City of Vancouver's Hazel Dell Avenue Multiuse Path

P-W-184(P10)-1

P-W-184(P10)-1
Hazel Dell Avenue Multiuse Path

Discovery Trail to Burnt Bridge Creek Greenway

FY 2024 Active Transportation Program
Current Phase : Design
Total TIB Funding : $500,000

County: Clark   |   Legislative District: 49   |   Project Length: 800.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 03/13/2024

Project Information

Lead Agency VANCOUVER
Funding Year 2024
Program ATP
Current Phase Design
Legislative District 49
Congressional District 3
Federal Route Number 4231
Project Length 800.00 mi.
ADT 4,426
Functional Class Minor
Type of Work Pedestrian
Project Contact Emily Benoit
Contact Email emily.benoit@cityofvancouver.us
TIB Engineer Chris Langhoff
Last Payment Date 03/13/2024
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2022 01/05/2023
Bid Auth. Approval 04/30/2025
Construction Approval 06/01/2025
Project Closeout 06/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 74,671 102,000
Right of Way 0 0
Total Design 74,671 102,000
     
Construction Engineering 44,656 61,000
Construction Contract 380,673 520,000
Other Construction 0 0
Total Construction 425,329 581,000
     
Total TIB Funding 500,000 683,000

Local Funding Partners

Funding Amount Percent
VANCOUVER 183,000 26.8%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 183,000 26.8%

Project Description

Install a 10-foot multi-use path to be located on the west side of NE Hazel Dell Avenue. Install marked crossings with flashing beacons.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments