TIB Project Information

City of Bellingham's 12th Street and Finnegan Way

8-2-156(045)-1

8-2-156(045)-1
12th Street and Finnegan Way

McKenzie St and 11th St

FY 2024 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $400,000

County: Whatcom   |   Legislative District: 40   |   Project Length: 0.50   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 02/06/2024

Project Information

Lead Agency BELLINGHAM
Funding Year 2024
Program UAP
Current Phase Design
Legislative District 40
Congressional District 2
Federal Route Number 5501
Project Length 0.50 mi.
ADT 11,000
Functional Class Minor
Type of Work Safety
Project Contact Chris Comeau
Contact Email ccomeau@cob.org
TIB Engineer Chris Langhoff
Last Payment Date 02/06/2024
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/28/2023 03/01/2023
Bid Auth. Approval 10/01/2024
Construction Approval 10/31/2024
Project Closeout 12/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 52,000 65,000
Right of Way 0 0
Total Design 52,000 65,000
     
Construction Engineering 40,000 50,000
Construction Contract 308,000 385,000
Other Construction 0 0
Total Construction 348,000 435,000
     
Total TIB Funding 400,000 500,000

Local Funding Partners

Funding Amount Percent
BELLINGHAM 100,000 20.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 100,000 20.0%

Project Description

With TIB funding, a full traffic signal could be constructed along with 2 user-activated Rectangular Rapid Flashing Beacons (RRFBs), and 400 linear feet of sidewalk. The 12th/Mill/Finnegan intersection could be signalized, a RRFB crosswalk could be installed on the south leg of Full traffic signal could be constructed along with 2 user-activated Rectangular Rapid Flashing Beacons (RRFBs), and 400 linear feet of sidewalk. The 12th/Mill/Finnegan intersection could be signalized, a RRFB crosswalk could be installed on the south leg of 11th/Finnegan Way to transit bus stops between the Fairhaven Village on the west side of Finnegan Way and the Fairhaven Library and South Hill Neighborhood on the east side. The 2012 Pedestrian Master Plan recommends concrete sidewalk along the west side of Finnegan Way from 11th Street to a point 400 linear feet (LF) to the south. Further south on the 12th Street/Finnegan Way corridor, a user-activated RRFB is needed at 12th/McKenzie between the Bellingham Housing Authority Chuckanut Square 101 affordable senior apartments and the local Haggen grocery store.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments