CSP 2026 Construction 212,888 360,503
KENNEWICK
Columbia Center Boulevard
Deschutes Ave Intersection
UAP 2023 Closeout 1,472,000 2,452,918
KENNEWICK
Citywide ADA Improvements
Multiple Locations
CSP 2026 Construction 327,790 409,745
KENNEWICK
Pedestrian Safety Improvements
Multiple Locations
CSP 2026 Construction 204,276 255,345
KENT
Reith Road
140ft s/o S 253rd St to 200ft w/o SR 516
UAP 2023 Construction 1,834,250 5,437,988
KENT
76th Avenue S South Phase
2600ft s/o S 212th St to 3660 ft s/o S 212th St
UAP 2025 Construction 2,654,664 15,224,824
KENT
132nd Avenue SE multi-use path
SE 228th Place to SE 240th Street
CSP 2026 Construction 471,601 1,655,318
KENT
RRFB Crossings
Various
ATP 2025 Construction 77,704 104,139
KETTLE FALLS
High School Sidewalk Corridor
High School Enterance to approximately 400' E of Juniper
CSP 2026 Bid Auth 181,000 294,000
KING COUNTY
68th Avenue S / S 124th Street
Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St
UAP 2023 Design 1,706,037 2,132,547
KING COUNTY
Redmond Ridge Dr NE Roundabout
NE Alder Crest Dr
UAP 2024 Construction 907,859 1,723,869
KIRKLAND
100th Avenue NE
NE 138th Pl to NE 145th St
UAP 2021 Construction 3,300,000 21,430,791
KIRKLAND
116th Avenue NE sidewalk improvements
NE 73rd Street to NE 75th Street
CSP 2026 Construction 500,000 844,915
KIRKLAND
RRFB project
Crosswalk at 124th Ave NE and NE 104th Street
CSP 2026 Construction 108,967 141,157
KIRKLAND
132nd Avenue NE
NE 110th Pl to NE 97th St
SP 2023 Construction 125,001 1,150,225
KIRKLAND
Pedestrian Crossing at Lake Washington Institute of Technology
132nd Ave NE
ATP 2025 Design 265,000 351,700
KITSAP COUNTY
SE Lund Avenue
Harris Rd SE Intersection
UAP 2023 Design 3,664,358 4,585,448
KITSAP COUNTY
Lund Avenue Roundabout
Chase Rd Roundabout
UAP 2025 Design 2,668,198 3,335,249
KITTITAS
2024 Chip Seal
Multiple Locations
SCPP 2025 Construction 51,826 54,522
LA CONNER
Pedestrian Improvements
Multiple Locations
CSP 2026 Construction 30,318 34,727
LACEY
College Street NE
Martin Way to 15th Ave NE
UAP 2022 Bid Auth 2,830,000 4,800,000
LAKE FOREST PARK
SR 104
40th Pl NE Roundabout
UAP 2021 Design 2,561,198 3,240,000
LAKE STEVENS
91st Avenue SE Sidewalk
8th St SE to Market Pl
CSP 2026 Construction 442,564 1,347,807
LAKEWOOD
S Tacoma Way Signal
92nd St S
UAP 2025 Design 750,000 1,250,000
LAKEWOOD
Custer Road W
Bridgeport Way SW to 75th ST W
UAP 2025 Design 2,976,687 3,720,858
LAKEWOOD
Steilacoom Boulevard SW Sidewalk
87th Ave SW to Weller Rd SW
SP 2023 Construction 442,680 5,661,272
LEAVENWORTH
2024 Scrub Seal - Red Town InitiativeIncre
Multiple Locations
SCPP 2024 Construction 1,170,921 1,301,023
LEAVENWORTH
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 113,035 141,694
LEAVENWORTH
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 75,000 75,000
LEAVENWORTH
Curb Ramp Improvements
Multiple Locations
ATP 2025 Design 277,992 308,880
LIND
2024 Scrub Seal
Multiple Locations
SCPP 2025 Construction 172,356 172,356
LONG BEACH
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 75,000 75,000
LONG BEACH
2nd Street NE Sidewalk
Washington Ave S to 600ft e/o Washington Ave S
ATP 2025 Bid Auth 336,300 354,000
LONGVIEW
46th Avenue
SR 4 to Olympia Way
UAP 2021 Construction 3,331,544 5,919,825
LONGVIEW
Olympia Way and Nichols Blvd
Multiple Locations
UAP 2025 Construction 1,747,877 2,352,651
LONGVIEW
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 400,000 400,000
LONGVIEW
18th Avenue ADA Ramps
Louisiana Street to Olympia Way
CSP 2026 Construction 117,224 151,345
LYNDEN
2024 1st Street Overlay
Riverview Rd to Grover St
APP 2025 Construction 371,014 567,655
LYNNWOOD
Poplar Way Bridge
196th St SW to Alderwood Mall Blvd
UAP 2024 Design 5,000,000 42,085,000
LYNNWOOD
2024 Curb Ramps
Multiple Locations
CSP 2026 Construction 500,000 840,690
MABTON
2024 Otta Seal
Multiple Locations
SCPP 2024 Construction 656,777 656,777
MABTON
Main Street Reconstruction Project
Washington St to SR 22
SCAP 2022 Construction 295,963 2,381,514
MABTON
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 75,000 75,000
MALDEN
2024 Otta Seal
Multiple Locations
SCPP 2025 Construction 477,470 477,470
MANSFIELD
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 135,850 135,850
MAPLE VALLEY
Maple Valley Highway (SR 169)
SE 253rd Pl to SE 260th St
UAP 2024 Construction 2,261,668 15,295,345
MAPLE VALLEY
Crosswalk safety RRFB
Multiple Locations
CSP 2026 Construction 153,491 191,864
MAPLE VALLEY
SE Kent Kangley Road (SR 516) Sidewalk
800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE
ATP 2025 Design 742,383 927,980
MARYSVILLE
State Avenue
104th Pl NE to 116th St NE
UAP 2022 Construction 4,250,000 8,583,489
MARYSVILLE
156th Street NE
Smokey Pt Blvd to Hayho Creek
UAP 2025 Design 1,440,000 1,800,000
MARYSVILLE
Citywide ADA Ramps
Multiple Locations
CSP 2026 Construction 345,547 4,252,526
MARYSVILLE
RRFB project
Multiple locations
CSP 2026 Construction 47,740 62,267
MARYSVILLE
53rd Ave NE Shared Used Path
61st St NE to SR 528
ATP 2024 Construction 320,000 2,036,464
MATTAWA
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Design 1,300,000 1,300,000
MATTAWA
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 100,000 100,000
MCCLEARY
W Maple Street Sidewalk
S 6th St to S Main St
ATP 2025 Design 495,843 521,940
MEDICAL LAKE
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 242,318 255,102
MEDICAL LAKE
2024 Scrub and Chip Seal - Red Town
Multiple Locations
SCPP 2025 Construction 902,129 949,815
MEDICAL LAKE
Lefevre Street (SR 902) Ped/Bike Improvements
Hancock Street North to Brooks Road
CSP 2026 Construction 1,824,728 2,242,491
MEDICAL LAKE
Lefevre Street Restriping and Sidewalk
Idaho St to n/o James St
ATP 2024 Construction 447,120 483,941
MEDICAL LAKE
Lefevre Street Restriping and Sidewalk
Idaho St to n/o James St
ATP 2024 Design 250,240 272,000
MEDINA
Upland Road Overlay
Overlake Drive W to NE 6th St
SCPP 2024 Construction 233,351 264,279
MESA
2024 Chip Seal
Multiple Locations
SCPP 2025 Construction 359,766 359,766
MILLWOOD
2025 Empire Ave Pavement Preservation
Argonne to Butler
SCPP 2026 Application 80,000 84,211
MILLWOOD
Argonne Road Reconstruction - Phase 2
E Trent Ave to 150 ft s/o S Frederick Ave
SCAP 2025 Design 1,409,230 1,483,400
MILLWOOD
Argonne Road Reconstruction - Phase 1
150 ft s/o Frederick to N of Riverway
SCAP 2025 Design 1,278,255 4,448,347
MILTON
2022 Overlay Award
Multiple Locations
APP 2024 Construction 511,185 605,400
MILTON
Pacific Highway S (SR 99)
Porter Way Intersection
UAP 2021 Construction 3,380,530 3,980,616
MONROE
RRFB Crossings
City of Monroe
ATP 2025 Construction 114,836 149,502
MONTESANO
W. Pioneer Avenue
Main to 4th
SCAP 2024 Construction 155,610 1,668,625
MONTESANO
Lake Sylvia Road Sidewalk
McBryde Ave to Nevills Lane
SCAP 2026 Construction 45,509 669,000
MORTON
2024 Red Town Initiative
Multiple Locations
SCPP 2025 Construction 783,930 825,190
MORTON
2022 Overlay Award
City Wide
SCAP 2024 Construction 417,662 572,300
MOSES LAKE
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 105,000 105,000
MOUNT VERNON
Laventure Road
Hoag Rd to Sigmar Ln
UAP 2025 Design 1,208,800 1,536,000
MOUNTLAKE TERRACE
66th Avenue W
220th St SW to N City Limits
UAP 2021 Construction 2,503,000 3,433,637
MOXEE
Pedestrian Improvements
Multiple Locations
CSP 2026 Construction 316,959 395,715
MUKILTEO
Harbour Pointe Blvd. paved path
47th Place Way to Cyrus Way
CSP 2026 Construction 403,054 1,055,804
NACHES
Downtown Revitalization Plan
W 2nd Street to W 3rd Street
CSP 2026 Construction 71,250 75,000
NAPAVINE
2nd Ave SE Overlay
Washington St to RR tracks
SCPP 2025 Construction 178,874 188,289
NORTH BEND
2024 Overlay
Multiple Locations
APP 2025 Construction 725,714 863,780
NORTH BEND
Sidewalk gaps
Multiple Locations
CSP 2026 Construction 484,863 1,413,981
NORTH BEND
SR202 Sidewalk Gap
North Bend Way to RR Tracks
ATP 2025 Bid Auth 133,819 157,435
NORTH BONNEVILLE
Cascade Drive and Hot Springs Way
Varies
SCAP 2025 Construction 286,730 301,822
OAK HARBOR
NE 7th Avenue
e/o Oak Harbor St to Harvest Dr
UAP 2024 Construction 702,174 3,001,533
OAK HARBOR
LED Streetlight Conversion
PSE Owned
LED 2019 Construction 220,000 220,000
OAKVILLE
2024 Red Town Initiative
Multiple Locations
SCPP 2025 Construction 585,000 585,000
OAKVILLE
School Street and W Pine Street
SR 12 to Ash St and SR 12 to School St
SCAP 2024 Design 638,743 638,743
OKANOGAN
2023 Maintenance Project
Citywide
SCPP 2024 Construction 200,884 211,457
OKANOGAN
3rd Avenue Improvements
Irene St to Greta St
SCAP 2025 Design 1,235,000 1,300,000
OKANOGAN
Oak Street
2nd Ave to Bridge e/o 1st Ave
SCAP 2023 Construction 66,591 503,263
OLYMPIA
Fones Road SE
Pacific Ave SE to 18th Ave SE
UAP 2023 Construction 2,000,000 17,979,962
OLYMPIA
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 300,000 300,000
OMAK
2023 Maintenance Project
Citywide
SCPP 2024 Construction 243,615 256,437
OMAK
Jonathan Avenue
Pine St to Quince St
SCAP 2025 Design 792,300 834,000
OMAK
Central Ave Reconstruction Phase II
Cedar St to Fir St
SCAP 2025 Design 940,405 989,900
OROVILLE
Ironwood Street
12th Ave to 17th Ave
SCAP 2024 Construction 1,114,251 1,182,896
ORTING
Kansas Street Reconstruction
SR 162 to Coe Ln
UAP 2025 Design 4,420,363 4,911,515
ORTING
LED Streetlight Conversion
Citywide
LED 2025 Construction 49,000 49,000
OTHELLO
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 400,000 400,000
PACIFIC
Ellingson Overlay
West Valley Hwy to UPRR Crossing
APP 2025 Design 1,607,270 1,786,103
PACIFIC
New sidewalks
Multiple Locations
CSP 2026 Construction 620,713 1,001,724
PACIFIC
Interurban Trail Crossing Improvements
Ellingson Rd
ATP 2025 Design 79,240 88,044
PACIFIC
LED Streetlight Conversion
PSE Owned
LED 2020 Construction 110,250 110,250
PASCO
Lewis Street
2nd Ave to Oregon Ave (SR 397)
UAP 2021 Construction 7,000,000 25,690,769
PASCO
Court Street Roundabout
Rd 68 Roundabout
UAP 2025 Construction 1,415,000 2,950,731
PATEROS
Commercial Avenue Multimodal Improvements
Lakeshore Drive to S Dawson Street
CSP 2026 Construction 1,013,425 1,231,242
PATEROS
Downtown ADA Improvements
Multiple Locations
ATP 2024 Construction 544,650 544,650
PATEROS
Resin Bonded Stone Surfacing Pilot
Intersection Vicinity
ATP 2025 Design 136,000 136,000
PIERCE COUNTY
Canyon Road E
208th St E to 200th St E
UAP 2023 Construction 2,000,000 11,403,610
PIERCE COUNTY
122nd Avenue E
146th St Ct E to 136th St E
UAP 2025 Design 5,000,000 18,501,901
PIERCE COUNTY
Pedestrian improvements
Multiple Locations
CSP 2026 Construction 389,443 490,804
PIERCE COUNTY
2025 RRFB School Crossing
Gem Height Dr @ 94th Ave E and 182nd St E and Ainsworth Ave S @ Garfield St
ATP 2025 Design 619,840 824,000
PORT ANGELES
2024 Marine Drive Overlay
Tumwater Truck Route to Hill Street
APP 2025 Construction 534,558 848,451
PORT ANGELES
8th Street
Lincoln St to A St
UAP 2024 Bid Auth 1,464,365 1,904,365
PORT ORCHARD
Bethel Avenue
Bethel Rd, Lincoln Ave SE, Mitchell Rd SE
UAP 2023 Construction 985,493 1,241,866
PORT ORCHARD
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 650,000 650,000
PORT ORCHARD
LED Streetlight Conversion
PSE Owned
LED 2021 Construction 200,000 200,000
PORT TOWNSEND
Tyler Street Overlay
Jefferson St to Lawrence St
APP 2024 Design 379,355 446,299
PORT TOWNSEND
Discovery Road
Rainier St to McClellan St
UAP 2022 Construction 2,481,424 5,566,751
PORT TOWNSEND
Lawrence Street Pedestrian Improvements
Harrison Street to Tyler Street
CSP 2026 Construction 567,525 997,964
PORT TOWNSEND
Washington Street and Walker Street Improvements
Washington St and Gaines St to Walker St and Jefferson St
ATP 2025 Design 198,600 234,000
POULSBO
Noll Road - Segment 3A
Mesford Rd to NE Kevos Pond Dr
UAP 2022 Design 1,360,000 3,020,000
POULSBO
Noll Road Phase 3B
Lincoln Rd NE to Kevos Pond Dr
UAP 2024 Design 1,200,000 3,868,100
POULSBO
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 600,000 600,000
POULSBO
LED Streetlight Conversion
PSE Owned
LED 2021 Construction 175,000 175,000
PULLMAN
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 750,000 750,000
PULLMAN
Downtown complete streets
Grand Avenue to Spring Street
CSP 2026 Construction 1,000,000 1,177,875
PUYALLUP
7th Street Sidewalk
9th St to 11th St
ATP 2024 Design 350,000 579,000
RAYMOND
2024 Red Town Initiative
Multiple Locations
SCPP 2025 Construction 1,214,937 1,278,881
RAYMOND
2024 SW Raymond Overlay
Multiple Locations
SCPP 2025 Construction 368,650 388,050
RAYMOND
Downtown Pedestrian Improvements
Multiple Locations
CSP 2026 Construction 689,637 726,118
REARDAN
Gravel Street Otta Seal
Multiple Locations
SCPP 2024 Construction 709,373 709,373
REDMOND
Redmond Way (SR 202) and NE 76th Street
Bear Ck to E Lake Samm Pkwy; SR 202 to Fred Meyer
UAP 2021 Construction 1,588,500 4,659,028
REDMOND
Bel Red Road Buffered Bike Lanes
NE 30th St to W Lake Sammamish Pkwy
ATP 2024 Design 650,000 3,062,000
RENTON
Rainier Avenue S/N
S 3rd St (SR 900) to NW 3rd Pl
UAP 2023 Construction 5,355,150 26,454,839
RENTON
SW 43rd Street
W C/L to SR 167 Ramps
UAP 2025 Design 2,975,154 5,979,841
RENTON
S 7th Street Improvements
Oakesdale Ave S to Burnett Ave S
ATP 2025 Construction 229,495 2,193,252
REPUBLIC
Gravel Street Otta Seal
Multiple Locations
SCPP 2024 Construction 1,087,433 1,087,433
RICHLAND
Downtown Connectivity Improvements
George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St
UAP 2024 Design 3,500,000 16,781,600
RICHLAND
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 450,000 450,000
RIDGEFIELD
S Royle Road
S 15th St to S 5th Way
UAP 2023 Construction 2,930,531 5,687,249
RIDGEFIELD
Hillhurst Pedestrian Improvements
Multiple Locations
CSP 2026 Construction 260,000 348,300
RITZVILLE
2024 Street Maintenance
Multiple Locations
SCPP 2025 Design 42,312 44,539
RITZVILLE
1st Avenue Improvements
Division St to Palouse St
SCAP 2025 Construction 375,432 418,525
RITZVILLE
6th Avenue Sidewalk
Division St to Chelan St
ATP 2024 Construction 378,528 407,468
ROCK ISLAND
Douglas Street Improvements
Rock Island Rd to 3rd St SW
SCAP 2025 Design 106,850 898,350
ROCKFORD
2024 Street Maintenance
Multiple Locations
SCPP 2025 Bid Auth 67,600 67,600
ROCKFORD
2024 Pavement Preservation
Multiple Locations
SCPP 2025 Design 160,450 160,450
ROSALIA
2024 Chip Seal
Multiple Locations
SCPP 2026 Construction 117,600 117,600
ROSLYN
2024 Maintenance Project
Multiple Locations
SCPP 2026 Bid Auth 300,000 315,790
ROY
2021 Overlay
McNaught St to Roy Elementary School
SCPP 2023 Construction 105,573 111,128
ROY
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Design 100,000 100,000
ROYAL CITY
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Construction 113,769 119,757
ROYAL CITY
2022 Overlay Award
Multiple Locations
SCPP 2024 Construction 439,973 463,130
ROYAL CITY
Apple Avenue NE Sidewalks
Camelia St to Slate Ln NE
SP 2023 Closeout 348,396 431,667
RUSTON
2024 Overlay
52nd to Park Ave
SCPP 2025 Design 352,222 370,760
RUSTON
Park Street
End of Road to Bennett St
SCAP 2023 Construction 879,049 1,288,116
SEATAC
Airport Station Pedestrian Improvements
S 176th St/32nd Ave S and S 180th St
UAP 2025 Design 4,000,000 27,417,979
SEATAC
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 600,000 600,000
SEATTLE
East Marginal Way S
S Atlantic to S Spokane St.
UAP 2020 Construction 3,000,000 19,393,875
SEATTLE
Lake Washington Blvd. renovations
Lake Park Drive S to S Juneau Street
CSP 2026 Construction 164,248 223,974
SEATTLE
4th Avenue S Walkway
S Royal Brougham Way to I 90 Off-Ramp
SP 2023 Construction 247,000 639,570
SEDRO WOOLLEY
2024 N Reed Street Overlay
SR 20 to Brickyard Creek
APP 2025 Construction 339,389 404,282
SEDRO WOOLLEY
Township Street (SR 9)
John Liner Rd / McGarigle Rd Intersection
UAP 2023 Design 3,404,134 4,255,167
SEDRO WOOLLEY
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 500,000 500,000
SEDRO WOOLLEY
Sidewalk and ADA Ramp Upgrades
Multiple Locations
CSP 2026 Construction 244,851 293,060
SEDRO WOOLLEY
Cascade Trail West Extension Phase 2A
Holtcamp Rd to Hodgin St
ATP 2024 Design 326,000 860,000
SELAH
E Goodlander Road Signal
Landcaster Rd Signal
UAP 2025 Construction 538,020 622,800
SEQUIM
N Sequim Avenue
Hendrickson St to Old Olympic Hwy
UAP 2022 Construction 1,073,186 4,227,100
SHELTON
Olympic Highway North
C S to Wallace Kneeland Blvd
UAP 2025 Design 3,688,752 4,098,614
SHORELINE
145th Street (SR 523)
3rd Ave NE to 5th Ave NE (I-5 Interchange)
UAP 2023 Construction 5,000,000 40,621,677
SHORELINE
N 145th Street (SR 523) Phase 1
Corliss Ave N to 3rd Ave NE
UAP 2024 Construction 5,000,000 11,845,978
SHORELINE
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 600,000 600,000
SHORELINE
8th Avenue NW Sidewalk
Sunset School Park to Richmond Beach Rd NW
ATP 2025 Design 330,000 1,870,942
SNOHOMISH
2022 Overlay Award
Multiple Locations
APP 2024 Design 424,999 500,000
SNOHOMISH
Avenue D Overlay
Multiple Locations
APP 2025 Design 455,353 535,710
SNOHOMISH
13th Street Intersection Improvements
Park Ave
ATP 2025 Design 177,539 208,870
SNOHOMISH COUNTY
35th Avenue W
156th St SW to 148th St SW
UAP 2023 Construction 3,062,777 4,000,864
SNOHOMISH COUNTY
Larch Way Roundabout
Locust Wy and Logan Rd
UAP 2024 Construction 2,875,000 4,205,001
SNOHOMISH COUNTY
Alderwood Mall Parkway
SR 525 to 168th St SW
UAP 2025 Design 4,500,000 16,155,483
SNOHOMISH COUNTY
Pedestrian improvements
Multiple Locations
CSP 2026 Construction 144,998 181,381
SNOHOMISH COUNTY
Puget Park Drive RRFBs
Various
ATP 2025 Design 195,914 301,406
SNOQUALMIE
384th Ave SE Sidewalk
Newton Ave to SE Kimball Creek Dr
ATP 2024 Construction 518,909 3,599,774
SOAP LAKE
2024 Scrub Seal - Red Town Initative
Multiple Locations
SCPP 2024 Construction 1,190,400 1,190,400
SOAP LAKE
Canna Street and 1st Avenue NE
Main Ave E to SR 17
SCAP 2023 Construction 1,002,500 1,039,580
SOAP LAKE
Main Avenue W
Cherry St S to Ginkgo St S
SCAP 2024 Construction 839,783 839,783
SOUTH BEND
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Design 2,000,000 2,105,263
SOUTH BEND
First Street
A St to C St
SCAP 2025 Design 546,587 575,354
SOUTH PRAIRIE
2024 Otta Seal
Multiple Locations
SCPP 2024 Design 145,000 145,000
SOUTH PRAIRIE
2024 Maintenance Project
Citywide Crack Seal
SCPP 2025 Design 3,130 3,130
SOUTH PRAIRIE
Pioneer Way E (SR 162)
Emery St
SCAP 2025 Design 785,622 785,622
SPANGLE
2024 Scrub Seal
Multiple Locations
SCPP 2025 Construction 354,858 354,858
SPOKANE
Thor / Freya Couplet
Hartson Ave to 150ft n/o Sprague Ave
UAP 2022 Construction 267,333 3,462,911
SPOKANE
Maple Street and Walnut Street
5th Ave to 1st Ave
UAP 2024 Design 920,400 1,534,000
SPOKANE
Riverside Ave.
Monroe St to Wall St
UAP 2025 Design 887,000 1,774,000
SPOKANE
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 300,000 300,000
SPOKANE
Traffic Calming - Cycle 10
Multiple Locations
CSP 2026 Construction 500,000 2,909,768
SPOKANE
Traffic Calming - Cycle 11
Multiple Locations
CSP 2026 Construction 413,837 1,085,924
SPOKANE
Haven Street Sidewalk
Rockwell Ave to Heroy Ave
SP 2023 Construction 177,348 283,276
SPOKANE COUNTY
Hatch Road Phase 1
MP 0.60 to MP 1.10
UAP 2024 Construction 1,511,795 2,019,726
SPOKANE COUNTY
Hatch Road Reconstruction Phase 2
MP 1.10 to MP 1.63
UAP 2025 Design 2,434,400 3,043,000
SPOKANE COUNTY
ADA and Ped Safety
Freya and Glenrose Streets
CSP 2026 Construction 334,446 386,193
SPOKANE COUNTY
Rowan Ave. ADA Ramp Replacement
Starr Rd to Idaho Rd
ATP 2025 Construction 336,437 446,456
SPOKANE VALLEY
Sprague Ave. Pedestrian Crossings
Chronicle Rd and McKinnon Rd
ATP 2025 Design 479,588 666,096
SPRAGUE
4th Street Sidewalk
SR 23 to E St
ATP 2024 Design 490,900 490,900
STEILACOOM
Townwide RRFB Project
Steilacoom Blvd, Union Ave and Puyallup St
ATP 2024 Construction 215,209 286,946
STEVENSON
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Construction 144,907 152,534
STEVENSON
2024 Chip Seal
Multiple Locations
SCPP 2025 Construction 163,740 172,360
STEVENSON
1st Street
Columbia St to Guardrail
SCAP 2025 Construction 225,175 1,013,958
SUMNER
Stewart Road White River Bridge
Butte Ave E to 140th Ave Ct E
UAP 2024 Construction 6,375,000 34,821,560
SUMNER
Pedestrian improvements
Multiple Locations
CSP 2026 Construction 448,175 702,310
SUMNER
Elm Street Sidewalks
Bonney Ave to Wright Ave
ATP 2024 Construction 299,877 419,478
SUNNYSIDE
Yakima Valley Highway Overlay
1st St to 6th St
APP 2025 Construction 336,252 437,715
SUNNYSIDE
Citywide pedestrian improvements
Multiple Locations
CSP 2026 Construction 514,227 614,972
SUNNYSIDE
6th Street
North Ave to Decatur Ave
SP 2023 Construction 348,542 4,256,439
TACOMA
E 64th Street
McKinley Ave E to Portland Ave
UAP 2023 Construction 3,026,443 6,255,753
TACOMA
Sheridan Avenue Phase 1
S 72nd St to S 64th St
UAP 2024 Design 3,560,000 5,954,332
TACOMA
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 450,000 450,000
TACOMA
McKinley overlook complete streets
East E Street to East F Street
CSP 2026 Construction 469,532 722,083
TACOMA
S Yakima Avenue Sidewalk
S 67th St to S 70th St
SP 2023 Closeout 268,983 476,064
TEKOA
2022 Seal Coat Award
Multiple Locations
SCPP 2024 Closeout 161,533 161,533
TENINO
2024 Park Avenue Overlay
6th St to Howard St
SCPP 2025 Closeout 278,792 305,742
THURSTON COUNTY
Marvin Road SE
22nd Ave to Union Mills Rd
UAP 2024 Construction 3,750,000 5,643,310
THURSTON COUNTY
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 600,000 600,000
TONASKET
2024 Street Maintenance
Multiple Locations
SCPP 2025 Closeout 282,896 282,896
TONASKET
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 50,000 50,000
TONASKET
Perfect Passage
1st Street to 4th Street
CSP 2026 Construction 1,017,153 6,298,435
TOPPENISH
Jackson Street and Juniper Street
Monroe Ave to Magnolia St
UAP 2023 Design 1,386,360 1,540,400
TUKWILA
West Valley Highway (SR 181)
Strander Bvd to I-405
UAP 2019 Closeout 2,115,432 4,790,215
TUKWILA
Southcenter Boulevard Signal
65th Avenue S
UAP 2025 Design 782,090 1,182,090
TUMWATER
Capitol Boulevard South, Trosper Road SE
Ruby St to Market, Linda St to I-5
UAP 2019 Construction 9,829,120 18,424,998
TUMWATER
Tumwater Boulevard
NB I-5 On/Off Ramp Intersection
UAP 2024 Design 2,250,000 6,250,000
TUMWATER
Linwood Avenue Sidewalk
Susitna Ln to 2nd Ave
SP 2023 Construction 371,250 1,741,572
TWISP
2024 Complete Streets
Multiple Locations
CSP 2026 Bid Auth 42,750 45,000
TWISP
North End SR 20 PedestrianBike Path
Twisp River Br to Days Ln
ATP 2025 Bid Auth 611,372 1,664,962
UNIVERSITY PLACE
Grandview Avenue Roundabout
36th St
UAP 2025 Design 664,480 830,600
VANCOUVER
SE 1st Street
SE 177th Ave to SE 192nd Ave
UAP 2021 Construction 1,892,899 11,369,281
VANCOUVER
W Fourth Plain Boulevard
Franklin St Intersection
UAP 2023 Construction 540,176 904,167
VANCOUVER
NE 137th Avenue
NE 49th St to NE Fourth Plain Blvd
UAP 2024 Construction 3,250,000 28,658,398
VANCOUVER
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 500,000 500,000
VANCOUVER
Fourth Plain Boulevard
Fort Vancouver Way to Andresen Road
CSP 2026 Construction 500,000 4,711,428
VANCOUVER
Hazel Dell Avenue Multiuse Path
Discovery Trail to Burnt Bridge Creek Greenway
ATP 2024 Design 500,000 683,000
WALLA WALLA
Clinton Street Overlay
Isaacs Ave to Sumach St
APP 2025 Construction 398,654 1,257,770
WALLA WALLA
E Chestnut Street Roundabout
Approximately 200ft north south east and west
UAP 2025 Design 1,110,000 1,510,000
WALLA WALLA
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 300,000 300,000
WALLA WALLA
Citywide pedestrian improvements
Multiple Locations
CSP 2026 Construction 564,694 951,202
WAPATO
2024 Otta Seal
Multiple Locations
SCPP 2025 Construction 950,000 1,000,000
WAPATO
S Naches Avenue
1st St to 4th St
SCAP 2024 Construction 725,284 763,457
WAPATO
N Ahtanum Avenue Reconstruction
W 1st St to End of Road
SCAP 2025 Design 807,975 850,500
WAPATO
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 50,000 50,000
WARDEN
2025 Red Town Initiative
Multiple Locations
SCPP 2026 Design 2,000,000 2,105,263
WARDEN
1st Street North Reconstruction
N County Rd to Railroad tracks
SCAP 2025 Design 1,772,700 1,866,000
WARDEN
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 75,000 75,000
WARDEN
W First Street (SR 170) Pathway
S County Rd to Railroad R/W
ATP 2024 Design 57,375 425,000
WASHOUGAL
2024 Main Street Overlay
Multiple Locations
APP 2025 Construction 722,690 967,582
WASHOUGAL
Evergreen Way Sidewalk
42nd St to Schmid Park
ATP 2025 Construction 392,345 461,582
WATERVILLE
2024 Street Maintenance
Multiple Locations
SCPP 2025 Construction 186,175 186,175
WAVERLY
2024 Scrub Seal
Multiple Locations
SCPP 2025 Construction 120,528 120,528
WENATCHEE
Springwater Avenue
Woodward Dr to Western Ave
UAP 2021 Construction 2,185,000 3,788,965
WENATCHEE
McKittrick Street
Pine St to Pershing St (City Limits)
UAP 2023 Construction 1,913,123 2,449,465
WENATCHEE
Red Apple Road
Vista Pl to Miller St
UAP 2024 Design 1,919,228 2,399,035
WENATCHEE
9th Street Corridor Improvements
Miller St to BNSF Railroad Crossing
UAP 2025 Design 1,199,000 1,499,170
WENATCHEE
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 600,000 600,000
WENATCHEE
Pedestrian Crossing Improvements
5th and Emerson
CSP 2026 Construction 33,121 301,374
WEST RICHLAND
School zone pedestrian improvements
Multiple Locations
CSP 2026 Construction 228,971 269,378
WEST RICHLAND
Candy Mountain pathway
500' West of Milky Way to Watkins Way
CSP 2026 Construction 151,500 244,117
WESTPORT
N Forrest Street
Ocean Ave to 400 ft n/o Sprague Ave
SCAP 2024 Construction 750,756 790,270
WILBUR
2024 Street Maintenance
Multiple Locations
SCPP 2025 Bid Auth 31,476 31,476
WILBUR
2024 Overlay
Multiple Locations
SCPP 2025 Design 716,277 716,277
WINLOCK
NW Arden Avenue
NW Fir St to W Walnut St
SCAP 2025 Design 814,076 856,923
WINTHROP
Horizon Flats Road
Twin Lakes Rd to 3650 feet south
SCAP 2023 Construction 885,529 932,136
WINTHROP
Bridge Street Improvement Project
Riverside Ave to Bluff St
ATP 2025 Design 528,675 556,500
WOODINVILLE
131st Avenue NE (SR 202) Trestle Replacement
NE 175th St to NE 177th Pl
UAP 2025 Design 5,000,000 16,287,938
WOODLAND
2024 S Pekin Overlay
Davidson Ave to n/o Marty Lp
APP 2025 Construction 651,569 723,955
YACOLT
W Hoag Street
Parcel Ave to Railroad Ave
SCAP 2025 Design 360,240 379,200
YAKIMA
N 1st Street
MLK Blvd to J St
UAP 2023 Construction 1,500,000 11,378,665
YAKIMA
34th Avenue Roundabouts
Fruitvale Boulevard to 34th Avenue
UAP 2025 Bid Auth 2,087,102 4,100,000
YAKIMA
Nob Hill Boulevard Improvements
S 4th Ave to S 15th Ave
UAP 2025 Construction 957,599 1,255,649
YAKIMA
Complete Streets Award
March 2022 Selection
CSP 2023 Construction 250,000 250,000
YAKIMA
Pedestrian improvements
Intersection at 5th Avenue and D Street
CSP 2026 Construction 198,300 631,900
YELM
ADA Ramp Rehabilitation
Multiple Locations
CSP 2026 Construction 261,545 307,700
ZILLAH
8th Street Improvements
Rainier Ave to First Ave
SCAP 2025 Construction 446,976 527,262