This project will address the need for safe pedestrian travel to and from the downtown businesses as well as public beach access where a wood boardwalk has rotten and allows for trips and slips.
Projects — TIB Project Information
TIB Project Information
Town of Coupeville's Front and N Main Street Sidewalks
P-W-827(P10)-1
P-W-827(P10)-1
Front and N Main Street Sidewalks
Multiple Locations
FY 2024 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $325,123
County: Island | Legislative District: 10 | Project Length: 0.05 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | COUPEVILLE |
Funding Year | 2024 |
Program | ATP |
Current Phase | Bid Authorization |
Legislative District | 10 |
Congressional District | 2 |
Federal Route Number | 9999 |
Project Length | 0.05 mi. |
ADT | 500 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Joe Grogan |
Contact Email | publicworks@townofcoupeville.org |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | CRA & BER |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 01/01/2024 | |
DAHP Assessment Date | 10/18/2024 | |
Predesign Approval | ||
Design Approval | 02/01/2023 | 02/06/2023 |
Bid Auth. Approval | 12/01/2024 | 11/25/2024 |
Construction Approval | 01/01/2025 | |
Project Closeout | 05/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 16,414 | 44,000 |
Construction Contract | 308,709 | 827,514 |
Other Construction | 0 | 0 |
Total Construction | 325,123 | 871,514 |
Total TIB Funding | 325,123 | 871,514 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COUPEVILLE | 546,391 | 62.7% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 546,391 | 62.7% |
Project Description
Replace existing wood boardwalk with concrete sidewalk on Front Street and extend sidewalk along Main Street.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |