City of Puyallup's 7th Street Sidewalk

P-P-129(P02)-1

P-P-129(P02)-1
7th Street Sidewalk

9th St to 11th St

FY 2024 Active Transportation Program
Current Phase : Design
Total TIB Funding : $350,000

County: Pierce   |   Legislative District: 25   |   Project Length: 752.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 10/01/2024

Project Information

Lead Agency PUYALLUP
Funding Year 2024
Program ATP
Current Phase Design
Legislative District 25
Congressional District 10
Federal Route Number 3144
Project Length 752.00 mi.
ADT 500
Functional Class Collector
Type of Work Pedestrian
Project Contact Bryan Schermerhorn
Contact Email BSchermerhorn@PuyallupWA.gov
TIB Engineer Greg Armstrong
Last Payment Date 10/01/2024
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date   04/02/2024
Predesign Approval
Design Approval 02/01/2023 01/25/2023
Bid Auth. Approval 01/15/2025
Construction Approval 02/01/2025
Project Closeout 09/01/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 67,098 111,000
Right of Way 0 0
Total Design 67,098 111,000
     
Construction Engineering 0 0
Construction Contract 282,902 468,000
Other Construction 0 0
Total Construction 282,902 468,000
     
Total TIB Funding 350,000 579,000

Local Funding Partners

Funding Amount Percent
PUYALLUP 229,000 39.6%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 229,000 39.6%

Project Description

The project constructs of 752 feet of sidewalk and sidewalk ramp enhancements, of which 552 feet that will connect the gap identified in the Safe Routes to Schools plan and will improve mobility by eliminating barriers along the corridor significantly increasing safety.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.