| ABERDEEN Sumner Avenue (SR 101) Sidewalk Maple St to Williams St |
ATP | 2024 | Construction | 450,000 | 1,381,420 | |
| ABERDEEN US 101 Safety Improvements US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17 |
ATP | 2025 | Bid Auth | 450,000 | 2,205,000 | |
| AIRWAY HEIGHTS 10th Avenue Extension 10th Ave terminus to Hayford Rd |
UAP | 2022 | Construction | 2,467,406 | 3,799,424 | |
| AIRWAY HEIGHTS 6th Avenue Craig Rd to Russell St |
UAP | 2025 | Construction | 552,335 | 4,551,920 | |
![]() |
AIRWAY HEIGHTS Garfield U.S. 2 Roundabout Garfield Rd Intersection |
UAP | 2026 | Design | 2,018,552 | 3,889,039 |
| ALGONA Ellingson Road Overlay Pacific Ave to UPRR |
SCPP | 2025 | Construction | 704,176 | 786,918 | |
| ALGONA Algona Boulevard N Boundary Rd to S 5th St |
ATP | 2026 | Construction | 520,162 | 584,678 | |
| ALMIRA Citywide Maintenance Multiple Locations |
SCPP | 2026 | Construction | 242,608 | 242,608 | |
| ANACORTES Commercial Avenue (SR 20 Spur) 13th St to 11th St |
UAP | 2021 | Construction | 687,769 | 2,941,364 | |
| ARLINGTON 211th Place SR 530 to 67th Ave NE |
UAP | 2024 | Construction | 2,645,000 | 4,755,968 | |
| AUBURN Auburn Way S Widening Hemlock St to Poplar St |
UAP | 2025 | Construction | 3,187,534 | 7,700,517 | |
| AUBURN Regional Growth Center Improvements B St NE and 3rd St NE to Auburn Wy N and 4th St NE |
UAP | 2025 | Construction | 1,872,227 | 3,443,134 | |
| AUBURN 49th Street NE Auburn Wy N to D St NE |
CSP | 2026 | Construction | 504,000 | 807,829 | |
| BAINBRIDGE ISLAND NE Wyatt Way Eagle Harbor Dr NE |
ATP | 2025 | Construction | 350,928 | 3,896,124 | |
| BATTLE GROUND SE Grace Avenue - Phase II NE 1st St to SE Rasmussen Blvd |
UAP | 2023 | Design | 3,000,000 | 6,310,056 | |
| BELLEVUE 150th Avenue SE 28th St to SE 38th St |
UAP | 2024 | Construction | 3,990,000 | 13,381,395 | |
| BELLINGHAM Meridian St W Illinois St Roundabout |
UAP | 2022 | Construction | 575,000 | 1,105,689 | |
| BELLINGHAM 12th Street and Finnegan Way McKenzie St and 11th St |
UAP | 2024 | Construction | 400,000 | 1,696,658 | |
![]() |
BELLINGHAM James Street Multimodal Safety Improvements Telegraph Rd to Gooding Ave |
CSP | 2026 | Design | 950,000 | 3,219,000 |
| BINGEN City of Bingen 2025 Overlay Multiple Locations |
SCPP | 2026 | Closeout | 120,202 | 126,258 | |
| BINGEN SR 14 and Alder RRFB and IlluminationSidewalk Improvements Intersection of SR 14 and Alder St |
CSP | 2026 | Design | 216,505 | 227,900 | |
| BLACK DIAMOND Roberts Drive Reconstruction Morgan St to Ginder Creek Crossing |
UAP | 2026 | Design | 3,565,750 | 4,195,430 | |
| BLAINE Boblett Street Yew Ave to Ludwick Ave |
UAP | 2022 | Construction | 1,161,862 | 3,614,644 | |
![]() |
BONNEY LAKE LED Streetlight Conversion Citywide |
LED | 2025 | Construction | 157,500 | 157,500 |
| BREMERTON E 11th Street and Perry Avenue Pitt Avenue to E 17th Street |
UAP | 2020 | Construction | 4,341,916 | 7,287,140 | |
| BREMERTON Washington Avenue / 11th Street Pacific Ave to Manette Bridge |
UAP | 2023 | Construction | 1,742,143 | 7,260,650 | |
| BRIER RRFB Installation Multiple Locations |
ATP | 2026 | Closeout | 107,373 | 126,320 | |
| BUCKLEY W Mason Ave Overlay Hinkleman Ext Rd to S Naches St |
APP | 2026 | Construction | 326,515 | 377,300 | |
| BURIEN SW 148th Street 4th Ave SW to 6th Ave SW |
UAP | 2024 | Construction | 3,888,535 | 5,786,010 | |
![]() |
BURLINGTON LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 150,000 | 150,000 |
| CAMAS NW 38th Avenue NW Parker St to Grass Valley Park |
UAP | 2025 | Construction | 1,692,384 | 7,386,337 | |
| CAMAS NE Third Ave Pedestrian and Bicycle Improvements NE Adams Street to NE Cedar Street |
CSP | 2026 | Construction | 264,161 | 335,202 | |
| CASHMERE Sidewalk Improvements City of Cashmere |
ATP | 2026 | Design | 650,256 | 684,480 | |
| CASTLE ROCK 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 133,459 | 142,984 | |
| CASTLE ROCK 2025 ADA Improvements Multiple Locations |
CSP | 2026 | Construction | 373,445 | 393,100 | |
| CATHLAMET 2025 Maintenance Project Multiple Locations |
SCPP | 2026 | Closeout | 150,000 | 150,000 | |
| CATHLAMET Butler Street Reconstruction Main St(SR 409) to Una Ave |
SCAP | 2026 | Design | 341,387 | 341,387 | |
| CATHLAMET S 3rd Street Sidewalk Maple St to Alder St |
ATP | 2026 | Design | 224,887 | 224,887 | |
| CHEHALIS NW Louisiana Ave Overlay NW Louisiana Avenue from Chamber of Commerce Way through the roundabout at the southern leg of NW Arkansas Way |
APP | 2026 | Construction | 676,128 | 751,244 | |
| CHEHALIS SW 13th St Sidewalk and ADA Curb Ramp Improvements SW William Ave to SW Interstate Ave |
ATP | 2026 | Construction | 311,397 | 399,020 | |
| CHELAN Sanders Street Pedestrian Improvements E Okanogan Ave and E Wapato Ave |
SCAP | 2025 | Bid Auth | 99,999 | 819,759 | |
| CHELAN Lakeside Trail W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave. |
ATP | 2025 | Construction | 500,000 | 4,159,180 | |
| CHELAN Resin Bonded Stone Surfacing Pilot Bradley and Johnson Intersection Vicinity |
ATP | 2025 | Construction | 163,800 | 182,000 | |
| CHELAN COUNTY Easy St and School St Intersection School Street Roundabout |
UAP | 2025 | Design | 800,000 | 2,431,217 | |
| CHENEY Elm Street Overlay 6th Street Vicinity to Washington Street |
APP | 2025 | Construction | 1,346,492 | 1,500,092 | |
| CHENEY N 6th Street Roundabout Betz Road |
UAP | 2024 | Design | 966,854 | 1,074,283 | |
![]() |
CHENEY Elm Street Overlay Phase 2 N 6th St to 2nd St |
UAP | 2026 | Design | 1,172,277 | 1,302,530 |
![]() |
CHEWELAH 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Construction | 64,025 | 67,395 |
| CLARK COUNTY NE 152nd Avenue Padden Pkwy to NE 99th St |
UAP | 2025 | Construction | 3,500,000 | 10,439,417 | |
![]() |
CLARK COUNTY NE 179th St and NE 29th Ave Intersection Improvement NE 29th Ave Intersection |
UAP | 2026 | Construction | 3,000,000 | 20,795,738 |
| CLARK COUNTY NE 68th Street Sidewalk Highway 99 to NE St Johns Rd |
SP | 2023 | Closeout | 400,000 | 5,723,255 | |
| CLARK COUNTY Truman School Sidewalk NE 40th Ave and NE 44th St |
ATP | 2024 | Design | 200,000 | 430,000 | |
![]() |
CLARK COUNTY Highway 99 Sidewalk NE 102nd St NE 104th St |
ATP | 2026 | Construction | 500,001 | 1,152,241 |
| CLE ELUM 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Construction | 85,251 | 92,438 | |
| CLE ELUM Second Street Roundabout Second St (SR 903) and Stafford Ave |
SCAP | 2024 | Construction | 621,457 | 719,704 | |
| CLE ELUM First Street - Phase 3 Oakes Ave to Peoh Ave |
SCAP | 2025 | Construction | 677,032 | 5,499,790 | |
| CLE ELUM Second Street Pathway - Phase 1 N Stafford Ave to N Pennsylvania Ave |
ATP | 2025 | Construction | 548,798 | 590,182 | |
| COLLEGE PLACE SW Mojonnier Road Improvements College Ave to Bluvue Ln |
UAP | 2025 | Design | 1,922,008 | 6,772,008 | |
| COLLEGE PLACE Rose Street Multiuse Path Illumination NE Ash Ave to NE Carey Ct |
CSP | 2026 | Bid Auth | 1,825,692 | 2,028,547 | |
| COLLEGE PLACE SE 8th Street Sidewalk Birch Ave to Larch Ave |
ATP | 2025 | Construction | 397,767 | 494,322 | |
| COLTON 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 205,000 | 205,000 | |
| COLTON 2025 RRFB Steptoe St to Gregor Str |
ATP | 2026 | Bid Auth | 46,200 | 46,200 | |
| COLVILLE 2025 Pavement Preservation - Red Town Multiple Locations |
SCPP | 2026 | Construction | 2,000,000 | 2,105,263 | |
| CONNELL 2025 Crack Seal Multiple Locations |
SCPP | 2026 | Construction | 55,176 | 58,080 | |
| CONNELL W Fir Street Sidewalk Improvements SR 260 to Columbia Ave |
CSP | 2026 | Design | 492,030 | 546,700 | |
| COULEE CITY 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Construction | 562,916 | 563,916 | |
| COULEE CITY McEntee Street Improvements Walnut St to Chelan St |
SCAP | 2025 | Design | 124,201 | 920,000 | |
![]() |
COULEE DAM Sidewalk and ADA Ramp Replacement Town Limits |
CSP | 2026 | Design | 970,730 | 970,730 |
| COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Construction | 416,939 | 421,938 | |
![]() |
COULEE DAM ADA Ramp Upgrades Multiple Locations |
ATP | 2025 | Design | 108,985 | 108,985 |
| COUPEVILLE Front and N Main Street Sidewalks Multiple Locations |
ATP | 2024 | Construction | 170,060 | 484,711 | |
| COVINGTON Lakepointe Boulevard SR 18 to SE 258th St |
UAP | 2021 | Construction | 994,019 | 1,362,939 | |
| COVINGTON SE 256th Street 168th Ave SE to 173rd Ave SE |
UAP | 2026 | Design | 4,995,482 | 11,150,627 | |
| CUSICK 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Construction | 223,125 | 223,125 | |
![]() |
DAYTON 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 1,178,464 | 1,240,488 |
| DEER PARK 2025 Chip and Scrub Seal Multiple Locations |
SCPP | 2026 | Construction | 1,085,962 | 1,206,624 | |
| DES MOINES 24th Avenue S Kent-Des Moines Rd (SR 516) to S 223rd St |
UAP | 2021 | Construction | 4,212,947 | 7,493,224 | |
| DOUGLAS COUNTY 21st St NE N Baker Ave to N Devon Ave |
UAP | 2025 | Design | 1,518,791 | 1,786,813 | |
| DUVALL NE Big Rock Road Overlay 275th Ave NE to 279th Ln NE |
APP | 2026 | Construction | 295,797 | 362,997 | |
| EAST WENATCHEE Valley Mall Parkway Overlay Multiple Locations |
APP | 2026 | Construction | 445,823 | 524,497 | |
| EAST WENATCHEE 19th Street NW Phase 1 SR 28 to Bella Rio Apartments |
UAP | 2024 | Construction | 2,000,000 | 5,299,012 | |
| EAST WENATCHEE 5th Street NE Safety and Multimodal Improvements N Baker Ave to N Kentucky Ave |
UAP | 2025 | Design | 2,500,000 | 2,995,175 | |
| EATONVILLE Eatonville Hwy W Overlay Emerald Ridge Dr to Center St W |
SCPP | 2026 | Design | 533,573 | 561,656 | |
| EATONVILLE 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 159,652 | 168,080 | |
| EDMONDS 7th Avenue N Pedestrian Improvements Bell St to Caspers St(SR 524) |
CSP | 2026 | Design | 379,600 | 484,180 | |
| ELMA F Street Improvements Young St to Oakhurst St |
SCAP | 2026 | Design | 787,074 | 828,500 | |
| ENDICOTT 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 21,206 | 21,206 | |
| ENDICOTT 2025 Scrub Seal Multiple Locations |
SCPP | 2026 | Construction | 301,442 | 301,442 | |
| EPHRATA Nat Washington Way Overlay A Street SE to 2nd Ave SE |
APP | 2024 | Construction | 184,500 | 215,272 | |
| EVERSON 2025 Otta Seal Approximately Meade Ave to Everson Rd and Washington St. to Shuksan Way |
SCPP | 2026 | Construction | 848,989 | 943,674 | |
| EVERSON S Harkness Street W Main St to Lincoln St |
SCAP | 2025 | Design | 683,671 | 719,654 | |
| EVERSON SR 544 Sidewalk Portions of Meade Ave and Nolte Rd |
CSP | 2026 | Design | 564,867 | 3,069,938 | |
| FARMINGTON 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Construction | 104,163 | 104,163 | |
| FEDERAL WAY S 288th Street 16th Ave S to 34th Ave S |
UAP | 2022 | Construction | 2,081,535 | 3,178,973 | |
| FEDERAL WAY Pacific Highway S (SR 99) S C/L to Weigh Station |
UAP | 2023 | Design | 2,500,000 | 3,770,000 | |
| FEDERAL WAY Citywide Pedestrian Crossings RRFB Crossings |
ATP | 2024 | Construction | 350,001 | 563,637 | |
| FERNDALE Ferndale Terrace Hendrickson Ave to Vista Dr |
UAP | 2025 | Construction | 2,855,316 | 5,501,743 | |
| FIFE 20th Street E Multimodal Improvements 5410 20th St E to 6400 block |
UAP | 2025 | Design | 8,683,852 | 11,028,083 | |
![]() |
FIFE Port of Tacoma Road Interchange Phase 2A 12th Street E to 20th St E |
UAP | 2026 | Bid Auth | 5,000,000 | 65,159,177 |
| FIRCREST Alameda Avenue W Sidewalk Cypress Pt to Emerson St |
CSP | 2026 | Design | 472,556 | 555,947 | |
![]() |
FORKS 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,756,338 | 1,848,777 |
| FORKS West E Street 5th Ave to S Forks Ave (SR 101) |
SCAP | 2025 | Design | 549,613 | 578,540 | |
| GARFIELD 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,034,138 | 1,044,138 | |
| GEORGE 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Construction | 566,400 | 566,400 | |
| GEORGE W Montmorency Multiuse Path Washington Way S to Windsor Ave |
ATP | 2026 | Construction | 195,385 | 202,175 | |
| GIG HARBOR Wollochet Drive Signal Wagner Way |
UAP | 2025 | Construction | 1,227,050 | 1,718,804 | |
| GIG HARBOR 56th Street Roundabout 38th Ave |
UAP | 2026 | Design | 1,644,460 | 2,740,766 | |
| GIG HARBOR 38th Avenue Improvements Phase 2 56th St to Hunt St |
CSP | 2026 | Design | 750,000 | 4,456,572 | |
| GIG HARBOR Burnham Drive Sidewalk Eagles Club Driveway to 96th St |
ATP | 2025 | Construction | 1,524,574 | 4,933,502 | |
| GOLD BAR Orchard Avenue Overlay 5th St to 10th St |
SCPP | 2026 | Construction | 175,753 | 194,458 | |
| GOLDENDALE 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,000,000 | 1,052,632 | |
| GOLDENDALE Darland Drive Reconstruction Railroad Ave to Mill St |
SCAP | 2026 | Construction | 916,989 | 1,018,876 | |
| GRAND COULEE Spokane Way Improvements Alcan Rd to E Grand Coulee Ave (SR 174) |
SCAP | 2025 | Design | 126,876 | 1,015,000 | |
| GRANITE FALLS 2025 Overlay Multiple Locations |
SCPP | 2026 | Construction | 416,684 | 469,064 | |
| HARRINGTON ADA Ramp Replacement East Side of City |
ATP | 2026 | Construction | 250,832 | 250,832 | |
| HOQUIAM City of Hoquiam Safe Routes to School City of Hoquiam |
ATP | 2024 | Construction | 345,748 | 1,749,908 | |
| HUNTS POINT Hunts Point Lane Overlay Hunts Point Lane |
SCPP | 2026 | Construction | 255,212 | 289,569 | |
![]() |
ILWACO 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Design | 1,500,000 | 1,578,947 |
| INDEX 2025 Crack Seal Multiple Locations |
SCPP | 2026 | Design | 28,050 | 28,050 | |
| INDEX 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 341,120 | 341,120 | |
| IONE 2025 Street Maintenance City Wide Multiple Locations |
SCPP | 2026 | Construction | 142,738 | 142,738 | |
| ISSAQUAH Front Street S 135 ft s/o and 200 ft n/o SE Bush St Intersection |
CSP | 2026 | Construction | 244,805 | 331,006 | |
| KELSO 2025 Overlay Multiple Locations |
APP | 2026 | Construction | 392,896 | 462,231 | |
| KENMORE 61st Avenue NE Pedestrian and Bicycle Improvements NE 190th St to 62nd Ave NE |
UAP | 2026 | Construction | 2,213,330 | 3,768,303 | |
| KENT 76th Avenue S South Phase 2600ft s/o S 212th St to 3660 ft s/o S 212th St |
UAP | 2025 | Construction | 2,654,664 | 15,224,824 | |
| KENT 132nd Avenue SE Pedestrian Improvement Phase 3 SE 276th St to SE 278th Pl |
CSP | 2026 | Bid Auth | 490,000 | 613,000 | |
| KENT 83rd Avenue S Sidewalk S 224th St to 700ft s/o S 224th St |
ATP | 2026 | Bid Auth | 625,600 | 782,000 | |
| KING COUNTY 68th Avenue S / S 124th Street Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St |
UAP | 2023 | Design | 1,706,037 | 2,132,547 | |
| KING COUNTY 16th Avenue SW Overlay SW 100th St to SW 107th St |
UAP | 2026 | Construction | 949,964 | 1,234,086 | |
| KING COUNTY Renton Avenue S 76th Ave S to S 130th St |
ATP | 2026 | Design | 160,000 | 200,000 | |
| KIRKLAND 100th Avenue NE NE 138th Pl to NE 145th St |
UAP | 2021 | Construction | 3,300,000 | 21,430,791 | |
| KIRKLAND Pedestrian Crossing at Lake Washington Institute of Technology 132nd Ave NE |
ATP | 2025 | Construction | 131,355 | 174,330 | |
| KITSAP COUNTY SE Lund Avenue Harris Rd SE Intersection |
UAP | 2023 | Bid Auth | 3,664,358 | 4,585,448 | |
| KITSAP COUNTY Lund Avenue Roundabout Chase Rd Roundabout |
UAP | 2025 | Design | 2,668,198 | 3,335,249 | |
| LA CENTER 4th Street Cedar Ave to Highland Rd |
SCAP | 2026 | Design | 500,000 | 11,884,800 | |
| LA CENTER Pacific Highway Shared Use Path Larsen Dr to existing sidewalk |
ATP | 2026 | Design | 500,000 | 3,480,000 | |
| LACEY College Street NE Martin Way to 15th Ave NE |
UAP | 2022 | Construction | 3,080,000 | 5,819,212 | |
| LACEY Rainier Road Improvements 66th Ave SE to Yelm Hwy |
UAP | 2026 | Design | 3,030,000 | 5,050,000 | |
| LAKE FOREST PARK SR 104 40th Pl NE Roundabout |
UAP | 2021 | Construction | 2,945,378 | 7,874,557 | |
| LAKEWOOD S Tacoma Way Signal 92nd St S |
UAP | 2025 | Construction | 399,399 | 670,665 | |
| LAKEWOOD Custer Road W Bridgeport Way SW to 75th ST W |
UAP | 2025 | Design | 2,976,687 | 3,720,858 | |
| LAKEWOOD Nyanza Road SW Gravelly Lake Dr S to Gravelly Lake Dr N |
UAP | 2026 | Construction | 1,382,790 | 4,449,925 | |
| LAKEWOOD 112th Street and Idlewild Road Sidewalk Interlaaken Drive to Idlewild Elementary |
CSP | 2026 | Construction | 568,808 | 736,205 | |
| LAKEWOOD Steilacoom Boulevard SW Sidewalk 87th Ave SW to Weller Rd SW |
SP | 2023 | Construction | 442,680 | 5,661,272 | |
| LAKEWOOD Interlaaken Drive Sidewalk Washington Blvd to 112th St |
ATP | 2026 | Construction | 467,298 | 1,814,750 | |
| LONG BEACH Ocean Beach Blvd Pioneer Rd W to 26th St NW |
SCAP | 2026 | Construction | 625,000 | 1,258,339 | |
![]() |
LONG BEACH Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 75,000 | 75,000 |
| LONGVIEW 46th Avenue SR 4 to Olympia Way |
UAP | 2021 | Construction | 3,331,544 | 5,919,825 | |
| LONGVIEW Olympia Way and Nichols Blvd Multiple Locations |
UAP | 2025 | Construction | 1,747,877 | 2,352,651 | |
![]() |
LYNDEN 1st and Main St Overlay Main St. approx. 2nd St. to 1st St. and 1st St. approx. Grover St. to RR tracks |
APP | 2026 | Construction | 278,791 | 499,371 |
| LYNNWOOD Poplar Way Bridge 196th St SW to Alderwood Mall Blvd |
UAP | 2024 | Bid Auth | 5,000,000 | 42,085,000 | |
| LYNNWOOD 44th Avenue W Underpass Pedestrian and Bicycle Improvement s/o 200th St SW to 204th St SW |
CSP | 2026 | Design | 1,000,000 | 7,608,000 | |
| MALDEN 2024 Otta Seal Multiple Locations |
SCPP | 2025 | Construction | 477,470 | 477,470 | |
![]() |
MALDEN Roadway Restoration Multiple Locations |
SCAP | 2026 | Design | 93,311 | 1,866,223 |
| MAPLE VALLEY Maple Valley Highway (SR 169) SE 253rd Pl to SE 260th St |
UAP | 2024 | Construction | 2,261,668 | 15,295,345 | |
| MAPLE VALLEY SE Kent Kangley Road (SR 516) Sidewalk 800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE |
ATP | 2025 | Bid Auth | 742,383 | 927,980 | |
| MARCUS 2025 Fog Seal Multiple Locations |
SCPP | 2026 | Construction | 24,221 | 24,221 | |
| MARYSVILLE 156th Street NE Smokey Pt Blvd to Hayho Creek |
UAP | 2025 | Design | 1,440,000 | 1,800,000 | |
| MARYSVILLE 53rd Ave NE Shared Used Path 61st St NE to SR 528 |
ATP | 2024 | Construction | 320,000 | 2,036,464 | |
![]() |
MATTAWA 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,082,101 | 1,082,101 |
![]() |
MCCLEARY 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Closeout | 342,758 | 364,297 |
| MCCLEARY W Maple Street Sidewalk S 6th St to S Main St |
ATP | 2025 | Construction | 519,552 | 554,130 | |
| MEDICAL LAKE 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Construction | 160,337 | 168,776 | |
| MEDICAL LAKE 2025 Scrub Seal Multiple Locations |
SCPP | 2026 | Construction | 844,703 | 889,254 | |
| MEDICAL LAKE Lefevre Street Restriping and Sidewalk Idaho St to n/o James St |
ATP | 2024 | Construction | 639,400 | 695,000 | |
| MERCER ISLAND Island Crest Way Shared Use Path Phase 1 Island Park Elementary to SE 60th St |
ATP | 2026 | Design | 850,000 | 1,620,270 | |
| MESA 2024 Chip Seal Multiple Locations |
SCPP | 2025 | Construction | 359,766 | 281,479 | |
![]() |
METALINE FALLS 2025 Street Maintenance Multiple Locations |
SCPP | 2026 | Construction | 107,945 | 107,945 |
| MILLWOOD 2025 Empire Ave Pavement Preservation Argonne to Butler |
SCPP | 2026 | Construction | 108,555 | 114,268 | |
| MILLWOOD Argonne Road Reconstruction - Phase 2 E Trent Ave to 150 ft s/o S Frederick Ave |
SCAP | 2025 | Design | 1,409,230 | 1,483,400 | |
| MILLWOOD Argonne Road Reconstruction - Phase 1 150 ft s/o Frederick to N of Riverway |
SCAP | 2025 | Construction | 801,070 | 2,900,277 | |
| MILTON Porter Way Sidewalk Improvements 7th Ave to Juniper St |
ATP | 2026 | Design | 360,866 | 424,550 | |
| MONROE RRFB Crossings Multiple Locations |
ATP | 2026 | Construction | 70,090 | 87,613 | |
| MONROE Freylands Blvd and Main Street Sidewalk Fryelands Bvld to Main St Roundabout |
ATP | 2026 | Design | 269,000 | 338,500 | |
| MORTON 2024 Red Town Initiative Multiple Locations |
SCPP | 2025 | Construction | 783,930 | 825,190 | |
![]() |
MOSES LAKE 2025 Chip Seal Multiple Locations |
APP | 2026 | Construction | 914,998 | 1,566,305 |
![]() |
MOSES LAKE SR17 Yonezawa Roundabout Yonezawa Blvd Intersection |
UAP | 2026 | Design | 2,500,000 | 6,552,970 |
![]() |
MOSES LAKE Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 105,000 | 105,000 |
| MOSSYROCK City Wide ADA Retrofit City Wide |
CSP | 2026 | Design | 491,620 | 491,620 | |
| MOUNT VERNON Laventure Road Hoag Rd to Sigmar Ln |
UAP | 2025 | Construction | 853,184 | 1,208,709 | |
| MOXEE 2025 Crack Seal Multiple Locations |
SCPP | 2026 | Construction | 160,177 | 177,974 | |
| NAPAVINE Rush Road Stella Rd to Newaukum Valley Rd |
SCAP | 2026 | Design | 405,100 | 3,001,000 | |
| NEWCASTLE SE May Creek Park Drive NonMotorized Improvements Phase 2 SE 84th Pl to 129th Ave SE |
ATP | 2026 | Construction | 489,010 | 2,185,185 | |
![]() |
NEWPORT 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 238,628 | 251,188 |
| NORMANDY PARK Marine View Drive OverlayTh SW 197th St to Edgecliff Dr SW |
APP | 2026 | Construction | 263,329 | 318,852 | |
| NORTH BEND South Fork Road Extension SR 202 to North Bend Wy |
UAP | 2026 | Design | 4,244,612 | 7,074,353 | |
| NORTH BEND North Bend Way Tollgate Park Entrance to Ribary Creek Bridge |
CSP | 2026 | Design | 1,002,518 | 1,222,585 | |
| NORTH BEND SR202 Sidewalk Gap North Bend Way to RR Tracks |
ATP | 2025 | Construction | 125,455 | 158,843 | |
| OAK HARBOR SW Swantown Ave Overlay SW Heller St to SW Fort Nugent Ave |
APP | 2026 | Construction | 400,356 | 698,469 | |
| OAK HARBOR NE 7th Avenue e/o Oak Harbor St to Harvest Dr |
UAP | 2024 | Construction | 702,174 | 3,001,533 | |
![]() |
OAK HARBOR LED Streetlight Conversion PSE Owned |
LED | 2019 | Construction | 220,000 | 220,000 |
![]() |
OAKESDALE 2025 Seal Coat Multiple Locations |
SCPP | 2027 | Construction | 1,018,000 | 1,068,000 |
| OAKESDALE ADA Ramp Replacement Entire Town |
CSP | 2026 | Design | 400,000 | 400,000 | |
| OAKVILLE School Street and W Pine Street SR 12 to Ash St and SR 12 to School St |
SCAP | 2024 | Construction | 593,740 | 593,740 | |
![]() |
OAKVILLE City Wide ADA Retrofit Multiple Locations |
CSP | 2026 | Design | 372,620 | 372,620 |
| ODESSA 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Construction | 769,615 | 769,615 | |
| OKANOGAN 3rd Avenue Improvements Irene St to Greta St |
SCAP | 2025 | Construction | 1,166,037 | 1,228,658 | |
| OLYMPIA Fones Road SE Pacific Ave SE to 18th Ave SE |
UAP | 2023 | Construction | 2,000,000 | 17,979,962 | |
![]() |
OLYMPIA Complete Streets Award March 2022 Selection |
CSP | 2023 | Construction | 300,000 | 300,000 |
| OMAK Jonathan Avenue Pine St to Quince St |
SCAP | 2025 | Construction | 669,661 | 705,656 | |
| OMAK Central Ave Reconstruction Phase II Cedar St to Fir St |
SCAP | 2025 | Construction | 957,990 | 1,009,410 | |
| OROVILLE 2025 Chip Seal Multiple Locations |
SCPP | 2026 | Design | 209,409 | 220,430 | |
| ORTING Kansas Street Reconstruction SR 162 to Coe Ln |
UAP | 2025 | Bid Auth | 4,420,363 | 4,911,515 | |
![]() |
ORTING LED Streetlight Conversion Citywide |
LED | 2025 | Construction | 49,000 | 49,000 |
| PACIFIC Ellingson Overlay West Valley Hwy to UPRR Crossing |
APP | 2025 | Design | 1,607,270 | 1,786,103 | |
| PACIFIC Interurban Trail Crossing Improvements Ellingson Rd |
ATP | 2025 | Design | 79,240 | 88,044 | |
| PASCO Court Street Roundabout Rd 68 Roundabout |
UAP | 2025 | Construction | 1,415,000 | 2,950,731 | |
| PE ELL 2025 Otta Seal Multiple Locations |
SCPP | 2026 | Design | 171,128 | 171,128 | |
| PIERCE COUNTY 122nd Avenue E 146th St Ct E to 136th St E |
UAP | 2025 | Design | 5,000,000 | 18,501,901 | |
| PIERCE COUNTY 122nd Avenue E 153rd St Ct E to 146th St Ct E |
UAP | 2026 | Design | 4,999,999 | 13,151,000 | |
| PIERCE COUNTY 2025 RRFB School Crossing Gem Height Dr @ 94th Ave E and 182nd St E and Ainsworth Ave S @ Garfield St |
ATP | 2025 | Construction | 712,816 | 1,444,898 | |
| POMEROY Main Street Sidewalk S 17th St to 25th St |
CSP | 2026 | Design | 999,700 | 999,700 | |
| PORT ANGELES Marine Drive Overlay Hill Street to Mill Bridge |
APP | 2026 | Construction | 528,658 | 704,877 | |
| PORT ANGELES 8th Street Lincoln St to A St |
UAP | 2024 | Construction | 1,674,761 | 2,194,761 | |
| PORT ANGELES Peabody St ADA Improvements Lauridsen St to First St |
CSP | 2026 | Design | 590,439 | 694,634 | |
| PORT ORCHARD Bethel Avenue Bethel Rd, Lincoln Ave SE, Mitchell Rd SE |
UAP | 2023 | Construction | 985,493 | 1,241,866 | |
![]() |
PORT ORCHARD LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 200,000 | 200,000 |
| PORT TOWNSEND Tyler Street Overlay Jefferson St to Lawrence St |
APP | 2024 | Construction | 303,077 | 604,172 | |
![]() |
PORT TOWNSEND 2025 Chip Seal Multiple Locations |
APP | 2026 | Closeout | 179,060 | 280,563 |
![]() |
PORT TOWNSEND Lawrence Street Multimodal Improvements Harrison St to Walker St |
UAP | 2026 | Design | 2,992,000 | 4,131,000 |
| PORT TOWNSEND Washington Street and Walker Street Improvements Washington St and Gaines St to Walker St and Jefferson St |
ATP | 2025 | Bid Auth | 198,600 | 234,000 | |
| POULSBO Noll Road - Segment 3A Mesford Rd to NE Kevos Pond Dr |
UAP | 2022 | Construction | 1,510,402 | 7,686,518 | |
| POULSBO Noll Road Phase 3B Lincoln Rd NE to Kevos Pond Dr |
UAP | 2024 | Construction | 1,049,598 | 4,138,894 | |
![]() |
POULSBO LED Streetlight Conversion PSE Owned |
LED | 2021 | Construction | 175,000 | 175,000 |
| PROSSER Alexander Court Improvements Highland Dr to Paterson Ave |
UAP | 2026 | Bid Auth | 909,391 | 1,113,700 | |
| PUYALLUP 7th Street Sidewalk 9th St to 11th St |
ATP | 2024 | Design | 350,000 | 579,000 | |
| REDMOND Bel Red Road Buffered Bike Lanes NE 30th St to W Lake Sammamish Pkwy |
ATP | 2024 | Construction | 650,000 | 4,041,841 | |
| RENTON Rainier Avenue S/N S 3rd St (SR 900) to NW 3rd Pl |
UAP | 2023 | Construction | 5,355,150 | 26,454,839 | |
| RENTON SW 43rd Street W C/L to SR 167 Ramps |
UAP | 2025 | Construction | 2,918,017 | 5,913,000 | |
| RENTON 116th Avenue SE Sidewalk SE 162nd St to SE 160th St |
CSP | 2026 | Construction | 202,687 | 1,014,282 | |
| RENTON S 7th Street Improvements Oakesdale Ave S to Burnett Ave S |
ATP | 2025 | Construction | 229,495 | 2,193,252 | |
| RICHLAND Downtown Connectivity Improvements George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St |
UAP | 2024 | Design | 3,500,000 | 16,781,600 | |
| RICHLAND Duportail Street Roundabouts Keene Rd to Queensgate Dr |
UAP | 2026 | Design | 1,572,686 | 3,773,521 | |
| RICHLAND George Washington Way Sidewalk Comstock St to Bradley Blvd |
ATP | 2026 | Design | 850,000 | 1,062,500 | |
| RITZVILLE 1st Avenue Improvements Division St to Palouse St |
SCAP | 2025 | Construction | 375,432 | 418,525 | |
| ROCK ISLAND Douglas Street Improvements Rock Island Rd to 3rd St SW |
SCAP | 2025 | Design | 106,850 | 898,350 | |
![]() |
ROCK ISLAND Saunders Road Shared Use Path City of Rock Island Saunders Road |
CSP | 2026 | Design | 385,000 | 385,000 |
| ROCKFORD 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 35,298 | 35,298 | |
| ROCKFORD 2024 Pavement Preservation Multiple Locations |
SCPP | 2025 | Construction | 109,380 | 109,380 | |
![]() |
ROSLYN 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Construction | 488,876 | 514,606 |
| ROSLYN 2025 RRFB Intersection of 1st St and Pennsylvania Ave |
CSP | 2026 | Design | 76,000 | 80,000 | |
| ROYAL CITY Apple Avenue Reconstruction Road 13 SW to Poplar St |
SCAP | 2026 | Design | 1,071,220 | 1,127,600 | |
| RUSTON 2024 Overlay 52nd to Park Ave |
SCPP | 2025 | Construction | 352,222 | 449,078 | |
| SEATAC Airport Station Pedestrian Improvements S 176th St/32nd Ave S and S 180th St |
UAP | 2025 | Design | 4,000,000 | 27,417,979 | |
| SEATTLE East Marginal Way S S Atlantic to S Spokane St. |
UAP | 2020 | Construction | 3,000,000 | 19,393,875 | |
| SEATTLE 4th Avenue S Walkway S Royal Brougham Way to I 90 Off-Ramp |
SP | 2023 | Construction | 247,000 | 639,570 | |
![]() |
SEDRO WOOLLEY 2025 Overlay Multiple Locations |
APP | 2026 | Construction | 678,497 | 808,232 |
| SEDRO WOOLLEY Township Street (SR 9) John Liner Rd / McGarigle Rd Intersection |
UAP | 2023 | Construction | 3,404,134 | 4,459,703 | |
![]() |
SEDRO WOOLLEY JonesJohn Liner RR Undercrossing Reed St to 100ft w/o Sapp Rd |
UAP | 2026 | Design | 2,149,055 | 2,543,300 |
| SELAH 3rd Street Overlay Multiple Locations |
APP | 2026 | Construction | 441,636 | 525,767 | |
| SEQUIM Curb Ramp Replacement Project CSP City of Sequim |
CSP | 2026 | Construction | 704,000 | 1,003,915 | |
| SHELTON Olympic Highway North C S to Wallace Kneeland Blvd |
UAP | 2025 | Design | 3,688,752 | 4,098,614 | |
| SHORELINE 145th Street (SR 523) 3rd Ave NE to 5th Ave NE (I-5 Interchange) |
UAP | 2023 | Construction | 5,000,000 | 40,621,677 | |
| SHORELINE N 145th Street (SR 523) Phase 1 Corliss Ave N to 3rd Ave NE |
UAP | 2024 | Construction | 5,000,000 | 11,845,978 | |
| SHORELINE 145th Street Corridor Phases 2 and 3 Corliss Ave N to Interurban Trail |
UAP | 2026 | Design | 6,500,000 | 27,680,040 | |
| SHORELINE 8th Avenue NW Sidewalk Sunset School Park to Richmond Beach Rd NW |
ATP | 2025 | Construction | 330,000 | 2,483,693 | |
| SNOHOMISH 2022 Overlay Award Multiple Locations |
APP | 2024 | Construction | 373,084 | 438,923 | |
| SNOHOMISH Avenue D Overlay Multiple Locations |
APP | 2025 | Bid Auth | 455,353 | 535,710 | |
| SNOHOMISH N Bickford Avenue Overlay 3000 Blk to N C/L |
APP | 2026 | Design | 963,135 | 1,347,900 | |
| SNOHOMISH 13th Street Intersection Improvements Park Ave |
ATP | 2025 | Design | 177,539 | 208,870 | |
| SNOHOMISH 2025 RRFB Multiple Locations |
ATP | 2026 | Construction | 85,403 | 100,474 | |
| SNOHOMISH COUNTY 35th Avenue W 156th St SW to 148th St SW |
UAP | 2023 | Construction | 3,062,777 | 4,000,864 | |
| SNOHOMISH COUNTY Alderwood Mall Parkway SR 525 to 168th St SW |
UAP | 2025 | Design | 4,500,000 | 16,155,483 | |
| SNOHOMISH COUNTY 204th Street SW ADA Upgrades Various Locations |
CSP | 2026 | Construction | 391,618 | 586,892 | |
| SNOHOMISH COUNTY Puget Park Drive RRFBs Various |
ATP | 2025 | Construction | 242,371 | 372,878 | |
| SOAP LAKE Canna Street and 1st Avenue NE Main Ave E to SR 17 |
SCAP | 2023 | Construction | 1,002,500 | 1,039,580 | |
| SOAP LAKE Main Avenue W Cherry St S to Ginkgo St S |
SCAP | 2024 | Construction | 839,783 | 839,783 | |
| SOAP LAKE Daisy Street SR 17 Sidewalk Improvements Phase II Main Ave E to 3rd Ave SE |
SCAP | 2026 | Design | 76,425 | 566,100 | |
![]() |
SOUTH BEND 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 2,000,000 | 2,110,263 |
| SOUTH BEND First Street A St to C St |
SCAP | 2025 | Construction | 578,240 | 624,274 | |
| SOUTH BEND 2025 RRFBs Central Ave to Reid St |
CSP | 2026 | Design | 507,080 | 533,767 | |
| SOUTH PRAIRIE Pioneer Way E (SR 162) Emery St |
SCAP | 2025 | Design | 785,622 | 785,622 | |
| SPOKANE Maple Street and Walnut Street 5th Ave to 1st Ave |
UAP | 2024 | Construction | 920,400 | 2,681,883 | |
| SPOKANE Riverside Ave. Monroe St to Wall St |
UAP | 2025 | Design | 887,000 | 1,774,000 | |
| SPOKANE PalouseFreya Roundabout 150 feet south west and east of intersection and 250 ft north of the intersection |
UAP | 2026 | Design | 1,563,600 | 5,716,800 | |
| SPOKANE Spokane School Walk Routes Various |
CSP | 2026 | Design | 1,636,595 | 2,045,744 | |
| SPOKANE Driscoll Blvd Sidewalks Garland Ave to Wellesley Ave |
ATP | 2026 | Design | 831,500 | 1,663,000 | |
| SPOKANE COUNTY Hatch Road Phase 1 MP 0.60 to MP 1.10 |
UAP | 2024 | Construction | 1,511,795 | 2,019,726 | |
| SPOKANE COUNTY Hatch Road Reconstruction Phase 2 MP 1.10 to MP 1.63 |
UAP | 2025 | Construction | 1,707,846 | 2,134,808 | |
| SPOKANE COUNTY Crestline Street Sidewalks 57th Ave to 63rd Ave |
CSP | 2026 | Design | 807,040 | 1,014,000 | |
| SPRAGUE 4th Street Sidewalk SR 23 to E St |
ATP | 2024 | Design | 490,900 | 490,900 | |
| STANWOOD Twin City Mile Mainstreet Improvements 84th Ave NW to 88th Ave NW |
CSP | 2026 | Construction | 737,308 | 1,009,850 | |
| STEVENSON 2025 Overlay Seymour Street |
SCPP | 2026 | Design | 128,398 | 135,156 | |
| STEVENSON 1st Street Columbia St to Guardrail |
SCAP | 2025 | Closeout | 225,175 | 1,052,638 | |
| SULTAN Sultan Basin Road Overlay 137th Pl SE to SR 2 |
APP | 2026 | Construction | 611,774 | 684,750 | |
| SUMNER Stewart Road White River Bridge Butte Ave E to 140th Ave Ct E |
UAP | 2024 | Construction | 6,375,000 | 34,821,560 | |
| SUMNER Main St Crossings Alder Ave to 162nd Ave E |
CSP | 2026 | Design | 747,214 | 979,740 | |
| SUNNYSIDE ADA Ramp Replacement Multiple Locations |
CSP | 2026 | Construction | 365,668 | 459,601 | |
| TACOMA E 64th Street McKinley Ave E to Portland Ave |
UAP | 2023 | Construction | 3,026,443 | 6,255,753 | |
| TACOMA Sheridan Avenue Phase 1 S 72nd St to S 64th St |
UAP | 2024 | Construction | 3,560,000 | 6,148,185 | |
| TACOMA E Roosevelt Avenue Improvements E 38th St to E Sherman St |
UAP | 2026 | Construction | 2,266,166 | 3,104,837 | |
| TACOMA S 56th Street Crossing Improvements A St |
CSP | 2026 | Design | 673,421 | 841,777 | |
| TENINO Old Hwy 99 Overlay Huston to WWTP |
SCPP | 2026 | Construction | 416,527 | 438,448 | |
| THURSTON COUNTY Marvin Road SE 22nd Ave to Union Mills Rd |
UAP | 2024 | Construction | 3,750,000 | 5,643,310 | |
| THURSTON COUNTY Yelm Hwy and Spurgeon Crk Rd SE Intersection Improvements Spurgeon Crk Rd SE Intersection |
UAP | 2026 | Design | 3,470,000 | 4,450,000 | |
![]() |
TIETON 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Design | 500,000 | 526,316 |
| TONASKET Perfect Passage 1st Street to 4th Street |
CSP | 2026 | Construction | 1,017,153 | 6,298,435 | |
| TOPPENISH Jackson Street and Juniper Street Monroe Ave to Magnolia St |
UAP | 2023 | Design | 1,386,360 | 1,540,400 | |
| TOPPENISH Downtown Intersection Improvements Intersection Improvements |
CSP | 2026 | Design | 1,529,554 | 1,699,505 | |
| TUKWILA Southcenter Boulevard Signal 65th Avenue S |
UAP | 2025 | Construction | 848,903 | 1,328,075 | |
| TUKWILA S 124th St and 50th Pl S Vicinity of S 124th St and 50th Pl S intersection |
UAP | 2026 | Design | 900,404 | 1,151,487 | |
| TUMWATER Capitol Boulevard South, Trosper Road SE Ruby St to Market, Linda St to I-5 |
UAP | 2019 | Construction | 9,829,120 | 18,424,998 | |
| TUMWATER Tumwater Boulevard NB I-5 On/Off Ramp Intersection |
UAP | 2024 | Design | 2,250,000 | 6,250,000 | |
| TUMWATER Linwood Avenue Sidewalk Susitna Ln to 2nd Ave |
SP | 2023 | Construction | 371,250 | 1,741,572 | |
![]() |
TWISP Glover Street Revitalization 5th Ave to Twisp Ave |
CSP | 2026 | Design | 2,604,219 | 2,853,743 |
| TWISP North End SR 20 PedestrianBike Path Twisp River Br to Days Ln |
ATP | 2025 | Construction | 592,470 | 1,614,487 | |
| UNIVERSITY PLACE Grandview Avenue Roundabout 36th St |
UAP | 2025 | Construction | 764,152 | 1,043,932 | |
| VADER 2025 Seal Coat Multiple Locations |
SCPP | 2026 | Design | 131,606 | 131,606 | |
| VANCOUVER SE 1st Street SE 177th Ave to SE 192nd Ave |
UAP | 2021 | Construction | 1,892,899 | 11,369,281 | |
| VANCOUVER NE 137th Avenue NE 49th St to NE Fourth Plain Blvd |
UAP | 2024 | Construction | 3,250,000 | 28,658,398 | |
| VANCOUVER Main Street Pedestrian and Bicycle Improvements W 39th St to NE Hazel Dell Ave |
CSP | 2026 | Design | 500,000 | 2,480,675 | |
| VANCOUVER Hazel Dell Avenue Multiuse Path Discovery Trail to Burnt Bridge Creek Greenway |
ATP | 2024 | Design | 500,000 | 683,000 | |
| VANCOUVER SE McGillivray Blvd Chkalov Dr to 164th Ave |
ATP | 2026 | Design | 700,000 | 2,088,975 | |
| WALLA WALLA E Chestnut Street Roundabout Approximately 200ft north south east and west |
UAP | 2025 | Construction | 1,110,000 | 2,318,427 | |
| WALLA WALLA Myra Road South Extension SR 125 to Taumarson Rd |
UAP | 2026 | Construction | 1,981,760 | 9,548,331 | |
| WAPATO N Ahtanum Avenue Reconstruction W 1st St to End of Road |
SCAP | 2025 | Design | 807,975 | 850,500 | |
| WARDEN 2025 Red Town Initiative Multiple Locations |
SCPP | 2026 | Construction | 1,614,073 | 1,699,024 | |
| WARDEN 1st Street North Reconstruction N County Rd to Railroad tracks |
SCAP | 2025 | Construction | 908,922 | 956,760 | |
| WARDEN W First Street (SR 170) Pathway S County Rd to Railroad R/W |
ATP | 2024 | Design | 57,375 | 425,000 | |
| WASHOUGAL Shepherd Road Pedestrian Connection Washougal River Rd to Lebrun Blvd |
UAP | 2026 | Design | 3,473,835 | 4,342,294 | |
| WASHOUGAL Evergreen Way Sidewalk 42nd St to Schmid Park |
ATP | 2025 | Construction | 392,345 | 461,582 | |
| WENATCHEE Red Apple Road Vista Pl to Miller St |
UAP | 2024 | Design | 1,919,228 | 2,399,035 | |
| WENATCHEE 9th Street Corridor Improvements Miller St to BNSF Railroad Crossing |
UAP | 2025 | Design | 1,199,000 | 1,499,170 | |
| WENATCHEE Bridge Street Multimodal Corridor S Wenatchee Ave to S Columbia S |
CSP | 2026 | Design | 1,263,360 | 1,579,200 | |
| WEST RICHLAND Keene Road Overlay C/L to Bombing Range Rd |
APP | 2026 | Design | 400,000 | 748,638 | |
| WEST RICHLAND S Highlands Blvd and Keene Rd Intersection Improvements Keene Rd Intersection |
UAP | 2026 | Design | 782,000 | 920,000 | |
![]() |
WHITE SALMON Dock Grade Road Chip Seal SR14 to SR141 |
SCPP | 2026 | Construction | 133,723 | 140,761 |
| WILBUR 2024 Street Maintenance Multiple Locations |
SCPP | 2025 | Construction | 53,736 | 53,736 | |
| WILBUR 2024 Overlay Multiple Locations |
SCPP | 2025 | Construction | 735,329 | 735,329 | |
| WINLOCK NW Arden Avenue NW Fir St to W Walnut St |
SCAP | 2025 | Construction | 720,588 | 792,015 | |
| WINTHROP Bridge Street Improvement Project Riverside Ave to Bluff St |
ATP | 2025 | Design | 528,675 | 556,500 | |
| WOODINVILLE 131st Avenue NE (SR 202) Trestle Replacement NE 175th St to NE 177th Pl |
UAP | 2025 | Design | 5,000,000 | 16,287,938 | |
| WOODINVILLE 124th Ave NE Sidewalk NE 171st St to NE 165th St |
ATP | 2026 | Design | 750,000 | 2,453,700 | |
| YACOLT W Hoag Street Parcel Ave to Railroad Ave |
SCAP | 2025 | Closeout | 274,595 | 302,901 | |
| YACOLT Amboy Curb and ADA Retrofit Multiple Locations |
CSP | 2026 | Design | 288,373 | 303,551 | |
| YAKIMA N 1st Street MLK Blvd to J St |
UAP | 2023 | Construction | 1,500,000 | 11,378,665 | |
| YAKIMA 34th Avenue Roundabouts Fruitvale Boulevard to 34th Avenue |
UAP | 2025 | Construction | 1,768,780 | 3,534,874 | |
| YAKIMA S 72nd Avenue Roundabout W Washington Ave Intersection |
UAP | 2026 | Construction | 1,045,166 | 1,903,619 | |
| YARROW POINT 2025 Overlay Multiple Locations |
SCPP | 2026 | Construction | 568,892 | 640,602 | |
| ZILLAH 1st Avenue Pedestrian Improvements 1st Ave Bulbouts |
CSP | 2026 | Construction | 640,821 | 722,023 |