City of Federal Way's Citywide Pedestrian Crossings

P-P-113(P03)-1

P-P-113(P03)-1
Citywide Pedestrian Crossings

RRFB Crossings

FY 2024 Active Transportation Program
Current Phase : Design
Total TIB Funding : $350,001

County: King   |   Legislative District: 30   |   Project Length: 1,000.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency FEDERAL WAY
Funding Year 2024
Program ATP
Current Phase Design
Legislative District 30
Congressional District 9
Federal Route Number 1007
Project Length 1000.00 mi.
ADT 16,000
Functional Class Minor
Type of Work Pedestrian
Project Contact Richard Perez
Contact Email rick.perez@cityoffederalway.com
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 01/23/2023
Bid Auth. Approval 08/15/2024
Construction Approval 09/01/2024
Project Closeout 08/30/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 34,777 50,000
Right of Way 0 0
Total Design 34,777 50,000
     
Construction Engineering 32,956 47,382
Construction Contract 280,877 403,829
Other Construction 1,391 2,000
Total Construction 315,224 453,211
     
Total TIB Funding 350,001 503,211

Local Funding Partners

Funding Amount Percent
FEDERAL WAY 153,210 30.4%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 153,210 30.4%

Project Description

Install mid-block crossing treatments with rectangular rapid flashing beacons (RRFBs) and median refuge islands. The project will install RRFBs in two priority locations 1)1st Way S and S 340th St (North Leg), and 2) Weyerhaeuser Way and S 344th St (600 ft. South). Both locations will construct ADA compliant ramps, RRFBs, refuge islands to cut crossing distance to half-at-a-time, and illumination.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments