ABERDEEN 2022 Overlay Award Multiple Locations |
APP | 2024 | Application | 475,000 | 568,643 |
ABERDEEN E Market Street F St and Fuller Way Roundabout |
UAP | 2021 | Construction | 519,249 | 2,274,441 | |
ABERDEEN Sumner Avenue (SR 101) Sidewalk Oak St to Williams St |
ATP | 2024 | Application | 450,000 | 1,141,775 | |
![]() |
AIRWAY HEIGHTS 10th Avenue Extension 10th Ave terminus to Hayford Rd |
UAP | 2022 | Design | 2,467,406 | 3,544,295 |
AIRWAY HEIGHTS SR 2 Hayford Rd to Deer Heights Rd |
SP | 2020 | Construction | 97,269 | 549,632 | |
![]() |
ALGONA Citywide Crack Seal Multiple Location |
SCPP | 2024 | Design | 41,175 | 45,750 |
![]() |
ANACORTES Commercial Avenue (SR 20 Spur) 13th St to 11th St |
UAP | 2021 | Design | 950,000 | 3,525,442 |
![]() |
ANACORTES R Avenue Improvements 27th St to 34th St |
UAP | 2024 | Application | 550,000 | 4,718,218 |
![]() |
ANACORTES Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 400,000 | 400,000 |
ARLINGTON 211th Place SR 530 to 67th Ave NE |
UAP | 2024 | Application | 2,300,000 | 2,885,118 | |
AUBURN 2nd Street SE A St SE to Auburn Way S |
UAP | 2021 | Construction | 452,776 | 810,483 | |
AUBURN 4th Street SE Auburn Way S to L St SE |
UAP | 2022 | Construction | 1,687,835 | 2,906,685 | |
![]() |
BATTLE GROUND 2022 Overlay Award Multiple Locations |
APP | 2024 | Application | 468,157 | 550,773 |
BATTLE GROUND SE Grace Avenue - Phase II NE 1st St to SE Rasmussen Blvd |
UAP | 2023 | Design | 3,000,000 | 6,310,056 | |
![]() |
BATTLE GROUND Complete Streets Award March 2019 Selection |
CSP | 2020 | Construction | 350,000 | 350,000 |
BELLEVUE 124th Avenue NE NE 12th St to NE Spring Blvd |
UAP | 2021 | Construction | 5,000,000 | 10,017,148 | |
![]() |
BELLEVUE 150th Avenue SE 28th St to SE 38th St |
UAP | 2024 | Application | 3,990,000 | 10,966,587 |
BELLEVUE NE 8th Street Parcel Frontage at 11635 NE 8th St |
SP | 2023 | Design | 354,480 | 547,735 | |
BELLINGHAM Meridian St W Illinois St Roundabout |
UAP | 2022 | Design | 500,000 | 650,000 | |
BELLINGHAM Lincoln St/E Maple Street Lincoln St to Consolidation Ave |
UAP | 2023 | Design | 480,000 | 650,000 | |
![]() |
BELLINGHAM 12th Street and Finnegan Way McKenzie St and 11th St |
UAP | 2024 | Application | 400,000 | 500,000 |
![]() |
BELLINGHAM Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 500,000 | 500,000 |
![]() |
BENTON CITY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 401,901 | 423,054 |
BINGEN 2022 Overlay Award Willow Street |
SCPP | 2024 | Design | 172,416 | 181,490 | |
BINGEN 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Design | 36,813 | 38,750 | |
BLAINE Boblett Street Yew Ave to Ludwick Ave |
UAP | 2022 | Design | 1,161,862 | 3,190,964 | |
BREMERTON E 11th Street and Perry Avenue Pitt Avenue to E 17th Street |
UAP | 2020 | Construction | 4,341,916 | 7,287,140 | |
BREMERTON Washington Avenue / 11th Street Pacific Ave to Manette Bridge |
UAP | 2023 | Design | 1,742,143 | 6,006,743 | |
![]() |
BREMERTON Complete Streets Award March 2019 Selection |
CSP | 2020 | Construction | 350,000 | 350,000 |
BREMERTON Wheaton Way and E 11th Street Sidewalk Wheaton Way and E 11th St Nipsic Ave to Trenton Ave |
SP | 2023 | Construction | 106,400 | 140,000 | |
BREWSTER 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Design | 24,225 | 25,500 | |
BREWSTER Old Hwy 97 US 97 to North C/L |
SCAP | 2024 | Design | 182,520 | 1,563,006 | |
![]() |
BRIDGEPORT 16th Street Overlay Douglas Ave to Fairview Ave |
SCPP | 2024 | Application | 299,000 | 299,000 |
![]() |
BRIER 2022 Overlay Award Multiple Locations |
APP | 2024 | Application | 1,045,500 | 1,230,000 |
![]() |
BUCKLEY Hinkleman Road Rehabilitation Hinkleman Ext to 28307 Hinkleman Rd |
APP | 2023 | Design | 278,472 | 327,615 |
BUCKLEY Foothills Trail Crossing Main St |
ATP | 2024 | Design | 218,101 | 272,644 | |
BUCODA FY 2021 Seal Coat Project Multiple Locations |
SCPP | 2021 | Construction | 115,545 | 116,443 | |
BURIEN S 136th Street 1st Ave S to Des Moines Memorial Dr S |
UAP | 2023 | Construction | 4,121,540 | 5,857,312 | |
![]() |
BURIEN SW 148th Street 4th Ave SW to 6th Ave SW |
UAP | 2024 | Design | 3,932,160 | 4,915,200 |
BURLINGTON 2023 Overlay Award Multiple Locations |
APP | 2024 | Design | 591,999 | 696,540 | |
BURLINGTON East-West Connector Burlington Blvd to Walnut Street |
UAP | 2019 | Design | 2,688,618 | 3,163,080 | |
![]() |
BURLINGTON LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 150,000 | 150,000 |
CARBONADO FY 2022 Overlay Project Multiple Locations |
SCPP | 2022 | Closeout | 190,182 | 200,191 | |
CARBONADO 7th Street Sidewalk OFerrell Dr to Wingate Dr |
ATP | 2024 | Application | 274,512 | 288,960 | |
CARNATION 2021 Overlay Multiple Locations |
SCPP | 2023 | Design | 176,060 | 199,580 | |
![]() |
CARNATION Citywide Crack Seal Multiple Locations |
SCPP | 2024 | Design | 92,899 | 97,788 |
![]() |
CARNATION E Bird Street E Commercial St to Milwaukee Ave |
SCAP | 2024 | Design | 681,700 | 802,000 |
CARNATION McKinley Street Eugene St to Blanche St |
SCAP | 2024 | Design | 471,680 | 846,200 | |
CASHMERE Sunset Highway City Limits to Mill Site |
SCAP | 2023 | Design | 125,000 | 1,286,603 | |
![]() |
CASTLE ROCK Complete Streets Award March 2019 Selection |
CSP | 2020 | Construction | 200,000 | 200,000 |
![]() |
CENTRALIA Galvin Street Overlay Harrison Ave to Chehalis River Bridge |
APP | 2024 | Design | 1,189,150 | 1,459,000 |
![]() |
CENTRALIA S Gold Street Main St to Summa St |
UAP | 2024 | Design | 1,194,902 | 1,405,768 |
CHEHALIS Main Street Overlay I 5 to BNSF R/W |
APP | 2023 | Design | 586,170 | 651,300 | |
CHEHALIS National Avenue Overlay Chamber Way to Kresky Ave |
APP | 2023 | Construction | 443,247 | 502,488 | |
![]() |
CHELAN Complete Streets Award March 2019 Selection |
CSP | 2020 | Construction | 150,000 | 150,000 |
CHELAN COUNTY Knowles Road School Street to American Fruit Road |
UAP | 2020 | Construction | 1,397,007 | 2,737,210 | |
CHENEY 2021 Overlay Multiple Locations |
APP | 2023 | Design | 533,300 | 592,525 | |
CHENEY N 6th Street Roundabout Betz Road |
UAP | 2024 | Application | 966,854 | 1,074,283 | |
![]() |
CHEWELAH W Main Avenue SR 395 to Hunt St |
SCAP | 2024 | Application | 1,117,660 | 1,189,000 |
CLARK COUNTY NE 99th Street NE 94th Ave to vicinity of NE 117th Ave (SR 503) |
UAP | 2022 | Construction | 3,150,000 | 16,640,330 | |
![]() |
CLARK COUNTY Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 750,000 | 750,000 |
CLARK COUNTY NE Hazel Dell Avenue NE 99th St to NE 117th St |
SP | 2021 | Construction | 300,000 | 1,795,000 | |
![]() |
CLARK COUNTY NE 68th Street Sidewalk Highway 99 to NE St Johns Rd |
SP | 2023 | Design | 400,000 | 4,429,000 |
CLARK COUNTY Truman School Sidewalk NE 40th Ave and NE 44th St |
ATP | 2024 | Application | 200,000 | 430,000 | |
![]() |
CLE ELUM 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 41,799 | 43,999 |
![]() |
CLE ELUM First Street Douglas Munro Blvd Intersection |
SCAP | 2023 | Construction | 650,920 | 691,660 |
CLE ELUM First Street Pennsylvania Ave to Harris Ave |
SCAP | 2024 | Application | 718,849 | 756,684 | |
![]() |
CLE ELUM Second Street Roundabout Second St (SR 903) and Stafford Ave |
SCAP | 2024 | Application | 704,591 | 741,675 |
![]() |
CLE ELUM Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 350,000 | 350,000 |
COLFAX Morton and Sumner Streets Morton Tyler to 4th Sumner 1st to 4th |
SCAP | 2024 | Design | 1,286,252 | 1,353,950 | |
COLLEGE PLACE NE Damson Avenue Cargill Ave to Rose St |
UAP | 2024 | Application | 943,200 | 1,048,000 | |
COLTON 2022 Chip Seal Award Multiple Locations |
SCPP | 2024 | Design | 127,725 | 127,725 | |
![]() |
COLVILLE Summit Street Ivy Ave to Miner St |
SCAP | 2023 | Design | 1,383,500 | 1,537,200 |
![]() |
CONCRETE 2021 Overlay Multiple Locations |
SCPP | 2023 | Construction | 344,536 | 364,670 |
CONCRETE Secondary Access SR 20 to Airport Way |
SCAP | 2023 | Design | 500,000 | 3,414,000 | |
CONNELL S Fifth Avenue W Hawthorn St to W Juniper St |
SCAP | 2023 | Design | 443,448 | 492,720 | |
![]() |
COULEE CITY FY 2022 Overlay Project Multiple Locations |
SCPP | 2022 | Closeout | 234,267 | 234,267 |
![]() |
COULEE CITY 2021 Seal Coat W Lincoln St and W Locust St |
SCPP | 2023 | Closeout | 103,109 | 103,109 |
COULEE CITY Walnut Street Overlay 4th St to Mc Entee St |
SCAP | 2024 | Application | 60,751 | 450,000 | |
![]() |
COULEE DAM 6th Street Aspen St to Central Drive |
SCAP | 2023 | Bid Auth | 782,510 | 782,510 |
![]() |
COUPEVILLE 2021 Overlay Multiple Locations |
SCPP | 2023 | Construction | 190,528 | 200,556 |
![]() |
COUPEVILLE 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Application | 276,556 | 291,111 |
![]() |
COUPEVILLE 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 141,598 | 149,051 |
![]() |
COUPEVILLE NW Coveland and 1st Street Sidewalk NW Coveland |
SP | 2023 | Construction | 89,893 | 109,930 |
![]() |
COUPEVILLE NW 6th Street Trail NW Krueger to NW Wilkes |
SP | 2023 | Construction | 50,245 | 52,889 |
![]() |
COUPEVILLE Front and N Main Street Sidewalks Multiple Locations |
ATP | 2024 | Application | 325,123 | 871,514 |
COVINGTON SE 256th Street Overlay 148th Ave SE to 156th Ave SE |
APP | 2024 | Application | 692,836 | 815,100 | |
COVINGTON Lakepointe Boulevard SR 18 to SE 258th St |
UAP | 2021 | Design | 3,500,000 | 4,938,583 | |
![]() |
COVINGTON Lakepointe Boulevard SR 18 to SE 258th St |
UAP | 2021 | Design | 0 | 18,731,168 |
COVINGTON SE 256th Street SR 18 WB Ramp to SR 18 EB Ramp |
UAP | 2022 | Construction | 2,294,971 | 11,346,553 | |
DAVENPORT 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 236,200 | 236,200 | |
DAYTON FY 2022 Overlay Project Multiple Locations |
SCPP | 2022 | Design | 300,780 | 334,200 | |
![]() |
DAYTON N 3rd Street Main St to Dayton Ave |
SCAP | 2023 | Design | 1,177,890 | 1,239,885 |
![]() |
DAYTON Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 80,000 | 80,000 |
DES MOINES 24th Avenue S Kent-Des Moines Rd (SR 516) to S 223rd St |
UAP | 2021 | Design | 3,663,432 | 5,305,493 | |
![]() |
DUPONT LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 11,550 | 11,550 |
DUVALL 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 399,500 | 470,000 | |
EAST WENATCHEE 2022 Overlay Award McGee St SE to Grant Rd |
APP | 2024 | Application | 446,250 | 525,000 | |
EAST WENATCHEE 3rd Street SE Rock Island Rd Intersection |
UAP | 2023 | Design | 807,415 | 949,901 | |
EAST WENATCHEE 19th Street NW Phase 1 SR 28 to Bella Rio Apartments |
UAP | 2024 | Application | 2,000,000 | 4,558,136 | |
![]() |
EAST WENATCHEE Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 300,000 | 300,000 |
![]() |
EATONVILLE Carter Street W Antonie Ave N to Orchard Ave N |
SCAP | 2023 | Construction | 260,580 | 289,533 |
EATONVILLE View Crest Drive and Center Street Center St W to Dow Ridge Dr |
SCAP | 2024 | Design | 432,799 | 456,776 | |
EATONVILLE Washington Avenue North (SR 161) Lynch Creek Rd E to 250 ft N of Center St E |
SCAP | 2021 | Construction | 155,125 | 3,277,132 | |
![]() |
ELECTRIC CITY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 335,054 | 335,054 |
ELECTRIC CITY 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Application | 37,750 | 37,750 | |
ELLENSBURG Main Street Overlay 3rd Ave to University Way |
APP | 2024 | Design | 400,000 | 608,200 | |
ELLENSBURG Alder Street I/S and PTC Reconnect - 14th Ave to Event Center |
UAP | 2022 | Construction | 1,203,647 | 2,133,726 | |
![]() |
ELLENSBURG Pfenning Road Sidewalk 240ft n/o Vantage Hwy to Radio Rd |
UAP | 2024 | Design | 1,390,000 | 2,138,500 |
ELMA 12th Street Improvements Wakefield Ave to Harding St |
SCAP | 2022 | Construction | 414,891 | 629,500 | |
ENUMCLAW 244th Avenue Overlay 244th Avenue |
APP | 2024 | Application | 172,476 | 202,913 | |
![]() |
ENUMCLAW 244th Avenue Roundabout Roosevelt Ave |
UAP | 2024 | Application | 558,024 | 741,500 |
ENUMCLAW In Fill Sidewalk Various gaps |
ATP | 2024 | Application | 330,504 | 388,828 | |
EPHRATA Nat Washington Way Overlay A Street SE to 2nd Ave SE |
APP | 2024 | Design | 563,134 | 625,705 | |
FEDERAL WAY S 288th Street 16th Ave S to 34th Ave S |
UAP | 2022 | Design | 2,000,000 | 3,500,000 | |
FEDERAL WAY Pacific Highway S (SR 99) S C/L to Weigh Station |
UAP | 2023 | Design | 2,500,000 | 3,770,000 | |
FEDERAL WAY Lakota MS - SW Dash Point Road 21st Ave SW to SW 312th St |
SP | 2020 | Construction | 500,000 | 2,517,536 | |
FEDERAL WAY Citywide Pedestrian Crossings RRFB Crossings |
ATP | 2024 | Application | 350,001 | 503,211 | |
FERNDALE Thornton Street Malloy Avenue to 2nd Avenue Roundabout |
UAP | 2020 | Construction | 2,495,394 | 23,013,259 | |
FIFE N Levee Road Overlay 70th Ave E to Freeman Rd E |
APP | 2024 | Application | 1,029,265 | 1,211,265 | |
FIRCREST 2022 Overlay Award Multiple Locations |
APP | 2024 | Application | 678,470 | 753,856 | |
![]() |
FORKS Citywide Crack Seal Program |
SCPP | 2023 | Construction | 109,462 | 115,223 |
![]() |
FRIDAY HARBOR 2022 Pavement Repairs |
SCPP | 2023 | Construction | 50,000 | 58,925 |
![]() |
FRIDAY HARBOR 1st Street Overlay Spring St to Court St |
SCAP | 2022 | Construction | 519,792 | 617,510 |
![]() |
FRIDAY HARBOR Nash Street Market St to Spruce St |
SCAP | 2023 | Design | 669,783 | 787,980 |
![]() |
FRIDAY HARBOR Marguerite Place Spring St to Park St |
SCAP | 2023 | Design | 800,000 | 1,565,314 |
![]() |
GARFIELD 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 75,144 | 75,144 |
![]() |
GARFIELD 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Application | 10,675 | 10,675 |
![]() |
GEORGE 2022 Overlay Award Washington Wy to E Deacon St |
SCPP | 2024 | Application | 486,700 | 486,700 |
![]() |
GEORGE 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Application | 20,655 | 20,655 |
GEORGE Washington Way N Richmond Ave to Frontage Rd |
SCAP | 2023 | Design | 699,580 | 736,400 | |
GIG HARBOR Stinson Avenue Harborview Drive Roundabout |
UAP | 2021 | Construction | 816,000 | 2,338,188 | |
GOLD BAR 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Design | 405,131 | 426,230 | |
GOLDENDALE W Byars Street Mill St to Columbus Ave |
SCAP | 2022 | Construction | 716,569 | 853,247 | |
GRAND COULEE 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 78,980 | 78,980 | |
GRAND COULEE 2022 Crack Seal Citywide |
SCPP | 2024 | Design | 77,000 | 77,000 | |
GRAND COULEE James Saunder Street and Fortuyn Road Burdin Blvd to 2nd St |
SCAP | 2024 | Design | 800,000 | 800,000 | |
GRANDVIEW West Fifth and Elm Street Overlay Multiple Locations |
APP | 2024 | Design | 523,922 | 582,135 | |
GRANDVIEW Wine Country Road McCreadie Rd Intersection |
UAP | 2023 | Design | 1,512,684 | 1,680,760 | |
GRANGER Main Street Phase 1 1st St to 2nd St |
SCAP | 2023 | Design | 936,439 | 985,726 | |
GRANITE FALLS N Alder Avenue Overlay Stanley St to Alpine St |
SCPP | 2024 | Design | 408,000 | 429,500 | |
GRANITE FALLS Galena Street Extension Stanley St to Portage Ave |
SCAP | 2023 | Design | 600,000 | 1,730,520 | |
GRANITE FALLS W Stanley Street Sidewalk Jordan Rd to Prospect Ave |
ATP | 2024 | Design | 496,400 | 522,600 | |
HARTLINE 2021 Small City Maintenance Multiple Locations |
SCPP | 2023 | Construction | 55,750 | 55,750 | |
![]() |
HOQUIAM City of Hoquiam Safe Routes to School City of Hoquiam |
ATP | 2024 | Design | 361,000 | 1,801,000 |
ISSAQUAH 12th Avenue NW SR 900 to Lake Dr |
UAP | 2023 | Bid Auth | 3,000,000 | 5,016,307 | |
![]() |
ISSAQUAH Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 500,000 | 500,000 |
KAHLOTUS 2022 Crack Seal Award Multiple Locations |
SCPP | 2024 | Design | 148,028 | 148,028 | |
![]() |
KALAMA 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Design | 35,625 | 37,500 |
![]() |
KALAMA Cedar Street and S 10th Street Sidewalk Near 8th St to 10th St and Cedar St to 225 ft south |
SP | 2023 | Design | 360,010 | 400,010 |
KALAMA S 10th Street and Date Street Sidewalk Cedar St to 330ft North and Date St from 8th St to 9th St |
ATP | 2024 | Design | 311,400 | 346,000 | |
KELSO Old Pacific Highway Overlay S C/L to 1950ft north |
APP | 2024 | Design | 483,596 | 537,329 | |
![]() |
KENMORE 73rd Avenue NE NE 181st St and NE 192nd St |
UAP | 2024 | Application | 800,000 | 1,200,050 |
KENNEWICK Columbia Center Boulevard Deschutes Ave Intersection |
UAP | 2023 | Design | 1,280,000 | 1,600,000 | |
KENT Reith Road 140ft s/o S 253rd St to 200ft w/o SR 516 |
UAP | 2023 | Design | 1,595,000 | 2,492,795 | |
![]() |
KENT Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 750,000 | 750,000 |
KENT Russell Road Hogan Park Frontage |
SP | 2023 | Construction | 793,799 | 1,073,130 | |
![]() |
KETTLE FALLS 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 237,996 | 251,976 |
KING COUNTY 68th Avenue S / S 124th Street Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St |
UAP | 2023 | Design | 1,706,037 | 2,132,547 | |
KING COUNTY Redmond Ridge Dr NE Roundabout NE Alder Crest Dr |
UAP | 2024 | Application | 966,545 | 1,766,795 | |
KIRKLAND 100th Avenue NE NE 138th Pl to NE 145th St |
UAP | 2021 | Bid Auth | 3,000,000 | 13,730,000 | |
KIRKLAND 132nd Avenue NE NE 110th Pl to NE 97th St |
SP | 2023 | Design | 125,001 | 483,590 | |
KITSAP COUNTY Greaves Way Old Frontier Rd Roundabout |
UAP | 2021 | Construction | 1,422,550 | 2,308,242 | |
KITSAP COUNTY SE Lund Avenue Harris Rd SE Intersection |
UAP | 2023 | Design | 1,781,714 | 2,227,143 | |
![]() |
KITSAP COUNTY Lund Avenue SE Harris Rd SE to Chase Rd SE |
UAP | 2024 | Application | 1,882,645 | 2,358,305 |
![]() |
KITTITAS 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Design | 67,987 | 71,565 |
![]() |
KITTITAS Pierce Street Patrick Ave to Bus Barn(EOR) |
SCAP | 2023 | Design | 477,000 | 530,000 |
KITTITAS E 1st Avenue Main St to East C/L |
SCAP | 2020 | Construction | 87,751 | 650,002 | |
LACEY College Street NE Martin Way to 15th Ave NE |
UAP | 2022 | Design | 2,830,000 | 4,800,000 | |
LACROSSE Main Avenue and 2nd Street Sidewalk 2nd Street from Main Ave to Crystal Ave |
SP | 2023 | Design | 277,542 | 277,542 | |
LACROSSE Main Street Sidewalks 2nd St to A St |
ATP | 2024 | Design | 414,200 | 414,200 | |
LAKE FOREST PARK SR 104 40th Pl NE Roundabout |
UAP | 2021 | Design | 2,561,198 | 3,240,000 | |
LAKE STEVENS 91st Avenue SE / 24th Street SE / S Lake Stevens Road 21st St SE to W leg of SR 9 Roundabout |
UAP | 2022 | Construction | 3,000,000 | 12,843,514 | |
LAKEWOOD Washington Boulevard / Edgewood Avenue / North Gate Road W C/L to Interlaaken Dr |
UAP | 2023 | Construction | 3,784,273 | 9,705,998 | |
![]() |
LAKEWOOD Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 746,000 | 746,000 |
![]() |
LAKEWOOD Steilacoom Boulevard SW Sidewalk 87th Ave SW to Weller Rd SW |
SP | 2023 | Design | 442,680 | 4,963,000 |
![]() |
LAKEWOOD Union Avenue SW Sidewalk 200 ft s/o Orchard St SW to Spruce St SW |
ATP | 2024 | Design | 500,000 | 1,045,000 |
![]() |
LEAVENWORTH Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 75,000 | 75,000 |
![]() |
LEAVENWORTH Ski Hill Drive Sidewalk Evans St and SR 2 |
SP | 2023 | Design | 333,965 | 392,900 |
![]() |
LONG BEACH Ocean Beach Boulevard Overlay Pioneer Rd W to 26th St NW |
SCPP | 2024 | Application | 204,915 | 215,700 |
![]() |
LONG BEACH Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 75,000 | 75,000 |
LONGVIEW 46th Avenue SR 4 to Olympia Way |
UAP | 2021 | Bid Auth | 3,099,544 | 4,874,455 | |
![]() |
LONGVIEW Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 400,000 | 400,000 |
![]() |
LYMAN 2021 Overlay Multiple Locations |
SCPP | 2023 | Construction | 160,719 | 160,719 |
![]() |
LYNDEN 2021 Overlay Multiple Locations |
APP | 2023 | Construction | 358,898 | 1,063,368 |
![]() |
LYNDEN 2022 Overlay Award Multiple Locations |
APP | 2024 | Design | 599,999 | 1,024,571 |
LYNNWOOD Poplar Way Bridge 196th St SW to Alderwood Mall Blvd |
UAP | 2024 | Design | 5,000,000 | 42,085,000 | |
MABTON S Main Street Overlay South St to Maple St |
SCPP | 2023 | Design | 400,000 | 400,000 | |
![]() |
MABTON 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Application | 105,510 | 105,510 |
MABTON Main Street Reconstruction Project Washington St to SR 22 |
SCAP | 2022 | Design | 351,675 | 2,605,000 | |
![]() |
MABTON Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 |
![]() |
MAPLE VALLEY Maple Valley Highway (SR 169) SE 253rd Pl to SE 260th St |
UAP | 2024 | Application | 3,500,000 | 20,220,000 |
MARYSVILLE State Avenue 104th Pl NE to 116th St NE |
UAP | 2022 | Bid Auth | 4,000,000 | 7,866,027 | |
MARYSVILLE 53rd Ave NE Shared Used Path 61st St NE to SR 528 |
ATP | 2024 | Application | 320,000 | 412,000 | |
![]() |
MATTAWA 8th Street / Selkirk Avenue Portage Ave to 4th St |
SCAP | 2023 | Closeout | 482,820 | 536,467 |
![]() |
MATTAWA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 100,000 | 100,000 |
MEDICAL LAKE 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Application | 218,318 | 229,808 | |
MEDICAL LAKE Barker Street Lefevre St (SR 902) to Stanley St |
UAP | 2023 | Design | 679,914 | 755,460 | |
![]() |
MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Application | 639,400 | 695,000 |
MEDINA Upland Road Overlay Overlake Drive W to NE 6th St |
SCPP | 2024 | Design | 231,660 | 257,400 | |
![]() |
MEDINA Citywide Crack Seal Multiple Locations |
SCPP | 2024 | Design | 83,250 | 92,500 |
MEDINA Medina Elementary School Sidewalks NE 8th St to Overlake Dr W |
ATP | 2024 | Design | 102,800 | 121,050 | |
![]() |
MESA 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Application | 30,000 | 30,000 |
MILTON 2022 Overlay Award Multiple Locations |
APP | 2024 | Application | 485,760 | 571,488 | |
MILTON Pacific Highway S (SR 99) Porter Way Intersection |
UAP | 2021 | Bid Auth | 2,939,591 | 3,266,213 | |
![]() |
MONROE 2022 Overlay Award Multiple Locations |
APP | 2024 | Application | 798,445 | 1,140,637 |
![]() |
MONROE Fryelands Boulevard Pedestrian Crossings 152nd St SE and 146th St SE |
ATP | 2024 | Application | 66,500 | 95,000 |
![]() |
MONTESANO 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Design | 216,000 | 244,800 |
![]() |
MONTESANO 2022 Chip Seal Award Multiple Locations |
SCPP | 2024 | Design | 99,500 | 105,100 |
![]() |
MONTESANO 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Design | 61,750 | 65,000 |
![]() |
MONTESANO W Pioneer Avenue 4th St to 6th St |
SCAP | 2024 | Design | 770,442 | 847,000 |
![]() |
MONTESANO W. Pioneer Avenue Main to 4th |
SCAP | 2024 | Design | 189,000 | 1,897,100 |
![]() |
MONTESANO McBryde Avenue Sidewalk Phase 3 Calder ROW to Satsop St |
ATP | 2024 | Design | 188,000 | 208,000 |
MORTON 2022 Overlay Award City Wide |
SCAP | 2024 | Design | 463,420 | 635,000 | |
MORTON Main Avenue Elementary School to Backstrom Park |
SP | 2019 | Construction | 85,000 | 527,019 | |
![]() |
MOSES LAKE Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 105,000 | 105,000 |
MOUNT VERNON Hoag Road and Laventure Road Laventure Rd Intersection |
UAP | 2022 | Design | 1,300,000 | 1,648,000 | |
MOUNTLAKE TERRACE 66th Avenue W 220th St SW to N City Limits |
UAP | 2021 | Bid Auth | 2,353,000 | 3,495,000 | |
MOUNTLAKE TERRACE 56th Avenue W 170ft n/o 236th St SW to 475ft n/o 230th St SW |
UAP | 2024 | Design | 5,000,000 | 18,537,805 | |
![]() |
MOXEE 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Application | 78,090 | 82,200 |
![]() |
MOXEE Morrier Lane Extension Duffield Rd Roundabout to Mieras Rd |
SCAP | 2022 | Construction | 271,046 | 2,035,540 |
![]() |
MUKILTEO Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 200,000 | 200,000 |
![]() |
NAPAVINE 2023 Rush Road Repairs Varies |
SCAP | 2024 | Application | 262,574 | 276,394 |
![]() |
NEWPORT 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Design | 370,017 | 389,491 |
NORMANDY PARK 2021 Overlay Multiple Locations |
APP | 2023 | Construction | 144,820 | 204,876 | |
NORMANDY PARK 1st Avenue Sidewalk S 174th St to SW 176th St |
SP | 2023 | Design | 305,840 | 382,300 | |
![]() |
NORTH BEND North Bend Way Overlay 8th S to W C/L |
APP | 2023 | Design | 657,828 | 782,096 |
![]() |
NORTH BEND Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 300,000 | 300,000 |
![]() |
OAK HARBOR W Whidbey Avenue Overlay SW Jib St to Oak Harbor St |
APP | 2024 | Application | 485,297 | 570,938 |
![]() |
OAK HARBOR NE 7th Avenue e/o Oak Harbor St to Harvest Dr |
UAP | 2024 | Application | 837,185 | 2,040,000 |
![]() |
OAK HARBOR LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 220,000 | 220,000 |
![]() |
OAKVILLE School Street and W Pine Street SR 12 to Ash St and SR 12 to School St |
SCAP | 2024 | Application | 638,743 | 638,743 |
OCEAN SHORES Point Brown Pedestrian Crossing Between Chance a La Mer and Shoal St |
SP | 2023 | Bid Auth | 181,700 | 230,000 | |
OKANOGAN Lower Pine Street 5th Ave to 3rd Ave |
SCAP | 2021 | Construction | 343,786 | 381,985 | |
OKANOGAN Oak Street 2nd Ave to Bridge e/o 1st Ave |
SCAP | 2023 | Design | 74,250 | 550,000 | |
OLYMPIA Fones Road SE Pacific Ave SE to 18th Ave SE |
UAP | 2023 | Design | 2,000,000 | 14,215,487 | |
![]() |
OLYMPIA Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 300,000 | 300,000 |
OLYMPIA 4th Avenue and State Avenue Intersection with Franklin St |
SP | 2020 | Construction | 342,338 | 647,655 | |
OMAK 2021 Seal Coat Multiple Locations |
SCPP | 2023 | Construction | 167,483 | 176,298 | |
OMAK 2022 Chip Seal Award Multiple Locations |
SCPP | 2024 | Application | 87,495 | 92,100 | |
OMAK Engh Road Omache Dr to Omak River Rd |
SCAP | 2020 | Construction | 148,450 | 1,099,632 | |
OMAK 5th Avenue Benton St to SR 97 |
SP | 2021 | Bid Auth | 244,150 | 257,000 | |
![]() |
OROVILLE 2021 Seal Coat Multiple Locations |
SCPP | 2023 | Bid Auth | 186,107 | 195,902 |
![]() |
OROVILLE Ironwood Street 12th Ave to 17th Ave |
SCAP | 2024 | Application | 1,195,480 | 1,258,400 |
OROVILLE Central Avenue W W C/L to Main St (SR 97) |
SCAP | 2020 | Construction | 73,827 | 546,865 | |
![]() |
OTHELLO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 400,000 | 400,000 |
PACIFIC Stewart Road (8th Street East) Valentine Avenue to Butte Avenue |
UAP | 2019 | Construction | 4,877,200 | 6,601,970 | |
![]() |
PACIFIC LED Streetlight Conversion PSE Owned |
LED | 2020 | Construction | 110,250 | 110,250 |
![]() |
PALOUSE Complete Streets Award March 2019 Selection |
CSP | 2020 | Construction | 200,000 | 200,000 |
PASCO Lewis Street 2nd Ave to Oregon Ave (SR 397) |
UAP | 2021 | Construction | 5,000,000 | 25,690,769 | |
PATEROS Warren Avenue Riverside Dr to Chris St |
SP | 2021 | Construction | 455,595 | 455,595 | |
PATEROS Downtown ADA Improvements Multiple Locations |
ATP | 2024 | Design | 369,377 | 369,377 | |
PE ELL Main Street Chehalis Ave to SR 6 |
SCAP | 2024 | Design | 442,422 | 442,422 | |
PE ELL Main Street Sidewalk E 7th Ave to E 6th Ave |
ATP | 2024 | Design | 75,576 | 75,576 | |
PIERCE COUNTY Canyon Rd E 400 ft N of 84th St E to 530 ft N of 72nd St E |
UAP | 2022 | Construction | 4,000,000 | 8,535,329 | |
PIERCE COUNTY Canyon Road E 208th St E to 200th St E |
UAP | 2023 | Construction | 2,000,000 | 11,403,610 | |
![]() |
PORT ANGELES 8th Street Lincoln St to A St |
UAP | 2024 | Application | 1,464,365 | 1,904,365 |
![]() |
PORT ORCHARD 2022 Overlay Award SR 16 to McCormick Woods Dr |
APP | 2024 | Application | 367,624 | 490,165 |
PORT ORCHARD Bethel Avenue Bethel Rd, Lincoln Ave SE, Mitchell Rd SE |
UAP | 2023 | Design | 1,170,000 | 3,011,000 | |
![]() |
PORT ORCHARD Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 650,000 | 650,000 |
![]() |
PORT ORCHARD LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 200,000 | 200,000 |
![]() |
PORT TOWNSEND Tyler Street Overlay Jefferson St to Lawrence St |
APP | 2024 | Application | 379,355 | 446,299 |
PORT TOWNSEND Discovery Road Rainier St to McClellan St |
UAP | 2022 | Design | 2,629,618 | 5,213,578 | |
![]() |
PORT TOWNSEND LED Streetlight Conversion PUD Owned |
LED | 2021 | Construction | 177,460 | 177,460 |
POULSBO Noll Road and Johnson Parkway SR 305 to Storhoff Rd/Noll Rd Intersection |
UAP | 2020 | Construction | 1,500,000 | 15,135,712 | |
POULSBO Noll Road - Segment 3A Mesford Rd to NE Kevos Pond Dr |
UAP | 2022 | Design | 1,360,000 | 3,020,000 | |
![]() |
POULSBO Noll Road Phase 3B Lincoln Rd NE to Kevos Pond Dr |
UAP | 2024 | Application | 1,200,000 | 3,868,100 |
![]() |
POULSBO Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 600,000 | 600,000 |
![]() |
POULSBO LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 175,000 | 175,000 |
PROSSER Wine Country Road Overlay Merlot Dr to Yakima River Bridge |
APP | 2023 | Construction | 477,238 | 551,971 | |
![]() |
PROSSER Old Inland Empire Highway Sidewalk W C/L to Wine Country Rd |
ATP | 2024 | Design | 171,000 | 1,721,000 |
![]() |
PULLMAN Bishop Boulevard Overlay Fairmount Dr to w/o SR 270 |
APP | 2024 | Design | 554,331 | 713,205 |
![]() |
PULLMAN Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 750,000 | 750,000 |
PUYALLUP 7th Street Sidewalk 9th St to 11th St |
ATP | 2024 | Application | 350,000 | 579,000 | |
RAYMOND Gerber Avenue/Elwood Street/Harvard Street Overlay Multiple Locations |
SCPP | 2024 | Design | 425,267 | 447,650 | |
RAYMOND Fowler Street Overlay Multiple Locations |
SCPP | 2024 | Design | 842,061 | 886,380 | |
RAYMOND 2021 Rehabilitation and Overlay Fowler St to Ocean Ave |
SCAP | 2023 | Construction | 1,094,707 | 1,153,659 | |
REARDAN 2021 Overlay Multiple Locations |
SCPP | 2023 | Bid Auth | 295,746 | 295,746 | |
REDMOND Redmond Way (SR 202) and NE 76th Street Bear Ck to E Lake Samm Pkwy; SR 202 to Fred Meyer |
UAP | 2021 | Construction | 1,588,500 | 4,659,028 | |
REDMOND Bel Red Road Buffered Bike Lanes NE 30th St to W Lake Sammamish Pkwy |
ATP | 2024 | Application | 650,000 | 3,062,000 | |
RENTON Duvall Avenue NE NE 9th St to NE Sunset Blvd (SR 900) |
UAP | 2017 | Construction | 3,968,289 | 7,768,672 | |
RENTON Rainier Avenue S/N S 3rd St (SR 900) to NW 3rd Pl |
UAP | 2023 | Construction | 5,355,150 | 26,454,839 | |
RICHLAND Downtown Connectivity Improvements George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St |
UAP | 2024 | Application | 3,500,000 | 16,781,600 | |
![]() |
RICHLAND Gage Blvd/Center Parkway Gage Blvd to Tapteal Dr |
UCP | 2007 | Construction | 644,320 | 7,321,641 |
![]() |
RICHLAND Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 450,000 | 450,000 |
![]() |
RICHLAND Jadwin Avenue Sidewalk Davenport St to Gillespie St |
ATP | 2024 | Application | 225,324 | 304,493 |
RIDGEFIELD S Royle Road S 15th St to S 5th Way |
UAP | 2023 | Design | 2,952,100 | 3,949,750 | |
RITZVILLE Main Avenue Palouse St to Jackson St |
SCAP | 2022 | Construction | 355,601 | 389,631 | |
RITZVILLE 6th Avenue Sidewalk Division St to Chelan St |
ATP | 2024 | Design | 485,654 | 512,715 | |
![]() |
ROY 2021 Overlay McNaught St to Roy Elementary School |
SCPP | 2023 | Design | 130,664 | 137,540 |
![]() |
ROY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 100,000 | 100,000 |
ROYAL CITY 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 229,648 | 241,735 | |
ROYAL CITY 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Design | 678,775 | 714,500 | |
![]() |
ROYAL CITY Apple Avenue NE Sidewalks Camelia St to Slate Ln NE |
SP | 2023 | Design | 298,396 | 314,100 |
RUSTON 2021 Court Street Seal Coat Baltimore to Dead End |
SCPP | 2023 | Design | 54,523 | 57,393 | |
RUSTON Park Street End of Road to Bennett St |
SCAP | 2023 | Design | 628,502 | 708,502 | |
SEATAC 34th Avenue S S 160th St to S 166th St |
UAP | 2022 | Construction | 2,000,000 | 6,812,836 | |
![]() |
SEATAC Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 600,000 | 600,000 |
SEATTLE East Marginal Way S S Atlantic to S Spokane St. |
UAP | 2020 | Construction | 3,000,000 | 19,393,875 | |
SEATTLE 4th Avenue S Walkway S Royal Brougham Way to I 90 Off-Ramp |
SP | 2023 | Bid Auth | 247,000 | 329,016 | |
![]() |
SEDRO WOOLLEY Cook Road Overlay W C/L to W Ferry St |
APP | 2024 | Design | 452,109 | 531,893 |
SEDRO WOOLLEY Township Street (SR 9) John Liner Rd / McGarigle Rd Intersection |
UAP | 2023 | Design | 2,033,936 | 2,711,915 | |
![]() |
SEDRO WOOLLEY Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 500,000 | 500,000 |
SEDRO WOOLLEY Cascade Trail West Extension Phase 2A Holtcamp Rd to Hodgin St |
ATP | 2024 | Design | 326,000 | 860,000 | |
![]() |
SELAH Fremont Avenue Overlay 16th St to 11th St |
APP | 2024 | Application | 375,885 | 417,650 |
SELAH Valleyview Avenue / Third Street / Southern Avenue S First Ave to S First Ave |
SP | 2023 | Bid Auth | 400,000 | 1,063,850 | |
SEQUIM N Sequim Avenue Hendrickson St to Old Olympic Hwy |
UAP | 2022 | Design | 933,205 | 2,666,300 | |
SHELTON FY 2020 Overlay Project Multiple Locations |
APP | 2020 | Construction | 390,390 | 443,767 | |
SHELTON Railroad Avenue 8th Street to City Limits |
SP | 2020 | Construction | 370,010 | 1,144,450 | |
SHORELINE 145th Street (SR 523) 3rd Ave NE to 5th Ave NE (I-5 Interchange) |
UAP | 2023 | Design | 5,000,000 | 30,200,000 | |
SHORELINE N 145th Street (SR 523) Phase 1 Corliss Ave N to 3rd Ave NE |
UAP | 2024 | Application | 5,000,000 | 12,380,098 | |
![]() |
SHORELINE Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 600,000 | 600,000 |
SNOHOMISH Avenue D Overlay Multiple Locations |
APP | 2023 | Design | 94,775 | 111,500 | |
SNOHOMISH 2022 Overlay Award Multiple Locations |
APP | 2024 | Application | 424,999 | 500,000 | |
SNOHOMISH COUNTY 35th Avenue SE/39th Avenue SE SR 524 to 180th St SE |
UAP | 2021 | Construction | 5,000,000 | 10,523,373 | |
SNOHOMISH COUNTY 35th Avenue W 156th St SW to 148th St SW |
UAP | 2023 | Design | 3,352,320 | 4,190,400 | |
SNOHOMISH COUNTY Larch Way Roundabout Locust Wy and Logan Rd |
UAP | 2024 | Design | 2,500,000 | 3,333,579 | |
![]() |
SNOHOMISH COUNTY Hilltop Elementary Sidewalk Damson Rd MP 0.18 to MP 0.24 |
ATP | 2024 | Design | 250,000 | 318,000 |
![]() |
SNOQUALMIE 384th Ave SE Sidewalk Newton Ave to SE Kimball Creek Dr |
ATP | 2024 | Design | 548,856 | 4,093,991 |
SOAP LAKE 2021 Small City Maintenance Multiple Locations |
SCPP | 2023 | Design | 15,000 | 15,000 | |
![]() |
SOAP LAKE Canna Street and 1st Avenue NE Main Ave E to SR 17 |
SCAP | 2023 | Design | 871,740 | 898,700 |
SOAP LAKE Main Avenue W Cherry St S to Ginkgo St S |
SCAP | 2024 | Application | 1,150,000 | 1,150,000 | |
![]() |
SOUTH BEND Broadway Avenue Overlay Adams St to Monroe St |
SCPP | 2024 | Design | 284,957 | 284,957 |
SOUTH BEND Broadway Avenue Harrison St to Monroe St |
SCAP | 2023 | Design | 543,162 | 543,162 | |
![]() |
SOUTH CLE ELUM 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 29,136 | 29,136 |
![]() |
SPANGLE 2022 Overlay Project Multiple Locations |
SCPP | 2023 | Construction | 89,160 | 89,160 |
![]() |
SPOKANE Thor / Freya Couplet Hartson Ave to 150ft n/o Sprague Ave |
UAP | 2022 | Construction | 701,902 | 8,712,785 |
![]() |
SPOKANE Thor / Freya Couplet Hartson Ave to 150ft n/o Sprague Ave |
UAP | 2022 | Design | 248,098 | 2,906,579 |
SPOKANE Maple Street and Walnut Street 5th Ave to 1st Ave |
UAP | 2024 | Design | 920,400 | 1,534,000 | |
![]() |
SPOKANE Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 300,000 | 300,000 |
SPOKANE North River Drive Washington St to 800 ft E |
SP | 2021 | Construction | 400,000 | 1,503,458 | |
SPOKANE Haven Street Sidewalk Rockwell Ave to Heroy Ave |
SP | 2023 | Design | 207,370 | 296,244 | |
SPOKANE COUNTY Bigelow Gulch Road Progress Rd to Wellesley Ave |
UAP | 2021 | Construction | 2,065,000 | 5,410,704 | |
![]() |
SPOKANE COUNTY Lincoln Road Crestline St to Market St |
UAP | 2022 | Design | 950,000 | 1,453,000 |
SPOKANE COUNTY 57th Avenue Mt Vernon St (MP 0.88) to Palouse HWY (MP 1.75) |
UAP | 2023 | Design | 1,566,400 | 1,958,000 | |
SPOKANE COUNTY Hatch Road Phase 1 MP 0.60 to MP 1.10 |
UAP | 2024 | Application | 1,508,999 | 2,011,000 | |
SPOKANE VALLEY Sullivan Road Sprague Ave to 8th Ave |
UAP | 2023 | Design | 1,641,462 | 3,463,388 | |
SPOKANE VALLEY Broadway Avenue Concrete Intersection Park Rd |
UAP | 2024 | Design | 1,963,070 | 2,453,838 | |
![]() |
SPOKANE VALLEY Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 |
SPOKANE VALLEY 8th Avenue Coleman Rd to Park Rd |
SP | 2023 | Design | 260,700 | 434,400 | |
SPOKANE VALLEY 8th Avenue Pedestrian and Bicycle Fancher Rd to Park Rd |
ATP | 2024 | Design | 424,891 | 849,783 | |
![]() |
SPRAGUE 2022 County Chip Seal Multiple Locations |
SCPP | 2023 | Bid Auth | 80,115 | 80,115 |
SPRAGUE 4th Street Sidewalk SR 23 to E St |
ATP | 2024 | Design | 490,900 | 490,900 | |
STARBUCK 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 127,005 | 127,005 | |
STEILACOOM Townwide RRFB Project Steilacoom Blvd, Union Ave and Puyallup St |
ATP | 2024 | Design | 255,480 | 340,640 | |
![]() |
STEVENSON 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 144,907 | 152,534 |
![]() |
STEVENSON McEvoy Lane Overlay W End to E End |
SCPP | 2024 | Application | 74,146 | 78,049 |
![]() |
STEVENSON Loop Street Columbia Ave to E C/L |
SCAP | 2024 | Application | 460,422 | 487,998 |
![]() |
SUMNER Stewart Road White River Bridge Butte Ave E to 140th Ave Ct E |
UAP | 2024 | Application | 6,000,000 | 27,447,350 |
![]() |
SUMNER Elm Street Sidewalks Bonney Ave to Wright Ave |
ATP | 2024 | Application | 359,200 | 552,484 |
![]() |
SUNNYSIDE Yakima Valley Highway Overlay 1100ft s/o Edison Ave to Lincoln Ave |
APP | 2024 | Application | 329,580 | 366,200 |
SUNNYSIDE 6th Street North Ave to Decatur Ave |
SP | 2023 | Construction | 348,542 | 4,256,439 | |
TACOMA E 64th Street McKinley Ave E to Portland Ave |
UAP | 2023 | Design | 4,000,000 | 8,169,000 | |
![]() |
TACOMA Sheridan Avenue Phase 1 S 72nd St to S 64th St |
UAP | 2024 | Design | 3,560,000 | 5,954,332 |
![]() |
TACOMA Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 450,000 | 450,000 |
TACOMA S Yakima Avenue Sidewalk S 67th St to S 70th St |
SP | 2023 | Design | 219,857 | 297,910 | |
TACOMA School Safety S 40th St and M St |
ATP | 2024 | Design | 292,664 | 395,410 | |
TEKOA 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Design | 187,700 | 187,700 | |
TEKOA 2022 Maintenance Project Multiple Locations |
SCPP | 2024 | Design | 11,725 | 11,725 | |
TEKOA Main Street Sidewalk Crosby St to Broadway St |
SP | 2023 | Construction | 94,707 | 94,707 | |
TENINO Ritter Street S. Improvements Sussex Ave W to Park Ave W |
SCAP | 2022 | Construction | 629,501 | 662,633 | |
![]() |
THURSTON COUNTY Marvin Road SE 22nd Ave to Union Mills Rd |
UAP | 2024 | Application | 3,750,000 | 7,009,459 |
![]() |
THURSTON COUNTY Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 600,000 | 600,000 |
![]() |
TIETON Franklin Road North Fork Cowiche Creek |
SP | 2021 | Construction | 173,020 | 222,667 |
![]() |
TONASKET Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 50,000 | 50,000 |
TONASKET 4th Street Multimodal Multiple Locations |
ATP | 2024 | Application | 395,277 | 395,277 | |
TOPPENISH Jackson Street and Juniper Street Monroe Ave to Magnolia St |
UAP | 2023 | Design | 1,386,360 | 1,540,400 | |
TUKWILA West Valley Highway (SR 181) Strander Bvd to I-405 |
UAP | 2019 | Construction | 2,115,432 | 4,834,855 | |
![]() |
TUKWILA Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 400,000 | 400,000 |
![]() |
TUKWILA S 119th Street Crossing 42nd Ave S Crossing |
ATP | 2024 | Application | 174,999 | 240,500 |
TUMWATER Capitol Boulevard South, Trosper Road SE Ruby St to Market, Linda St to I-5 |
UAP | 2019 | Construction | 9,829,120 | 18,424,998 | |
![]() |
TUMWATER Tumwater Boulevard NB I-5 On/Off Ramp Intersection |
UAP | 2024 | Application | 2,250,000 | 6,250,000 |
![]() |
TUMWATER Linwood Avenue Sidewalk Susitna Ln to 2nd Ave |
SP | 2023 | Design | 371,250 | 825,000 |
![]() |
TWISP 2022 Overlay Award Multiple Locations |
SCPP | 2024 | Design | 375,110 | 416,785 |
![]() |
TWISP Cascade Drive Airport Dr to Airport Dr |
SCAP | 2023 | Construction | 270,625 | 270,625 |
![]() |
TWISP Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 50,000 | 50,000 |
![]() |
UNION GAP Longfibre Road Overlay Valley Mall Blvd to Ahtanum Rd |
APP | 2023 | Bid Auth | 320,643 | 356,270 |
UNIONTOWN 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 224,753 | 224,753 | |
VADER FY 2022 Seal Coat Project Multiple Locations |
SCPP | 2022 | Construction | 30,126 | 30,126 | |
![]() |
VADER 2021 Seal Coat Multiple Locations |
SCPP | 2023 | Construction | 62,113 | 62,113 |
![]() |
VADER 2022 Seal Coat Award 7th St to N C/L |
SCPP | 2024 | Design | 36,597 | 36,597 |
VANCOUVER SE 1st Street SE 164th Avenue to SE 177th Avenue |
UAP | 2020 | Construction | 2,825,424 | 10,944,587 | |
VANCOUVER SE 1st Street SE 177th Ave to SE 192nd Ave |
UAP | 2021 | Design | 2,000,000 | 10,000,000 | |
VANCOUVER W Fourth Plain Boulevard Franklin St Intersection |
UAP | 2023 | Design | 540,176 | 675,220 | |
VANCOUVER NE 137th Avenue NE 49th St to NE Fourth Plain Blvd |
UAP | 2024 | Design | 3,250,000 | 23,539,000 | |
![]() |
VANCOUVER Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 500,000 | 500,000 |
VANCOUVER Devine Road Mill Plain Blvd to E 18th St |
SP | 2021 | Construction | 400,000 | 1,578,330 | |
![]() |
VANCOUVER Hazel Dell Avenue Multiuse Path Discovery Trail to Burnt Bridge Creek Greenway |
ATP | 2024 | Design | 500,000 | 683,000 |
WALLA WALLA Poplar Street / Alder Street S Colville St to Howard St |
UAP | 2022 | Construction | 2,719,681 | 5,618,283 | |
![]() |
WALLA WALLA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 |
![]() |
WALLA WALLA COUNTY Abbott Road Scarpelli Dr to Fern Ave |
SP | 2021 | Construction | 135,500 | 535,099 |
WAPATO 2022 Crack Seal Multiple Locations |
SCPP | 2024 | Application | 47,453 | 49,950 | |
WAPATO S Naches Avenue 1st St to 4th St |
SCAP | 2024 | Application | 806,550 | 849,000 | |
![]() |
WAPATO Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 50,000 | 50,000 |
WARDEN N County Road First St(SR 170) to N C/L |
SCAP | 2022 | Construction | 733,540 | 815,045 | |
![]() |
WARDEN Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 |
WARDEN W First Street (SR 170) Pathway S County Rd to Railroad R/W |
ATP | 2024 | Design | 57,375 | 425,000 | |
WASHOUGAL Evergreen Way Sidewalk 39th St to 42nd St |
SP | 2023 | Design | 239,000 | 299,664 | |
WENATCHEE Springwater Avenue Woodward Dr to Western Ave |
UAP | 2021 | Design | 1,900,000 | 2,453,680 | |
WENATCHEE McKittrick Street Pine St to Pershing St (City Limits) |
UAP | 2023 | Design | 2,298,110 | 2,872,640 | |
WENATCHEE Red Apple Road Vista Pl to Miller St |
UAP | 2024 | Application | 1,919,228 | 2,399,035 | |
![]() |
WENATCHEE Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 600,000 | 600,000 |
WEST RICHLAND N 62nd Avenue Overlay Van Giesen St to Harrington Rd |
APP | 2023 | Design | 196,588 | 231,279 | |
![]() |
WESTPORT Hancock Avenue Surf St to Anchor Dr |
SCAP | 2023 | Construction | 264,073 | 277,972 |
WESTPORT N Forrest Street Ocean Ave to 400 ft n/o Sprague Ave |
SCAP | 2024 | Design | 673,008 | 708,430 | |
![]() |
WHITE SALMON 2022 Seal Coat Award Multiple Locations |
SCPP | 2024 | Application | 284,500 | 299,963 |
WHITE SALMON NW Garfield Avenue W Jewett Blvd (SR 141) to NW Washington St |
SCAP | 2021 | Design | 262,873 | 292,081 | |
![]() |
WILKESON Citywide Crack Seal |
SCPP | 2023 | Construction | 3,750 | 3,750 |
![]() |
WILKESON Church Street (SR 165) Railroad St to Davis St |
SP | 2021 | Construction | 367,336 | 367,336 |
WINTHROP Crack Seal Project Multiple Locations |
SCPP | 2024 | Application | 17,756 | 18,690 | |
![]() |
WINTHROP Horizon Flats Road Twin Lakes Rd to 3650 feet south |
SCAP | 2023 | Design | 810,715 | 853,385 |
WINTHROP Castle Avenue / Corral Street Sidewalk Roses Hill Rd to Bluff Street |
SP | 2023 | Design | 377,416 | 397,280 | |
WOODLAND W Scott Avenue Railroad Tracks to Pacific Ave |
UAP | 2020 | Design | 1,132,794 | 1,258,660 | |
WOODLAND Guild Road and W Scott Avenue Schurman Way to Railroad Tracks |
UAP | 2020 | Design | 1,128,892 | 1,254,325 | |
![]() |
WOODLAND LED Streetlight Conversion PUD Owned |
LED | 2024 | Application | 55,120 | 55,120 |
![]() |
WOODLAND LED Streetlight Conversion City Owned |
LED | 2024 | Application | 41,776 | 41,776 |
YAKIMA N 1st Street MLK Blvd to J St |
UAP | 2023 | Design | 1,500,000 | 12,146,300 | |
![]() |
YAKIMA Nob Hill Boulevard Overlay S 15th Ave to S 28th Ave |
UAP | 2024 | Application | 1,335,000 | 1,668,750 |
![]() |
YAKIMA Complete Streets Award March 2022 Selection |
CSP | 2022 | Construction | 250,000 | 250,000 |
YAKIMA COUNTY Ahtanum Road Yakima C/L to S 52nd Ave |
UAP | 2018 | Design | 2,500,000 | 3,045,672 | |
YAKIMA COUNTY Ahtanum Road Yakima C/L to S 52nd Ave |
UAP | 2018 | Construction | 0 | 3,814,062 | |
ZILLAH 2021 Overlay Multiple Locations |
SCPP | 2023 | Closeout | 254,685 | 282,984 | |
![]() |
ZILLAH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 50,000 | 50,000 |
ZILLAH Downtown Sidewalk 6th St to 7th St First Ave to Second Ave |
SP | 2023 | Closeout | 236,249 | 262,499 |